Bypass Dispatch Hall Sample Clauses

Bypass Dispatch Hall. Any Watchman found bypassing the dispatch hall to work a shift or consecutive shift is violating the agreed to Joint Watchmen Dispatch Procedures and Rules. 1st Offense: 7 Days suspension from work 2nd Offense: 30 Days suspension from work 3rd Offense: 6 months’ suspension from work
AutoNDA by SimpleDocs

Related to Bypass Dispatch Hall

  • Dispatching CONTRACTOR shall provide qualified and trained personnel to: • Schedule and assign drivers and vehicles in accordance with the service hour schedules and scheduled trips for each day; • Assist drivers while they are in service to carry out the assigned trips on-time, providing address assistance and telephoning passengers as needed; • Monitor the performance of scheduled trips, reassigning trips and/or adjusting the number of vehicles in service as needed to ensure on-time performance in the most efficient manner; and, • Ensure that unanticipated service demands, passenger and vehicle accidents, other events and general service delivery are handled and performed in accordance with OoA policies and procedures. Dispatching staff are to be on-duty from the time the first SNEMT vehicle is in service until the last SNEMT vehicle is out of service. Dispatch staff will also ensure that: • All voice radio communications that pertain to SNEMT comply with FCC rules and regulations, and that regulations are enforced; • Average hold times on ride check calls are maintained at no more than two (2) minutes; and The OoA “no stranded passengers” policy is enforced.

  • Dispatch and Scheduling 4.3.1 The Power Producer shall be required to schedule its power as per the applicable Regulations / Requirements / Guidelines of CERC / GERC / SLDC / RLDC and maintain compliance to the Grid Code requirements and directions, as specified by SLDC / RLDC from time to time. Any deviation from the schedule will attract the provisions of applicable Regulation / Guidelines / Directions and any financial implication on account of this shall be to the account of the Power Producer.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Dispatch The Power Project shall be required to maintain compliance to the applicable Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • SYSTEM OPERATION The Parties shall adhere to any applicable operational requirements of PJM necessary to protect the integrity of the transmission system within the PJM Control Area and the transmission systems of interconnected control areas, and shall satisfy any and all PJM, RFC and NERC criteria, when applicable. The DS Supplier shall also adhere to any applicable operational requirements of the Company necessary to protect the integrity of the Company’s local distribution system.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

Time is Money Join Law Insider Premium to draft better contracts faster.