CARTING AWAY Sample Clauses

CARTING AWAY. 5 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 1
AutoNDA by SimpleDocs
CARTING AWAY. 3 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 1 KEEPING EXCAVATIONS FREE OF WATER Keeping excavations free of water: 4 Keeping excavations entirely free of all water or mud. Item CONCRETE, FORMWORK AND REINFORCEMENT REINFORCED CONCRETE 25 MPa/19mm Concrete: 5 Base slabs, etc m3 0.1 Carried to Collection R Item Quantity Rate Amount
CARTING AWAY. 3 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 5 EARTH FILLING, ETC. Filling with material from the excavations compacted to a density of at least 95% Mod. AASHTO maximum density: 4 Backfilling to trenches, holes, etc. m3 2 Filling with approved natural gravel material (G5) supplied and carted onto site by the Contractor and compacted to 95% Mod AASHTO density: 5 Under trenches, holes, surface beds, etc. m3 4 Carried to Collection R Amount Item No CONCRETE, FORMWORK AND REINFORCEMENT Quantity Rate
CARTING AWAY. 5 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 1 KEEPING EXCAVATIONS FREE OF WATER Keeping excavations free of water: 6 Keeping excavations entirely free of all water or mud. Item Carried to Collection R Amount Item No CONCRETE, FORMWORK AND REINFORCEMENT Quantity Rate
CARTING AWAY. 8 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 29 Carried to Collection R Amount Item No EARTH FILLING, ETC. Quantity Rate Filling with material from the excavations compacted to a density of at least 95% Mod. AASHTO maximum density: 9 Backfilling to trenches, holes, etc. m3 293 Filling with approved 5% stabilised G6 backfill soilcrete supplied and carted onto site by the Contractor and compacted to 95% Mod AASHTO density: 10 Under trenches, holes, surface beds, etc. m3 24
CARTING AWAY. 4 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 2 EARTH FILLING, ETC. Filling with approved natural gravel material (G5) supplied and carted onto site by the Contractor and compacted to 95% Mod AASHTO density: 5 Under trenches, holes, surface beds, etc. m3 1 Carried to Collection R Amount Item No Compaction of surfaces. Quantity Rate Amount 6 Compaction of ground surface including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material from excavated material where necessary and compacting to 87% Mod AASHTO density. m2 8 Prescribed density tests on filling 7 Modified AASHTO Density test. No 3 CONCRETE, FORMWORK AND REINFORCEMENT REINFORCED CONCRETE 25Mpa/19mm Concrete 8 1000mm V' shaped concrete slab. m3 1 9 In 110mm PVC Blue Water Pipe. m3 1 SMOOTH FORMWORK (DEGREE OF ACCURACY II) Smooth Formwork to Sides: 10 Edges, risers, ends and reveals not exceeding 300mm high or wide. m 18 REINFORCEMENT (PROVISIONAL) Fabric reinforcement: 11 Type 193 fabric reinforcement in concrete surface beds, slabs, etc m2 8 Carried to Collection R Item No DAMPPROOFING OF WALLS AND FLOORS Quantity Rate Amount One layer of 350 micron 'USB GREEN' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape': 12 Under surface beds. m2 8 PIPEWORK Pipes, pipe fittings, etc WATER SUPPLIES Galvanised steel pipe. 13 20mm Diameter galvanised pipes fixed to concrete. m 3 Extra over for pipe fittings. 14 Bend No 3 uPVC Pipes 15 110mm Blue Water Pipe. m 3 SANITARY FITTINGS Solid cast brass taps, valves, etc
CARTING AWAY. 4 Extra over all excavations for carting away surplus excavated material and spreading, levelling and lightly compacting on site where directed not exceeding 100m from the excavations.(measured nett - no allowance made for bulking) m3 2 EARTH FILLING, ETC. Filling with approved natural gravel material (G5) supplied and carted onto site by the Contractor and compacted to 95% Mod AASHTO density: 5 Under trenches, holes, surface beds, etc. m3 1 Carried to Collection R Amount Item Quantity Rate Amount No Compaction of surfaces. 6 Compaction of ground surface including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material from excavated material where necessary and compacting to 87% Mod AASHTO density. m2 5 Prescribed density tests on filling 7 Modified AASHTO Density test. No 2 CONCRETE, FORMWORK AND REINFORCEMENT REINFORCED CONCRETE 25Mpa/19mm Concrete 8 1000mm V' shaped concrete slab. m3 1 9 In 110mm PVC Blue Water Pipe. m3 1 SMOOTH FORMWORK (DEGREE OF ACCURACY II) Smooth Formwork to Sides:
AutoNDA by SimpleDocs

Related to CARTING AWAY

  • International Olympic Committee; International Red Cross and Red Crescent Movement As instructed from time to time by ICANN, the names (including their IDN variants, where applicable) relating to the International Olympic Committee, International Red Cross and Red Crescent Movement listed at xxxx://xxx.xxxxx.xxx/en/resources/registries/reserved shall be withheld from registration or allocated to Registry Operator at the second level within the TLD. Additional International Olympic Committee, International Red Cross and Red Crescent Movement names (including their IDN variants) may be added to the list upon ten (10) calendar days notice from ICANN to Registry Operator. Such names may not be activated in the DNS, and may not be released for registration to any person or entity other than Registry Operator. Upon conclusion of Registry Operator’s designation as operator of the registry for the TLD, all such names withheld from registration or allocated to Registry Operator shall be transferred as specified by ICANN. Registry Operator may self-­‐allocate and renew such names without use of an ICANN accredited registrar, which will not be considered Transactions for purposes of Section 6.1 of the Agreement.