CONSISTENCY AND SLUMP Sample Clauses

CONSISTENCY AND SLUMP. The concrete shall have a consistency such that it will be workable in the required position. It shall be of such consistency that when properly vibrated it will flow around reinforcing steel and all embedded parts. The slump for concrete as determined by slump tests as per Indian Standard 456 (latest edition) shall not exceed the maximum slumps indicated below for each type of construction as approved by the Engineer- in-charge. Workability Slum in MM Type of Construction Min. Max.
CONSISTENCY AND SLUMP. (i) Concrete shall be of a consistency and workability suitable for the conditions of the job. After the amount of water required is determined, the consistency of the mix shall be maintained throughout the progress of the corresponding parts of the work and approved tests e.g. slump tests, compacting factor tests, in accordance with IS.1199, shall be conducted from time to time to ensure the maintenance of such consistency. (ii) The following tabulation gives a range of slumps which shall generally be used for various types of construction unless otherwise instructed by the Engineer: SLUMPS FOR VARIOUS TYPES OF CONSTRUCTION Placing Conditions O of Workability Slump (mm) (1) (2) (3) Blinging concrete; Shallow sections; Pavements using pavers Very low In the ‘very low’ category of workability where strict control is necessary, for example pavement quality concrete, measurement of workability by determination of compacting factor will be more appropriate than slump (see IS 1199) and a value of compacting factor of 0.75 to 0.80 suggested. Mass concrete; Lightly reinforced sections in slabs, beams, walls, columns; Floors; Hand placed pavements; Canal lining; Strip footings Low 25 – 75 Heavily reinforced sections in slabs, beams, walls, Slipform work; Pumped concrete Medium 50 – 100 Trecnch fill; High 100 – 150 In-situ piling Tremie concrete Very high In the ‘very high’ category of workability, measurement of workability by determination of flow will be appropriate

