Main Building a Xxxxxx X. and Xxxxxxx X. Xxxxx Hospital (ALK) b Xxxxxx X. and Xxxxxxxx X. Hospital (Alkek) Steel Awning at South Entrance c Xxxxxxxx Central (AC) x Xxxxxxxx East (AE) e Xxxxxxxx West (AW) f Annex (Place of Wellness) g Xxxxx Xxxxxxx (BF) h Chapel i Xxxxxxx X. XxXxxxxxx Clinic (CSF) j Clinical Research Building (CRB) (Tan) k Dock Building l George and Xxxxxxx Xxxxxxxx Basic Science Research Building (BSRB) m Xxxxxx n Lutheran Pavilion Hospital (LP) o Xxxxxxxx and Xxx Xxxx Clinic x Xxxxx and Xxxx Xxxxxxx Xxxxx Research Bldg. (BRB, Xxxxx) q X. Xxx Xxxxx Clinic (1978 & 1987) r X. Xxx Xxxxx Clinic Port Cache
Main Building. Quantity Rate BILL No. 8 : METALWORK MODEL PREAMBLES The tenderer is referred to the "Model Preambles for Trades 2008" for supplementary and comprehensive expansion of descriptions, appropriate provision for which shall be deemed to have been included in all relevant rates SUPPLEMENTARY PREAMBLES The Contractor is to check and verify on site that the item specified in the BoQ matches existing prior to placing orders. Additional costs will not be borne by the client for items that do not match existing and are not approved by the Principal Agent METALWORK ALUMINIUM WINDOWS, DOORS, ETC Doors and windows shall comply with AAAMSA design criteria Glazing shall comply with SAGGA regulations. Glass shall be laminated performance glass as shown on the window schedules/drawings appended to these procurement documents. Glass thickness shall comply with SAGGA regulations irrespective of thicknesses shown on the schedules/drawings Doors and windows shall be supplied with protective tape and plastic and shall be removed only once surrounding trades have been completed For purpose made windows and doors, refer to drawings annexed to these procurement documents The following certificates shall be provided prior to commencement of site work:
Main Building a. Reception
Main Building. As such, the design of the main dwelling and outbuildings, suitability for use on the Land, adjustment to the natural topography of the lot, orientation, floor levels, and use of materials and colours are subject to approval by Xxxxxx Trust No 6 and are to be shown on the submitted drawings. Houses are to be designed to reflect contemporary Australian architecture, taking cognisance of the climatic conditions of the area and the estate’s unique location. The Buyer is encouraged to include xxxxx and patios, adding to the articulation of the building and to assist with achieving energy efficiency within the dwelling. Front & Side Elevations - The front elevation and part of the side elevations from the left and right outer edges of the front elevation back to the ‘house to boundary’ fence (approximately 2 metres down the side elevations) shall be either fully rendered to the exposed face or be a combination of render and approved feature materials such as Scyon™ Matrix™ panel, Axon™ panels or similar. Face brink may only be used as a minor feature material, or as infills or courses along the edge of the façade. Full face brick to the front elevation will not be approved (please see materials). The Buyer is encouraged to design their residence such that it allows for street appeal and a rising profile. Roof pitches – All roof planes shall be pitched at a minimum slope of 22.5 degrees except for buildings on lots greater than 300 square metres but less than 450 square metres where a pitch at a minimum slope of 21 degrees is acceptable. Any alternative roof pitch will require a written request submitted to Xxxxxx Trust No 6 for consideration. An alternative roof pitch will be assessed on its architectural merit and respect for the intent of the development. The creative use of skillion roof design is encouraged and acceptable and shall be considered for approval based on its merit and creative design. Xxxxx – Xxxxx must be provided and are to have a minimum of 600mm overhang to all of the building lots over 450m2. For lots under 450m2 xxxxx must have a minimum overhang of 400mm to all of the building. Gables – Large gables fronting the street are discouraged however where they are proposed they should be enhanced with feature treatments such as Scyon™ Matrix™ panel, Axon™ panels, horizontal stained timber or metal powder coated slats, or similar treatments, to enhance the visual appeal of the building from the street. Outbuildings – Garages, carports, sheds, to...
Main Building. House Air" system operates on a standard office building schedule of 7AM to 6PM on weekdays. Any after hours/weekend cooling required by Tenant will be billed to Tenant on an hourly rate of $24.00 for one side of the building and $39.00 for both sides, with a six hour daily minimum. Said rate shall be adjusted by Landlord from time to time to reflect rate and usage changes. To request this extra service Tenant will phone Landlord and then FAX the main office with Tenant's exact requirements no later than 12 noon on a weekday preceding the after hours or weekend of desired usage.
Main Building. An initial rental of £ [in figures] (in words) exclusive of business rates, service charge, insurance rent and VAT.
Main Building i. There is no accessible route to the main building. Provide at least one accessible route within the boundary of the site to this element that, to the maximum extent feasible, coincides with the route for the general public. The accessible route must have a minimum clear width of 36 inches, or a minimum clear width of 42 inches if there is a turn around an obstruction less than 48 inches wide; have passing spaces at least 60 inches by 60 inches at least every 200 feet; have a minimum clear headroom of 80 inches; have a surface that is firm, stable, and slip resistant; have, in the absence of a curb ramp, ramp, elevator, or platform lift, no level changes in excess of 1/2 inch vertically; and have a running slope of less than 1:20 (5%) (or have been constructed as a fully accessible ramp) and a cross slope of less than 1:50 (2%). Standards §§ 4.1.3(1), 4.3, 4.5, Fig. 7.
Main Building. (a) The Client will not permit guests who are attending a Function or Event access to the Main Building at any time unless they have prior written consent from SP.
Main Building. The main building will remain locked and is not part of this Agreement. It is not available for renting.
Main Building. Skirtings to be painted profiled Meranti timber above the floor, to all walls except the bathrooms.