Concrete formwork Sample Clauses

Concrete formwork. 1 : General 1.1
AutoNDA by SimpleDocs
Concrete formwork. AND REINFORCEMENT For preambles see "Model Preambles for Trades" SUPPLEMENTARY PREAMBLES Cost of tests The costs of making, storing and testing of concrete test cubes as required under clause 7 "Tests" of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the architect. The testing shall be undertaken by an independent firm or institution nominated by the contractor and to the approval of the architect. (Test cubes are measured separately) Formwork Descriptions of formwork shall be deemed to include use and waste only (except where described as "left in" or "permanent"), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use. The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself. Formwork to soffits of (solid) slabs etc shall be deemed to be to slabs not exceeding 250mm thick unless otherwise described Formwork to sides of bases, pile caps, ground beams, etc will only be measured where it is prescribed by the engineer fordesign reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in "Earthworks" Carried to Collection R Section No. 2 BUILDINGS Bill No. 2 CONCRETE, FORMWORK AND REINFORCEMENT UNREINFORCED CONCRETE 15Mpa/19mm concrete 1 Blinding under footings and bases m3 12 10Mpa/19mm concrete 2 Aprons m3 3 REINFORCED CONCRETE 30MPa/19mm concrete 3 Stub columns m3 1 4 Columns m3 4 5 Surface beds cast in panels on water proofing m3 74 6 Thickening under surface beds m3 4 25MPa/19mm concrete 7 Strip footings m3 58 8 Bases m3 17 9 Stub columns m3 1 10 Columns m3 3 11 Beams m3 22 12 Slabs m3 21 Carried to Collection R Page 50 Section No. 2 BUILDINGS Bill No. 2 CONCRETE, FORMWORK AND REINFORCEMENT TEST CUBES 13 Making and testing 150 x 150 x 150mm concrete strength test cubes (Provisional) No 31 CONCRETE SUNDRIES Finishing top surfaces of concrete smooth with a power float to a smooth surface 14 Surface beds, slabs, etc m2 730 15 Ramps to falls to a...

Related to Concrete formwork

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Improvement Plans a. An improvement plan is a clearly articulated assistance program for a teacher/counselor/SLP whose overall summative rating is ineffective.

  • Professional Growth and Improvement Plans A. Professional growth and improvement plans shall be developed as follows:

  • Improvement Plan A written plan developed by the evaluator, utilized when a teacher received a Rating of Ineffective on his/her Evaluation or on any individual deficiency in the evaluation system.

  • Construction Plans Tenant shall prepare final plans and specifications for the Tenant Improvements that (a) are consistent with and are logical evolutions of the Approved Schematic Plans and (b) incorporate any other Tenant-requested (and Landlord-approved) Changes (as defined below). As soon as such final plans and specifications ("Construction Plans") are completed, Tenant shall deliver the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld, conditioned or delayed. All such Construction Plans shall be submitted by Tenant to Landlord in electronic .pdf, CADD and full-size hard copy formats, and shall be approved or disapproved by Landlord within ten (10) business days after delivery to Landlord. Landlord's failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If the Construction Plans are disapproved by Landlord, then Landlord shall notify Tenant in writing of its objections to such Construction Plans, and the parties shall confer and negotiate in good faith to reach agreement on the Construction Plans. Promptly after the Construction Plans are approved by Landlord and Tenant, two (2) copies of such Construction Plans shall be initialed and dated by Landlord and Tenant, and Tenant shall promptly submit such Construction Plans to all appropriate Governmental Authorities for approval. The Construction Plans so approved, and all change orders approved (to the extent required) by Landlord, are referred to herein as the "Approved Plans."

  • Educator Plans: Improvement Plan A) An Improvement Plan is for those Educators with PTS whose overall rating is unsatisfactory.

  • FABRICATION Making up data or results and recording or reporting them.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

Time is Money Join Law Insider Premium to draft better contracts faster.