Examples of Phase 6 in a sentence
As expected, compared to the second quarter of 2020, total gold production was lower by 12% (29,981 ounces) due to planned significant waste stripping campaigns at both the Fekola and Otjikoto mines, which were largely completed in the first half of 2021 (for Phase 5 and Phase 6 of the Fekola Pit, and Phase 3 of the Wolfshag and Otjikoto pits).
Sal de Vida Lithium Brine ProjectSEC Technical Report SummaryTable 7-6 – Summary of Geophysical Surveys Conducted During Phase 6 of the Drilling Program.
These were broken out into Phase 1 to 6, with Phase 1 commencing in 2009, and Phase 6 in late 2020 as part of the East Wellfield development.
Fekola’s gold production is budgeted to be higher in 2022 (compared to 567,795 ounces produced in 2021) due to the optimization of the mining sequence to provide earlier access to high-grade ore from Phase 6 of the Fekola Pit as well as the ramping up of mining operations at the Cardinal zone (fully permitted and located within 500 metres of the current Fekola resource pit) primarily in the second half of 2022.
With Phase 5 of the Fekola Pit completed in December 2021, ore in 2022 is scheduled to be sourced from Phase 6 of the Fekola Pit and the Cardinal zone together with existing stockpiles.
General summary of downhole geophysical survey conducted during initial phases of drilling program is shown in Table 7-5, more detail downhole geophysical survey including BMR survey conducted in Phase 6 of this last drilling campaign is shown in Table 7-6.
The recent drilling program of Phase 6 wells confirms the conceptualized geological setting and location of brine-bearing salar sediments.
As expected, compared to the first quarter of 2020, total consolidated gold production was lower by 17% (44,218 ounces), due to planned significant waste stripping campaigns at both the Fekola and Otjikoto mines, scheduled for the first half of 2021 (for Phase 5 and Phase 6 of the Fekola Pit, and Phase 3 of each of the Wolfshag and Otjikoto pits).
A freshwater well was constructed by Cono Sur Drilling Co. during Phase 6.
The Phase 6 surcharge became effective on January 1, 2010 and is in addition to existing base rates and the Phase 5 surcharges.