AS-BUILT PHYSICAL ARCHITECTURE AND CAPACITY PLANNING Sample Clauses

AS-BUILT PHYSICAL ARCHITECTURE AND CAPACITY PLANNING. 17.1 The Service Provider shall prepare, maintain and keep up to date from time to time (and in any event within ten (10) Working Days of any change) a document detailing the physical architecture of each technical environment used for each Service Element (the "As-Built Physical Architecture"). The As-Built Physical Architecture shall include the following:
AutoNDA by SimpleDocs

Related to AS-BUILT PHYSICAL ARCHITECTURE AND CAPACITY PLANNING

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Physical Architecture 59.2.1 CenturyLink's network architecture in any given local exchange area and/or LATA can vary markedly from another local exchange area/LATA. Using one or more of the NIMs herein, the Parties will agree to a physical architecture plan for a specific LATA, or if appropriate based on other requirements in Section 59, Local Calling Area. The physical architecture plan, as described in the Local Interconnection POI Profile, will be discussed during joint implementation planning. CLEC and CenturyLink agree to Interconnect their networks through existing and/or new Interconnection Facilities between CLEC switch(es) and CenturyLink's End Office Switch(es) and/or Tandem Switch(es). The physical architecture plan will be in accordance with Forecasting and Planning requirements in Article IV.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Information Technology Enterprise Architecture Requirements If this Contract involves information technology-related products or services, the Contractor agrees that all such products or services are compatible with any of the technology standards found at xxxxx://xxx.xx.xxx/iot/2394.htm that are applicable, including the assistive technology standard. The State may terminate this Contract for default if the terms of this paragraph are breached.

Time is Money Join Law Insider Premium to draft better contracts faster.