Climate Change/Resiliency Sample Clauses

Climate Change/Resiliency. Since the Project Site is located adjacent to the Fort Point Channel, the Applicant will use design strategies for the Project that anticipate the effects of climate change, including sea-level rise. The elevations of the first floors of the Proposed Project will be set to at least +19.5, which would provide protection against a 500-year storm event in 2075, critical mechanical and life safety/standby emergency building systems will be placed above vulnerable elevations, and the stormwater infrastructure will be designed to manage inland flooding through the use of adaptive landscaping that will be resilient against flooding and saltwater intrusion.
AutoNDA by SimpleDocs

Related to Climate Change/Resiliency

  • Climate Change 1. The Parties recognize that the climate change and its adverse effects are a common concern. In that sense, and under their international commitments, the Parties agree to promote joint measures to limit or reduce the adverse effects of the climate change. 2. For promoting sustainable development, each Party, within its own capacities, shall adopt policies and measures on issues such as: (a) improvement of energy efficiency; (b) research, promotion, development and use of new and renewable energy, technologies of carbon dioxide capture, and updated and innovative environmental technologies that do not affect food security or the conservation of biological diversity; and (c) measures for evaluating the vulnerability and adaptation to climate change.

  • Climate Control a. The air conditioning/heating units shall be functional at all times. b. The air discharged from the air conditioner interior vent system shall be continuously cool. c. All air conditioning temperature controls and functions shall operate as originally designed and manufactured with no knobs or components broken or missing. d. Systems shall operate on all OEM speeds with no excessive noise.

  • Rate Changes Pricing is fixed for the base term of the Agreement. Thereafter, Firm may request an increase to hourly rates to account for changes in the market prices for legal services. Any increase is subject to Citizens’ approval at Citizens’ sole discretion, and must be evidenced by a formal amendment to this Agreement. Price adjustments shall not be applied retroactively. Alternative fee arrangements must be pre-approved by Citizens in writing.

  • Corporate Changes Neither Borrower nor any Subsidiary shall change its corporate name, legal form or jurisdiction of formation without twenty (20) days’ prior written notice to Agent. Neither Borrower nor any Subsidiary shall suffer a Change in Control. Neither Borrower nor any Subsidiary shall relocate its chief executive office or its principal place of business unless: (i) it has provided prior written notice to Agent; and (ii) such relocation shall be within the continental United States. Neither Borrower nor any Subsidiary shall relocate any item of Collateral (other than (x) sales of Inventory in the ordinary course of business, (y) relocations of Equipment having an aggregate value of up to $150,000 in any fiscal year, and (z) relocations of Collateral from a location described on Exhibit C to another location described on Exhibit C) unless (i) it has provided prompt written notice to Agent, (ii) such relocation is within the continental United States and, (iii) if such relocation is to a third party bailee, it has delivered a bailee agreement in form and substance reasonably acceptable to Agent.

  • Major Workplace Change 11.1 If the Employer has made a decision to introduce a major workplace change that is likely to have a Significant Effect on a number of Employees, the Employer must notify the Employee(s) who will be affected by the decision .As soon as practicable and prior to implementation, the Employer must discuss with the relevant Employees and/or their nominated representative/s (e.g. Union or other representative) the introduction of the change; and the effect the change is likely to have on the Employees. The Employer must discuss measures to avert or mitigate the adverse effect of the change on the Employees. 11.2 For the purposes of the discussion the Employer will provide the relevant Employees and/or their nominated representative/s in writing: (a) All relevant information about the change including the nature of the change proposed; (b) Information about the expected effects of the change on the Employees; and (c) Any other matters likely to affect the Employees. However, the Employer is not required to disclose confidential or commercially sensitive information. The Employer must give prompt and genuine consideration to matters raised about the major change by the relevant Employees.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Emergency Situation In the event of an emergency situation beyond our reasonable control, such as an "act of God," war, fire, or natural disaster, services involving your account could be available only in a modified or reduced form or could be entirely unavailable. Unless expressly prohibited by applicable law, you agree that we will have no liability to you for such modification, reduction, or unavailability of services caused by an emergency situation.

  • Price Changes Our storage charges will be as quoted to You for the first 26 weeks of storage. After 26 weeks, We may change the storage charges from time to time on giving 28 days’ written notice to You.

  • Erosion Prevention and Control Purchaser’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. Purchaser shall adjust the kinds and intensity of erosion control work done to ground and weather condi- tions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding ex- pected seasonal periods of precipitation or runoff.

  • Emergency Situations If the condition is an emergency, this will be communicated to the Contractor with the request that corrections are to be accomplished immediately. The Contractor shall respond to the notice in emergency situations within twenty-four hours. If the Contractor fails to respond within this time limit, the Owner may correct the defect and charge the Contractor for the Work. If it is determined the complaint is not the responsibility of the Contractor, the Contractor shall be promptly paid for the cost of the corrective work. The Contractor shall give notice in writing to the Owner when corrections have been completed.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!