Cold Ironing Sample Clauses

Cold Ironing. According to D1.1, the shore-based substation is typically designed to deliver a ship with a three- phase 6, 600V and 50/60Hz power supply, which can be converted on-board to the necessary requirements of the auxiliary systems running at that time. Figure 19 shows an example of a single line diagram of a typical cold ironing system. A 6.6 kV (PWM 3-level) converter provides the interface between the main network and the shore supply.
AutoNDA by SimpleDocs

Related to Cold Ironing

  • Contract Monitoring The criminal background checks required by this rule shall be national in scope, and must be conducted at least once every three (3) years. Contractor shall make the criminal background checks required by Paragraph IV.G.1 available for inspection and copying by DRS personnel upon request of DRS.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • Fabrication Making up data or results and recording or reporting them.

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!