Related to CONSISTENCY AND SLUMP

  • Construction Phase - Administration of the Construction Contract INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.9.1. The Construction Phase will commence with the award of the Construction Contract to a selected vendor (“Contractor”) and will terminate when final payment is made by the State to the Contractor. In any event, the construction phase will not extend 60 days beyond the substantial completion date unless extended by change order. If such extension occurs, additional costs due to the ARCHITECT/ENGINEER shall be negotiated with the State. 1.1.9.2. The ARCHITECT/ENGINEER shall work with the State during the construction of the Project to provide the administration of the contract between the State and the Contractor in accordance with the terms herein and consistent with the contract between the State and the Contractor, and the extent of his/her duties and responsibilities and the limitations of his/her authority as assigned therein shall not be modified without his/her written consent. 1.1.9.3. The ARCHITECT/ENGINEER shall advise and consult with the State, and all of the State's instructions to the Contractor shall be issued through the ARCHITECT/ENGINEER after authorization by the State. 1.1.9.4. The ARCHITECT/ENGINEER shall, at all times, have access to the work wherever it is in preparation or progress. 1.1.9.5. The ARCHITECT/ENGINEER shall make periodic visits to the Project site, at least biweekly, and shall make such further visits when reasonably requested by the State, as to familiarize himself/herself with the progress and quality of the work performed and as to determine, on the basis of such visits, if such progress and quality are in accordance with the Contract Documents. The ARCHITECT/ENGINEER shall be responsible for project meeting minutes. In addition to this, the ARCHITECT/ENGINEER shall periodically report his/her findings thereon to the State, at such times as in the exercise of his/her professional judgment such findings are appropriate and at least monthly, at the conference provided for in Section 1.1.9.6, and further at such times as the State may reasonably request. The ARCHITECT/ENGINEER shall not be required to make exhaustive or continuous on-site inspections, except as required in the exercise of his/her professional judgment for said reports and, except in particular, to fulfill the commissioning requirements. The ARCHITECT/ENGINEER shall not be responsible for construction means, methods, techniques, sequences or procedures or for safety precautions and programs in connection with the work, and he/she shall not be responsible for the Contractor's failure to carry out the work in accordance with the Contract Documents except as provided for herein specifically between the State and the ARCHITECT/ENGINEER. 1.1.9.6. In preparing the bid documents, to the extent that the ARCHITECT/ENGINEER utilizes sub- consultants for their expertise, such as, but not limited to: Landscape Architects, Civil, Structural, Mechanical, and Electrical Engineers, these consultants, in effect, become an extension of the ARCHITECT/ENGINEER. Where the term ARCHITECT/ENGINEER is used in Section 1.1.9.2 as well as 1.1.9.5, it shall include those sub-consultants when work is being performed in their area of expertise. For example, the Mechanical Engineer would inspect the under slab plumbing before it is backfilled, but then wouldn’t necessarily be needed on site until the rest of the mechanical systems are being installed. The sub-consultant shall also be required to periodically inspect the progress of the “As-builts” and verify that they are up-to-date and verify such to the ARCHITECT/ENGINEER, before the ARCHITECT/ENGINEER issues the certificate of payment for that pay period. 1.1.9.7. Based upon his/her determinations and reports made under Section 1.1.9.5 of this Agreement and upon the Contractor's applications for payment, the ARCHITECT/ENGINEER shall once every month, after an on-site conference between the State, the Contractor and the ARCHITECT/ENGINEER, determine the amount then owing to the Contractor and shall then issue a certificate of payment for the amount agreed upon. The issuance of a Certificate for Payment shall constitute a representation by the ARCHITECT/ENGINEER to the State, based on such ARCHITECT/ENGINEER'S determination and report and the data supplied to him/her by the Contractor (without affecting his/her duties defined in Section 1.1.9.5.), that the work has progressed to the point indicated; that the quality of the work is in accordance with the Contract Documents (subject to the results of any specified subsequent tests required by the Contract Documents, to immaterial and insubstantial deviations from the Contract Documents, which will be corrected prior to completion, and to any further specific qualifications stated in the Certificate for Payment); and that the Contractor is entitled to such payment in the amount certified. Provided, however, the issuance of such certificate will not affect any obligations of the Contractor to the State. By issuing a certificate for payment, the ARCHITECT/ENGINEER shall not be deemed to represent that he/she has made any examination to ascertain how and for what purpose the Contractor has used the monies paid on account of the contract sum. ARCHITECT/ENGINEER shall not accept any part of the work on behalf of the State; ARCHITECT/ENGINEER may only recommend acceptance. Final acceptance is a right reserved solely to the State. 1.1.9.8. The ARCHITECT/ENGINEER shall be, in the first instance, the interpreter of the requirements of all Construction Documents, and shall have all requisite authority relating thereto for the purposes of authorizing the Contractor to proceed or stop with any component of the project after consultation and agreement with the State. The ARCHITECT/ENGINEER shall not be liable to the State for any loss or cost incurred by the State arising from delays in the construction schedule caused by any decision made by the ARCHITECT/ENGINEER in the reasonable exercise of professional judgment either to exercise or not to exercise his/her authority to stop the Work. 1.1.9.9. The ARCHITECT/ENGINEER shall review and respond to shop drawings, samples, and other submissions of the Contractor as in conformance with the design concept and information in the Contract Documents and the designs and plans relating to the project until approved or not requiring re-submission. The ARCHITECT/ENGINEER shall also review the submittal log at construction meetings and report to the State, on a monthly basis, their findings thereon. 