Criterion Scoring Sample Clauses

Criterion Scoring. Criterion scores shall be based on the four level rating descriptors specified in RCW 28A.405.100 and Chapter 392-191A WAC. Criterion scores will be determined by analysis of evidence gathered and an overall summative score shall be derived consistent with the process set forth in chapter 392-191A WAC.
AutoNDA by SimpleDocs
Criterion Scoring. Each criterion shall be rated collaboratively based on the components in that criterion using a preponderance of the evidence. This analysis will be based on a holistic assessment of the teacher’s performance. If the criterion score is not clear, guiding questions from the Washington State framework authors shall be used to reflect on the evidence to determine an informed professional judgment about what the criterion level score should be.
Criterion Scoring. The District and the Association both hold a strong belief in the “shared responsibility” for 36 evidence gathering and analysis. Criterion scoring will be based on analysis of evidence. 37 Scoring will not be based upon an average of scores, coring band, or mathematical formula 38 except as otherwise prescribed by the Office of Superintendent of Public Instruction.

Related to Criterion Scoring

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Criteria (1) Annual Evaluation Criteria. All performance evaluations shall be based upon assigned duties, and shall carefully consider the nature of the assignment in terms, where applicable, of: a. Teaching effectiveness, including effectiveness in presenting knowledge, information, and ideas by means or methods such as lecture, discussion, assignment and recitation, demonstration, laboratory exercise, practical experience, supervision of interns, theses, professional projects and/or dissertations, and direct consultation with students. The evaluation shall include consideration of effectiveness in imparting knowledge and skills, and effectiveness in stimulating students' critical thinking and/or creative abilities, the development or revision of curriculum and course structure, and adherence to accepted standards of professional behavior in meeting responsibilities to students. The evaluator may take into account class notes, syllabi, student exams and assignments, and any other materials relevant to the employee's teaching assignment. The teaching evaluation must take into account any relevant materials submitted by the employee, including the results of peer evaluations of teaching, and may not be based solely on student evaluations when this additional information has been made available to the evaluator. b. Contribution to the discovery of new knowledge, development of new educational techniques, and other forms of creative activity. Evidence of research and other creative activity shall include, but not be limited to, published books; articles and papers in professional journals; musical compositions, paintings, sculpture; works of performing art; papers presented at meetings of professional societies; funded grant activities; and research and creative accomplishments that have not yet resulted in publication, display, or performance. The evaluation shall include consideration of the employee's productivity, including the quality and quantity of the employee's research and other creative programs and contributions during the year, as well as recognition by the academic or professional community of what has been done. c. Public service that extends professional or discipline-related contributions to the community, the State, public schools, and/or the national and international community. This public service includes contributions to scholarly and professional organizations, governmental boards, agencies, and commissions that are beneficial to such groups and individuals. d. Participation in the governance processes of the University through significant service on committees, councils, and senates, beyond that associated with the expected responsibility to participate in the governance of the University through participation in regular departmental or college meetings. e. Other assigned University duties, such as attending University events, advising, counseling, and academic administration, or as described in a Position Description, if any, of the position held by the employee. Other assigned duties may include entrepreneurial activities that contribute to the further development of the University with an end result of creating a new venture. Evidence of entrepreneurial contributions shall include, but not be limited to, creation of self- supporting centers or institutes, development of multi- disciplinary research partnerships, and applications of research to implementations in society. To provide guidelines for the establishment, maintenance and use of employee evaluation files within the employee’s respective academic unit.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Target Population TREATMENT FOR ADULT (TRA) Target Population

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Performance Measurement The Uniform Guidance requires completion of OMB-approved standard information collection forms (the PPR). The form focuses on outcomes, as related to the Federal Award Performance Goals that awarding Federal agencies are required to detail in the Awards.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Performance Measure Grantee will adhere to the performance measures requirements documented in

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!