Capacity Utilisation Factor (CUF) Sample Clauses

Capacity Utilisation Factor (CUF). 4.5.1 Criteria for generation: The power producer will declare the CUF of their project at the time of PPA and will be allowed to revise the same once within first year of COD. The declared CUF shall in no case be less than 16.21% over a year. They shall maintain generation so as to achieve CUF in the range of ±10 % of their declared value during PPA duration of 25years from the date of COD (for the proposed projects) or after balance Useful life (Balance Useful Life of the Project shall not be less than one year) of the Solar power project (For already commissioned projects). The lower limit will, however, be relaxable by APDCL to the extent of grid non-availability for evacuation which is beyond the control of the developer.
AutoNDA by SimpleDocs

Related to Capacity Utilisation Factor (CUF)

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Service Level Commitment IBM provides the following service level commitment (“SLA”) for the Cloud Service, after IBM makes the Cloud Service available to you.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Night Shift Differential 1. An employee who works an assigned night shift shall, in addition to his or her regular salary, be paid a night shift differential for each hour actually worked on the assigned night shift.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Actual Contract Duration Description / Performance Very poor (1) Poor (2) Fair (3) Good (4) Excellent (5) Quality of office administration Quality of site management Competence of xxxxxxx Co-operation during contract Quality of workmanship Quality of materials Project management Rectification of condemned work Tidiness of site Adequacy of equipment Adequacy of labour force Procurement of materials Labour relations Any other remarks considered necessary to assist in evaluation of the contractor? ………………………………………………………………………………………………………………………………………...

  • Fixed Kilowatt-Hour Rate Product If Clearview Energy would like to propose a change to a fixed kilowatt-hour rate product, you will be notified by the process described in Change of Terms. Fixed price products may change due to new or modified federal, state or local laws; or regulatory actions that impose new or modified fees. 2b. Month-to-month Variable Kilowatt-Hour Rate Product – Month-to-month variable kilowatt-hour rate products are subject to change without notice at Clearview Energy’s discretion outside of any applicable promotion. If applicable, the Monthly Base Charge may also fluctuate outside of any applicable promotion. After the first month, the price may vary based on a number of factors, including market supply prices, energy capacity prices, settlement costs and other market- related factors, as determined at our discretion, plus estimated total state taxes, fees, charges or other assessments, along with our costs, expenses and profit margins. There is no limit on how much the price may change from one billing cycle to the next. The price can change each billing period. The Customer will not know the price until receiving the bill. A customer may obtain the previous 24 months’ average monthly billed price for the customer’s rate class and service territory at 1.800.746.4702 and xxx.xxxxxxxxxxxxxxx.xxx. Historical pricing is not indicative of present or future pricing. All pricing can be viewed at xxx.XxxxxxxxxXxxxxx.xxx.

  • Time Commitment The Advisor shall, and shall cause its Affiliates and their respective employees, officers and agents to, devote to the Company such time as shall be reasonably necessary to conduct the business and affairs of the Company in an appropriate manner consistent with the terms of this Agreement. The Company acknowledges that the Advisor and its Affiliates and their respective employees, officers and agents may also engage in activities unrelated to the Company and may provide services to Persons other than the Company or any of its Affiliates.

  • Part-Time Commitment The Hospital shall not refuse to accept an offer from an employee to make a written commitment to be available for work on a regular predetermined basis solely for the purpose of utilizing casual employees so as to restrict the numbers of regular part-time employees.

  • C1 Contract Price C1.1 In consideration of the Contractor’s performance of its obligations under the Contract, the Authority shall pay the Contract Price in accordance with clause C2 (Payment and VAT).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!