1.1.9.10. The ARCHITECT/ENGINEER shall prepare all change orders and supporting data for the State's approval. 1.1.9.11. The ARCHITECT/ENGINEER shall conduct inspections to determine the Dates of Substantial Completion and Final Completion and shall receive written guarantees and related documents assembled by the Contractors and shall issue a final certificate of payment in accordance with Section 1.1.9.6. 1.1.9.12. The ARCHITECT/ENGINEER shall be responsible for system commissioning in accordance with the BGS Design Guidelines and as indicated in the BGS Commissioning Guidelines. Please see the BGS website xxxx://xxx.xxxxxxx.xxx/facilities/forms . The ARCHITECT/ENGINEER shall inspect, and document, each and every system to ensure that it complies with design intent, including but not limited to: system installation, system operation, and seasonal changeover. 1.1.9.13. Except in the manner specifically provided for herein, the ARCHITECT/ENGINEER shall not be responsible to the State for the acts or omissions of the Contractor or any of the Contractor’s agents or employees, or any other person not an employee or agent of the ARCHITECT/ENGINEER performing work on the Project. The ARCHITECT/ENGINEER shall be responsible for and shall pay the amount of any increase in the total Contract Price or the total Change Order(s) Price, which increase results from an error, inconsistency, or omission in the Contract Documents or instructions. 1.1.9.14. ARCHITECT/ENGINEER shall furnish to the State, a complete set of marked-up drawings and specifications showing all the changes to the Construction Documents made by Addenda, Change Orders, Shop Drawings, RFIs and other information received from the Clerk; and General Contractor’s As-built markups. The changes to the drawings are to be created on a separate layer in the DWG set and highlighted in a box, cloud or the like in the PDF set. The specifications are also to differentiate the changes made by highlighting in a box, cloud, etc. and be provided in Microsoft Word. These drawings and specifications shall be supplied within three (3) months of the date of Substantial Completion and before final payment. 1.1.9.15. Architect/Engineer (and design team members as required) shall conduct a one-year warranty inspection of the completed construction project between the eleventh and twelfth month from the date of substantial completion and shall issue a list of defective items needing correction to the Contractor.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • General Overview 2.1.1 If NEW PHONE requires maintenance for its local service customers, NEW PHONE will initiate a request for repair (sometimes referred to as a "trouble report") by calling GTE's Customer Care Repair Center. During this call, GTE service representatives will verify that the end-user is a NEW PHONE customer and will then obtain the necessary information from NEW PHONE to process the trouble report. While NEW PHONE representatives are still on the line, GTE personnel will perform an initial analysis of the problem and remote line testing for resale services. If engineered services are involved, the call will be made to the GTE SSCC for handling. If no engineering is required and the line testing reveals that the trouble can be repaired remotely, GTE personnel will correct the problem and close the trouble report while NEW PHONE representatives are still on the line. If on-line resolution is not possible, GTE personnel will provide NEW PHONE representatives a commitment time for repair, and the GTE personnel then will enter the trouble ticket into the GTE service dispatch queue. NEW PHONE's repair service commitment times will be within the same intervals as GTE provides to its own end users. Maintenance and repair of GTE facilities is the responsibility of GTE and will be performed at no incremental charge to NEW PHONE. If, as a result of NEW PHONE-initiated trouble report, trouble is found to be the responsibility of NEW PHONE (e.g., non-network cause) GTE will charge NEW PHONE for trouble isolation. NEW PHONE will have the ability to report trouble for its end users to appropriate trouble reporting centers 24 hours a day, 7 days a week. NEW PHONE will be assigned a customer contact center when initial service agreements are made. 2.1.2 Repair calls to the SSCC for engineered services will be processed in essentially the same manner as those by the GTE Customer Care Center. GTE personnel will analyze the problem, provide the NEW PHONE representative with a commitment time while they are still on the line, and then place the trouble ticket in the dispatch queue. 2.1.3 GTE then will process all NEW PHONE trouble reports in the dispatch queue along with GTE trouble reports in the order they were filed (first in, first out), with priority given to out-of-service conditions. If, at any time, GTE would determine that a commitment time given to NEW PHONE becomes in jeopardy, GTE service representatives will contact NEW PHONE by telephone to advise of the jeopardy condition and provide a new commitment time. 2.1.4 Trouble reports in the dispatch queue will be transmitted electronically to GTE CZT service technicians who will repair the service problems and clear the trouble reports. For cleared NEW PHONE trouble reports, GTE service technicians will make a telephone call to NEW PHONE directly to clear the trouble ticket. GTE service technicians will make the confirmation call to the telephone number provided by NEW PHONE. If NEW PHONE is unable to process the call or places the GTE technician on hold, the call will be terminated. To avoid disconnect, NEW PHONE may develop an answering system, such as voice mail, to handle the confirmation calls expeditiously. 2.1.5 GTE will provide electronic interface access to operation support systems functions which provide the capability to initiate, status and close a repair trouble ticket. GTE will not provide to NEW PHONE real time testing capability on NEW PHONE end user services. GTE will not provide to NEW PHONE an interface for network surveillance (performance monitoring).

