CGS Operational Manual Sample Clauses

CGS Operational Manual. The Borrower shall cause MAFRD to adopt, within three (3) months from the date of effectiveness of the Loan Agreement, a manual satisfactory to the Bank (the CGS Operational Manual) for the operation of the Competitive Grant Scheme, and thereafter to maintain such manual at least until the completion of the Project, and not revoke, abrogate or substantially amend the CGS Operational Manual without the Bank’s prior approval.
AutoNDA by SimpleDocs

Related to CGS Operational Manual

  • Operational Manual (a) The Multiplex Licensee agrees to develop an operational manual in consultation with all Access Seekers to deal with technical and operational matters that arise under or in connection with this Agreement, or the supply of the Multiplex Transmission Service (Operational Manual).

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Financial Management Standards The financial management systems of Grantee must meet the following standards:

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Financial Management System Subrecipient shall establish and maintain a sound financial management system, based upon generally accepted accounting principles. Contractor’s system shall provide fiscal control and accounting procedures that will include the following:

  • PRODUCTION STANDARDS The Company may establish minimum production standards applicable to Representative.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Business Plan The Lenders shall have received a satisfactory detailed business plan of the Borrowers for fiscal years 1996 - 2002 and a satisfactory written analysis of the business and prospects of the Borrowers for the period from the Closing Date through the final maturity of the Term Loans.

  • WORKLOAD STANDARDS One (1) Direct Service Hour (DSH) will be equal to sixty (60) minutes of direct services.