Building Bulk and Scale Sample Clauses

Building Bulk and Scale. 11.3.3.1 Details of building bulk and scale for the Site Development Plan should be provided as part of a Material Change of Use application for any building arising from Column 2 uses of Table 1 – Supplementary Table of Development – Precinct 6, of this document. The Material Change Of Use application should demonstrate the following: Avoid blank façade walls • ensure the length of a uniform elevational treatment visible to public road, streets or parks without variation or articulation is no more than 10m). Projecting planes of the façade and a stepped façade profile • Create variation in the plane of façades visible to public road, streets or parks through recessing and projecting areas or elements to create distinctive areas of solid and void. ❖ Each recessed area or projected area should be a minimum of 1.0m in depth and cover a minimum area of 3sqm. Recessing Lower Floors and rooflines • recess lower floors and incorporate colonnades or feature elements to create human scale in the building and further reinforce the street edge. Where colonnades or feature elements are used these should be located within the transitional zone setback 0-3m from the front property boundary and recessed areas of the main building form should be setback a minimum of 3m. Projecting building entry canopies • provide articulated building entrances to break up the building mass. Utilizing Screens, pergolas or awnings • create variation in the external materials to break up the façade by utilizing screens, pergolas, awnings or other materials.
AutoNDA by SimpleDocs
Building Bulk and Scale. 11.6.1 Details of building bulk and scale should be provided as part of a Material Change of Use application. The Material Change of Use application should demonstrate the following: Building Mass ■ Buildings are to be located at places of highest activity or highest amenity. Avoid blank façade walls ■ Ensure the length of a uniform elevational treatment visible to public road, streets or parks without variation or articulation is no more than 15m. Projecting planes of the façade and a stepped façade profile ■ Create variation in the plane of façades visible to public road, streets or parks through recessing and projecting areas or elements. Recessing Lower Floors and rooflines ■ Incorporate colonnades or feature elements to create human scale in the building. Where colonnades or feature elements are used these should be located within the transitional zones. ■ The visual impact of extensive flat roofs, lift overruns, roof plant and other utilitarian elements on the roof are to be minimised and / or screened with a parapet or other architectural feature. Projecting building entry canopies ■ Provide articulated building entrances to break up the building mass. Plant and equipmentAir conditioning/ventilation plant and equipment located externally around buildings must be treated as an integral part of the building form and screened from view to match with surrounding materials; and ■ If satellite dishes are installed, they must be located in visually unobtrusive locations, preferably near screens to plant or services area. Where located on roofs, satellite dishes must be positioned to reduce visibility from the adjacent roads and public open space and, where practicable, located away from side walls, parapets or eave lines of buildings. Utilizing Screens, pergolas or awnings ■ Create variation in the external materials to break up the façade by utilizing screens, pergolas, awnings or other materials.
Building Bulk and Scale. 9.3.2.1 Details of building bulk and scale for the Site Development Plan should be provided as part of a Material Change of Use application for any building arising from Column 2 and 3 uses of Table 1 – Supplementary Table of Development – Precinct 13 of this document. The Material Change of Use application is to demonstrate the following:

Related to Building Bulk and Scale

  • Building Codes The following Building Codes, in the latest editions approved by the Georgia Department of Community Affairs, shall be used. (See O.C.G.A. §8-2-20.) The Design Professional will designate any additional codes or special modifications in the Supplementary General Conditions. As of the year 2000, these codes are published jointly by the Southern Building Code Congress International, the International Code Council, the Building Officials and Code Administrators, International, and the International Conference of Building Officials, and are commonly referred to as the International Building Codes.

  • Building Safety There shall be a Labor/Management Committee concerning the safety of State Buildings. The Committee shall be made up of one representative from each of the following bargaining units: Representing Labor - Administrative Services; Operations, Maintenance and Support Services; Law Enforcement; Professional and Technical Services; Supervisory Services; Institutional Services; and State Police Unit and an equal number of management representatives selected by the Governor. Committee members may participate in the work of the committee during working hours without loss of pay or benefits.

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction of Public Improvements a. Upon satisfaction of the conditions set forth in Paragraph 2.1 and the notice requirement set forth below, Developer shall construct the Public Improvements at its own expense in accordance with this Agreement, the Final Plat, the Resolution, the Civil Engineering Construction Plans, the Town’s ordinances, resolutions and regulations and all other applicable laws and regulations. All Public Improvements shall be installed and constructed within the rights- of-way or easements dedicated to the Town. Unless otherwise approved by the Town in writing, all materials used for constructing the Public Improvements shall be materials set forth on the Town’s approved material list. Workmanship and materials shall be of good quality.

  • Common Area (Check one)

  • Construction Safety Prior to contract award, the successful bidder must provide a Certificate of Recognition or Letter of Good Standing issued by an occupational health and safety organization approved by the Workers’ Compensation Board of Nova Scotia.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • CONSTRUCTION AND IMPROVEMENTS Concessionaire shall not affix, alter, or erect any permanent or temporary equipment, structures, buildings, or additions to the Concession Premises without first obtaining the prior written approval of Department.