Construction Fencing. Commence construction until temporary fencing has been erected on the entire length of all unfenced boundaries. The temporary fence must comprise removable wire or shade cloth (or other see-through material) and must provide only one vehicle access to the lot from the road or right-of-way.
Construction Fencing. The Owner acknowledges and agrees to install construction fencing that is acceptable to the National Capital Commission along the National Capital Commission‟s property and fencing elsewhere acceptable to the General Manager, Planning and Growth Management, all at its expense, in such a location as may be determined by the General Manager, Planning and Growth Management.
Construction Fencing. Along every road, sidewalk or other access point bordering demolition operations construction fencing not less than 6 feet in height shall be erected to prevent unauthorized persons from entering the site of such operations.
Construction Fencing. City shall be entitled to encroach upon County Property, Parking Lot, and the 815 Property to erect construction fencing around the City Structure Construction site. City’s Construction Fencing encroachment onto County Property, Parking Lot, and 815 K Property shall be minimal and only to the extent necessary to protect the City Structure construction site.
Construction Fencing. JGJP shall maintain a perimeter construction fence along Lake Xxxxxx Drive, Buffalo Street, Lot 3 (000 X. Xxxxxxx Xxxxxx) and the 40' public right-of-way until the Town agrees that it is appropriate to remove such fencing. Portions of the rights-of-ways may be used with the Town Engineer's prior approval. JGJP shall pay all associated fees under the DMC. JGJP shall provide the Town Engineer with a current fencing plan at all times during construction.
Construction Fencing. Landlord acknowledges the importance that the perimeter of the Retained Land being at all times secured due to the nature of the operations at the Sypris Facility. Prior to the commencement of any clearing, construction staging, earth work or other construction activities on the Released Land (“Construction Commencement”), Landlord shall cause a six (6) foot chain link construction fence to be erected around the Released Land and a portion of the Retained Land upon which certain Landlord’s Work is to be performed (the “Construction Fence”). The Construction Fence shall be in the location set out on Exhibit “D-1”. A portion of the Construction Fence, which runs from the Released Land across the 100’ platted utility easement to the east of the Released Land (designated as the “Easement Fence” on Exhibit “D-1”) shall be constructed to be permanent and shall remain to connect the Permanent Fence (as defined below) to the existing fence running along the east side of the 100 foot platted utility easement. The Easement Fence shall include a gate on each side and shall be in accordance with specifications approved by Tampa Electric Company, which approval Tenant agrees to coordinate. Tenant shall be responsible for the ongoing maintenance of the Easement Fence, subject to Landlord’s obligation to correct Defects as provided for in Section 12 below.
Construction Fencing. Prior to the commencement of construction, XX XXXXX LLC will erect and maintain construction fencing including silk fencing in order to screen the property and limit dust and other impacts on the community. XX XXXXX LLC shall maintain fencing free of dust and debris and in good order repair. All construction materials and equipment including portable toilets will be located behind construction fence for the duration of construction. Portable toilets will be maintained and cleaned regularly and locked when construction day ends.
Construction Fencing. Protective fencing shall be erected at the property line, to create a solid continuous face for the height of the construction bridge or fifteen feet (15’), whichever is greater. The side of the fence that faces the pedestrian right-of-way shall be a smooth faced and uniform material such as plywood, with as few seams as practicable. The fencing shall be painted in bright primary colors. Graphics or theatrical and/or other advertising sign boards may be provided on the fencing.
Construction Fencing. The Developer shall maintain a perimeter construction fence along the edges of the Development at all times during construction until the Town agrees that it is appropriate to remove this fencing in order to protect the life and safety of the public. Portions of the rights-of-ways may be used by the Developer as approved by the Town Engineer. The Developer shall provide the Town Engineer with a current fencing plan at all times during construction.
Construction Fencing. The Developer shall maintain a perimeter construction fence in order to protect the life and safety of the public. The Developer shall always provide the Town Engineer with a current fencing plan.