Cracks Sample Clauses

Cracks. Any cracks that touches the inner boundary of the PCCO on the die is rejectable.
AutoNDA by SimpleDocs
Cracks f. Decay or cavity (large trunk wound).
Cracks. It is advisable to pre-treat the cracks in the surface with an acceptable crack sealer prior to the application of the Micro-Surfacing. The Project Manager or his/her designee will make the determination on a road by road basis whether pre-treatment will be required. APPLICATION GENERAL If required by the Project Manager, it is recommended that a test strip be placed in conditions similar to those expected to be encountered during the project. When required by local conditions, the surface shall be pre-wetted by fogging ahead of the spreader box. The rate of application of the fog spray shall be adjusted during the day to suit temperatures, surface texture, humidity, and dryness of the pavement. The Micro-Surfacing shall be of the desired consistency upon leaving the mixer. A sufficient amount of material shall be carried in all parts of the spreader at all times so that a complete coverage is obtained. Overloading of the spreader shall be avoided. No lumping, balling, or unmixed aggregate shall be permitted. No streaks, such as those caused by oversized aggregate, shall be left in the finished surface. If excess streaking develops, the job will be stopped until the contractor proves to the Project Manager or his/her designee that the situation has been corrected. Excessive streaking is defined as more than four drag marks greater than one-half (½) inch wide (12.7 mm) and four inches (4) long (101 mm), or one inch (1) wide (25.4 mm) and three (3) inches long (76.2 mm), in any 29.9 yd² (25 m²) area. No transverse ripples or longitudinal streaks of one-fourth (¼) inch in depth (6.4 m²) will be permitted, when measured by placing a ten (10) foot (3 m) straight edge over the surface. JOINTS No excess buildup, uncovered areas, or unsightly appearance shall be permitted on longitudinal or transverse joints. The contractor shall provide suitable-width spreading equipment to produce a minimum number of longitudinal joints throughout the project. When possible, longitudinal joints shall be placed on lane lines. Half passes and odd-width passes will be used only in minimum amounts. If half passes are used, they shall not be the last pass of any paved area. A maximum of three (3) inches (76.2 mm) shall be allowed for overlap of longitudinal lane line joints. Also, the joint shall have no more than a one-fourth (¼) inch (6.4 mm) difference in elevation when measured by placing a ten (10) foot (3 m) straight edge over the joint and measuring the elevation drop-off.

Related to Cracks

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Windows a. Front and rear windshield per California Vehicle Code § 26710.

Time is Money Join Law Insider Premium to draft better contracts faster.