  • Construction Administration Phase Delete the following paragraph if Submittal Exchange isn’t going to be used:

  • Amendments to Clarify and Correct Errors and Defects The parties may amend this Agreement to clarify an ambiguity, correct an error or correct or supplement any term of this Agreement that may be defective or inconsistent with the other terms of this Agreement, in each case, without the consent of the Noteholders, the Certificateholders or any other Person. The parties may amend any term or provision of this Agreement from time to time for the purpose of conforming the terms of this Agreement to the description thereof in the Prospectus, without the consent of Noteholders, the Certificateholders or any other Person.

  • Attachments, inconsistencies and severability This Consortium Agreement consists of this core text and Attachment 1 (Background included) Attachment 2 (Accession document) Attachment 3 (List of Third Parties for simplified transfer according to Section 8.2.2) Attachment 4 (Identified Affiliated Entities) In case the terms of this Consortium Agreement are in conflict with the terms of the Grant Agreement, the terms of the latter shall prevail. In case of conflicts between the attachments and the core text of this Consortium Agreement, the latter shall prevail. Should any provision of this Consortium Agreement become invalid, illegal or unenforceable, it shall not affect the validity of the remaining provisions of this Consortium Agreement. In such a case, the Parties concerned shall be entitled to request that a valid and practicable provision be negotiated which fulfils the purpose of the original provision.

  • Order Processing Any order by you for the purchase of shares of the respective Funds through us shall be accepted at the time when it is received by us (or any clearing house agency that we may designate from time to time), and at the offering and sale price next determined, unless rejected by us or the respective Funds. In addition to the right to reject any order, the Funds have reserved the right to withhold shares from sale temporarily or permanently. We will not accept any order from you that is placed on a conditional basis or subject to any delay or contingency prior to execution. The procedures relating to the handling of orders shall be subject to instructions that we shall forward from time to time to all members of the Selling Group. The shares purchased will be issued by the respective Funds only against receipt of the purchase price, in collected New York or Los Angeles Clearing House funds subject to deduction of all concessions on such sale (reallowance of any concessions to which you are entitled on purchases at net asset value will be paid through our direct purchase concession system). If payment for the shares purchased is not received within three days after the date of confirmation the sale may be cancelled forthwith, by us or by the respective Funds, without any responsibility or liability on our part or on the part of the Funds, and we and/or the respective Funds may hold you responsible for any loss, expense, liability or damage, including loss of profit suffered by us and/or the respective Funds, resulting from your delay or failure to make payment as aforesaid.

  • Program Overview Microsoft extends to eligible partners the opportunity to participate in the Program referenced above subject to these Program Terms & Conditions (“Program Terms”). Each entity participating in the Program is hereinafter referred to as a “Participant.” Participation in the Program is voluntary. The Program is governed by the Program Terms, which incorporate by reference the Microsoft Partner Network Agreement (as in effect between Microsoft and Participant, the “MPN Agreement”). Capitalized terms used but not defined in these Program Terms have the meanings assigned to them in the MPN Agreement. These Program Terms are subject to local requirements and may vary by jurisdiction, and Participant retains sole discretion to set pricing for sales of applicable products.

