COMPACTION OF BACKFILL. The backfilling of any trench within the paved portion of the highway, the shoulders thereof, or the portion under or intersecting street or highway shall be thoroughly compacted. Method of compaction shall be subject to review by the METRO or METRO’s agent. The GRANTEE shall be liable for any damage which may result to the pavement due to failure to properly compact the backfill.
AutoNDA by SimpleDocs
COMPACTION OF BACKFILL. When compacting the soil against steep rock abutment walls of masonry or concrete structures, the construction surface of embankment shall be sloped away from the rock or masonry or concrete structure leaving a minimum distance of 0.6 metre and at an inclination of 3:1. Rollers shall not be used close to structures as structural damage is very likely more particularly when structures have not been fully, cured. The size and weight of equipment will depend on nature of material, the height and load assumed in design of structure. The backfill close to the structure up to the rolled layer shall be compacted in suitable uniform layers using pneumatic / hand tampers at appropriate for dry density of at least 90% of Standard Xxxxxxx Density. The moisture content of the earth fill placed against the rock or the structure shall be on higher side of OMC by about 2% or so, to allow it to be compacted into all irregularities of the rock. Profused watering shall be done to pervious materials, (sand) before compaction as per instruction of the Engineer-in-Charge. Compaction at junction of earthwork and backfill around the structure shall be carried out with special care without claiming any extra cost. Measurement and Payment
COMPACTION OF BACKFILL. The backfilling of any trench within the paved portion of the street, the shoulders thereof, within park strips, under sidewalk or curb and gutter, or the portion under or intersecting the street, shall be thoroughly compacted in accordance with all applicable standards and regulations, including City’s construction standards. The method of compaction shall be subject to review by City at the time the permit application is reviewed. UTOPIA shall require its contractors to comply with City’s construction standards and permit requirements.

Related to COMPACTION OF BACKFILL

  • Compaction 11.1 Concrete shall be thoroughly compacted and fully worked around the reinforcement, around embedded fixtures and into corners of the formwork. 11.2 Concrete shall be compacted using mechanical vibrators complying with IS 2505, IS 2506, IS 2514 and IS:4656. Over vibration and under vibration of concrete are harm full and shall be avoided. Vibration of very wet mixes shall also be avoided. Whenever vibration has to be applied externally, the design of formwork and the disposition of vibrators shall receive special consideration to ensure efficient compaction and to avoid surface blemishes.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Cost Containment The Benefit Fund Trustees are directed to explore all reasonable methods of cost containment to minimize the Employer contribution obligations under the contract. In the event Medicare becomes secondary in the application of the retiree benefit plan, the Trustees will take immediate and remedial action to protect the financial integrity of the Plan.

  • Responsibility for Environmental Contamination 5.20.1 Neither Party shall be liable to the other for any costs whatsoever resulting from the presence or release of any Environmental Hazard that either Party did not introduce to the affected Work Location. Both Parties shall defend and hold harmless the other, its officers, directors and employees from and against any losses, damages, claims, demands, suits, liabilities, fines, penalties and expenses (including reasonable attorneys' fees) that arise out of or result from (i) any Environmental Hazard that the Indemnifying Party, its contractors or agents introduce to the Work Locations or (ii) the presence or release of any Environmental Hazard for which the Indemnifying Party is responsible under Applicable Law. 5.20.2 In the event any suspect materials within Qwest-owned, operated or leased facilities are identified to be asbestos containing, CLEC will ensure that to the extent any activities which it undertakes in the facility disturb such suspect materials, such CLEC activities will be in accordance with applicable local, state and federal environmental and health and safety statutes and regulations. Except for abatement activities undertaken by CLEC or equipment placement activities that result in the generation of asbestos-containing material, CLEC does not have any responsibility for managing, nor is it the owner of, nor does it have any liability for, or in connection with, any asbestos-containing material. Qwest agrees to immediately notify CLEC if Qwest undertakes any asbestos control or asbestos abatement activities that potentially could affect CLEC personnel, equipment or operations, including, but not limited to, contamination of equipment.

  • Records Maintenance; Access Contractor shall maintain all financial records relating to this Contract in accordance with generally accepted accounting principles. In addition, Contractor shall maintain any other records, books, documents, papers, plans, records of shipments and payments and writings of Contractor, whether in paper, electronic or other form, that are pertinent to this Contract (“Records”) in such a manner as to clearly document Contractor's performance. Contractor acknowledges and agrees that Agency and the Oregon Secretary of State's Office and the federal government and their duly authorized representatives will have access to such financial records and other Records that are pertinent to this Contract, whether in paper, electronic or other form, to perform examinations and audits and make excerpts and transcripts. Contractor shall retain and keep accessible all such financial records and other Records for a minimum of 6 years, or such longer period as may be required by applicable law, following final payment and termination of this Contract, or until the conclusion of any audit, controversy or litigation arising out of or related to this Contract, whichever date is later.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • Safety Glasses Section 1. The City shall supply prescription safety glasses with plastic lenses to employees who are required to wear safety glasses and who are members of the classifications contained in Appendix C to this contract. Safety glasses which are authorized must be industrial grade safety glasses which meet or exceed the requirements of ANSI Specification Z87. 1. All employees who are required to wear safety glasses shall also be required to wear side xxxxxxx, either permanent or snap-on, whenever an eye hazard exists. Solid tinted glasses will not be approved unless required by prescription. Photogray, progressive, scratch coating and/or anti-glare lenses may be considered for those employees who primarily work outdoors or as prescribed. In the event that additional classes are identified as needing either prescription safety glasses or protective eyewear, such classes may be added to the classification list in Appendix C upon approval of PAGE and the City. Section 2. The City agrees to pay the full cost of required prescription safety glasses, with frames not to exceed $75.00. This excludes the cost of the eye examination which will be the responsibility of the employee. The effected employees will be allowed one (1) replacement of safety glasses every two (2) years. In the event the safety glasses become lost, unserviceable, or broken on the job, the employee must present a written request for replacement to the Department Head and Human Resources Director. If the employee breaks his safety glasses while on the job, the Department shall replace the glasses at no cost to the employee. The replacement of lost glasses or glasses that are broken off the job will be at the discretion of the Department Head and Human Resources Director. If an employee has been provided safety glasses by the City, the employee shall be permitted to retain possession of the glasses after separation from the City without reimbursing the City for any costs associated with the glasses. Section 3. An employee who is required to wear prescription safety glasses must present a written request to his department head or designated representative. Section 4. The employee must obtain a current prescription and the employee is authorized the use of sick leave not to exceed two (2) hours to accomplish this examination. The employee will obtain a purchase order from the Department Head prior to ordering the safety glasses. The employee will present the purchase order to the appropriate vendor when ordering. The vendor will contact the appropriate Department Head when the glasses are ready for delivery. The Department Head will then notify the employee who will present himself at the vendor for fitting and pickup. Section 5. In the event a probationary employee has been issued safety glasses and terminates his employment with the City for any reason during the probationary period, he shall be required to reimburse the City for any expenses incurred in the purchase of safety glasses.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.