Charges for Interconnection And Net Metering Sample Clauses

Charges for Interconnection And Net Metering. The Customer Generator shall be responsible for all costs of installing, operating and maintaining protective equipment and/or electrical facilities required to interconnect with the Cooperative’s distribution system. The Customer Generator shall be charged for the direct cost incurred by the Cooperative as a result of the interconnection and for providing net metering service. Said charges will be determined in accordance with the Cooperative’s Net Metering Service, Rider NM-1. Distributed Generation Policy Appendix A APPLICATION FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITY Application for Interconnection of Distributed Generation Facility This application should be completed and returned to the Cooperative Customer Service representative at least forty-five (45) days prior to the customer’s proposed interconnection date in order to begin processing the request. Customers must not operate their distributed generation facilities in parallel with Diverse Power’s distribution system until they have received written authorization for parallel operation from Diverse Power. Unauthorized parallel operation of customer’s distributed generation facilities could result in injury to persons and/or damage to equipment or property. ***************************************************************************************************
AutoNDA by SimpleDocs
Charges for Interconnection And Net Metering. The Customer Generator shall be responsible for all costs of installing, operating and maintaining protective equipment and/or electrical facilities required to interconnect with the Cooperative’s distribution system. The Customer Generator shall be charged for the direct cost incurred by the Cooperative as a result of the interconnection and for providing net metering service. Said charges will be determined in accordance with the Cooperative’s Net Metering Service, Rider NM-1. Central Georgia Electric Membership Corporation Distributed Generation Policy Appendix A APPLICATION FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITY Central Georgia Electric Membership Corporation Application for Interconnection of Distributed Generation Facility This application should be completed and returned to the Cooperative Customer Service representative at least forty-five (45) days prior to the customer’s proposed interconnection date in order to begin processing the request. Customers must not operate their distributed generation facilities in parallel with Central Georgia EMC’s distribution system until they have received written authorization for parallel operation from Central Georgia EMC. Unauthorized parallel operation of customer’s distributed generation facilities could result in injury to persons and/or damage to equipment or property. ***************************************************************************************************

Related to Charges for Interconnection And Net Metering

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection.

  • By Interconnection Customer Interconnection Customer may unilaterally terminate the Interconnection Service Agreement pursuant to Applicable Laws and Regulations upon providing Transmission Provider and the Interconnected Transmission Owner sixty (60) days prior written notice thereof, provided that Interconnection Customer is not then in Default under the Interconnection Service Agreement.

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • DISCONNECTION OF SUPPLY 14.1 When can we arrange for disconnection? Subject to us satisfying the requirements in the Rules, we may arrange for the disconnection of your premises if:

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.