  • LOCATION AND DESCRIPTION The subject property is a three-bedroom condominium unit and bearing postal address of Unit No. 5-03, Residensi Gen (also known as GenKL), Xxxxx Xxxxxx 0, Xxxxx Xxxx Xxx, 00000 Xxxxx Xxxxxx. RESERVE PRICE:- The property will be sold on an “as is where is” basis and subject to a reserve price of RM790,000.00 (RINGGIT MALAYSIA SEVEN HUNDRED AND NINETY THOUSAND ONLY) and the Conditions of Sale, herein and by way of an Assignment from the Assignee subject to the necessary confirmations / consent being obtained by the Purchaser from the Developer and/or Proprietor and/or State Authorities and/or relevant bodies, if any is required, including all terms, conditions, stipulations and covenants which were and may be imposed by the Developer and the relevant authority. All expenses incurred in obtaining the said consent shall be borne by the Purchaser. Any arrears of quit rent, assessment, service/maintenance charges, sinking fund including the late payment interest (if any) which may be lawfully due to any relevant authority or the Developer or Proprietor or relevant third parties entitled thereto up to the date of successful sale of the subject property shall be borne out of the purchase money. The Purchaser shall bear and pay all fees and expenses including but not limited to all legal fees, stamp duty and registration fees in connection with, incidental to or pursuant to the Assignment and all other documents necessary for effecting the transfer or assigning the beneficial ownership in the property to the Purchaser and shall also bear all risks in relation to the purchase of the Property. Online bidders are further subject to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx. All intending bidders are required to deposit 10% of the fixed reserve price (“the initial deposit”) by way of bank draft or cashier’s order crossed “A/C PAYEE ONLY” made payable to OCBC BANK (MALAYSIA) BERHAD prior to the auction sale or remit the same through online banking transfer, one (1) working day before auction date and pay the difference between the initial deposit and the sum equivalent to 10% of the successful bid price either in cash or bank draft or cashier’s order crossed “A/C PAYEE ONLY” made payable to OCBC BANK (MALAYSIA) BERHAD immediately after the fall of the hammer with the undermentioned Auctioneer. The balance of the purchase price is to be settled within one hundred and twenty (120) days from the date of auction sale to OCBC BANK (MALAYSIA) BERHAD. For online bidders please refer to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx on the manner of payment of the deposit. For further particulars, please contact Messrs Xxxxx & Xxxx, Solicitors for the Assignee herein whose address is No. 16-08, Level 16, Menara Centara, 000, Xxxxx Xxxxxx Xxxxx Xxxxxx, 50100 Kuala Lumpur. (Ref.: RL/OCBC-LIT/0000-0000, Tel.: 00-0000 0000, Fax: 00-0000 0000) or the undermentioned Auctioneer. EHSAN AUCTIONEERS SDN. BHD. (Co. No. 617309-U) DATO’ HAJI XXXXX XXXXX BIN X.X. XXXX (D.I.M.P) Suite C-20-3A, Level 20, Block C, Megan Avenue II, / XXXXX XXXXX BIN XXXXXX 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur (Licensed Auctioneers) Tel No.: 00-0000 0000 Fax No.: 00-0000 0000 Our Ref: ALIN/OCBC1132/AW Website: xxx.xxxxxxxxxxxxxxxx.xxx E-mail: xxxx@xxxxxxxxxxxxxxxx.xxx HP NO. : 000-0000 000 (CALL, WHATSAPP & SMS) PERISYTIHARAN JUALAN DALAM PERKARA PERJANJIAN KEMUDAHAN (PERBANKAN PENGGUNA), SURATIKATAN PENYERAHAN HAK (HARTANAH) XXX SURAT KUASA WAKIL (HARTANAH) KESEMUANYA BERTARIKH 13HB OGOS, 2019 DI ANTARA OCBC BANK (MALAYSIA) BERHAD (295400-W) PIHAK PEMEGANG SERAHHAK/BANK XXX XXX KAH MEE (NO K/P.: 890218-14-6078) PIHAK PENYERAHHAK/PIHAK PEMINJAM Menurut kuasa xxx xxx xxxx telah Diberikan Kepada Pihak Pemegang Serahhak/Bank di bawah perkara Perjanjian Kemudahan (Perbankan Pengguna), Suratikatan Penyerahan Hak (Hartanah) xxx Surat Kuasa Wakil (Hartanah) kesemuanya bertarikh 13hb Ogos, 2019 di antara Pihak Penyerahhak/Peminjam xxx Pihak Pemegang Serahhak/Bank, xxx berkenaan dengan Perjanjian Jualbeli di antara Asiana Agresif Sdn. Bhd. (“Penjual”) xxx Xxx Kah Mee (“Pembeli”) bertarikh pada 27hb Jun, 2019 adalah dengan ini diisytiharkan bahawa Pihak Pemegang Serahhak dengan dibantu oleh Pelelong yang tersebut di bawah:- LELONGAN AWAM SECARA ATAS TALIAN PADA HARI SELASA, 24HB MEI, 2022, JAM 10.30 PAGI, XX XXXXX WEB xxx.xxxxxxxxxxxxxxxx.xxx Bakal pembida boleh mengemukakan bida untuk hartanah dalam talian melalui xxx.xxxxxxxxxxxxxxxx.xxx (Untuk pembidaan dalam talian, xxxx daftar sekurang-kurangnya satu (1) hari bekerja sebelum hari lelong untuk tujuan pendaftaran & pengesahan)

  • SECTION HEADINGS; INCONSISTENCY The section headings used in this Agreement are included solely for convenience and shall not affect, or be used in connection with, the interpretation of this Agreement. In the event of any inconsistency between the terms of this Agreement and any form, award, plan or policy of the Company, the terms of this Agreement shall govern and control.