Decontamination of Work Equipment Sample Clauses

Decontamination of Work Equipment. Permittee shall inspect and decontaminate all tools, waders, boots, and other work-related equipment that will enter water prior to entering and exiting the work site and/or between each use in different waterbodies to avoid the introduction and transfer of organisms between waterbodies. Permittee shall decontaminate project gear and equipment using one of three methods: 1) drying; 2) hot water soak; or 3) freezing, as appropriate to the type of gear or equipment. For all methods, Permittee shall begin the decontamination process by thoroughly scrubbing equipment, paying close attention to small crevices such as bootlaces, seams, and net corners, with a stiff-bristled brush to remove all organisms. To decontaminate by drying, Permittee shall allow equipment to dry thoroughly (i.e., until there is a complete absence of water), preferably in the sun, and keep the equipment dry for a minimum of 48 hours. To decontaminate using a hot water soak, Permittee shall immerse equipment in 140°F or hotter water and soak, completely submerged, for a minimum of five minutes. To decontaminate by freezing, Permittee shall place equipment in a freezer 32°F or colder for a minimum of eight hours. Repeat decontamination is required only if the equipment or clothing is removed from the Project Site, used within a different waterbody, and returned to the Project Site or different waterbody.
Decontamination of Work Equipment. Permittee shall inspect and decontaminate all tools, waders, boots, and other work-related equipment that will enter water prior to entering and exiting the work site and/or between each use in different waterbodies to avoid the introduction and transfer of organisms between waterbodies. Permittee shall decontaminate project gear and equipment using one of three methods: 1) Drying: Permittee shall allow equipment to dry thoroughly (i.e., until there is a complete absence of water), preferably in the sun, and keep the equipment dry for a minimum of 48 hours. 2) Hot water soak: Permittee shall immerse equipment in 140°F or hotter water and soak, completely submerged, for a minimum of five minutes. 3) Freezing, as appropriate to the type of gear or equipment: Permittee shall place equipment in a freezer 32°F or colder for a minimum of eight hours. For all methods, Permittee shall begin the decontamination process by thoroughly scrubbing equipment, paying close attention to small crevices such as bootlaces, seams, and net corners, with a stiff-bristled brush to remove all organisms. Repeat decontamination is required only if the equipment or clothing is removed from the Project Site, used within a different waterbody, and returned to the Project Site or different waterbody.

Related to Decontamination of Work Equipment

  • Safety Equipment Should the employment duties of an employee in the bargaining unit require use of any equipment or gear to insure the safety of the employee or others, the District agrees to furnish such equipment or gear.

  • Inspection of Work CONSULTANT and any subconsultant shall permit LOCAL AGENCY, the State, and the FHWA if federal participating funds are used in this AGREEMENT; to review and inspect the project activities and files at all reasonable times during the performance period of this AGREEMENT.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • PROTECTION OF WORK AND PROPERTY Contractor shall erect and properly maintain at all times, as required by conditions and progress of the Work, all necessary safeguards, signs, barriers, lights, and security persons for protection of workers and the public, and shall post danger signs warning against hazards created by the Work. In an emergency affecting life and safety of life or of Work or of adjoining property, Contractor, without special instruction or authorization from District, is permitted to act at his discretion to prevent such threatened loss or injury.

  • Customer Equipment “Customer Equipment” means any Customer-owned or provided software, hardware or services that you elect to use in connection with the Service(s). You agree to allow us and our agents the rights to insert CableCARDs and other hardware in the Customer Equipment, send software and/or downloads to the Customer Equipment and install, configure, maintain, inspect and upgrade the Customer Equipment. You warrant you are either the owner of the Customer Equipment or that you have the authority to give us access to the Customer Equipment. You should call Customer Service at 0-000-XXX-XXXX to find out if it meets our technical, security and other requirements. We reserve the right to disallow the use of Customer Equipment that we determine is not compatible with our network. We shall have no obligation to provide, maintain, or service Customer Equipment, including, but not limited to, Customer Equipment to which the Company or a third party has sent software or downloads. If you use Customer Equipment, you agree that the following limitation of liability shall apply: THE COMPANY DOES NOT WARRANT THAT CUSTOMER EQUIPMENT WILL ENABLE YOU TO SUCCESSFULLY INSTALL, ACCESS, OPERATE, OR USE THE SERVICE(S). YOU ACKNOWLEDGE THAT ANY SUCH INSTALLATION, ACCESS, OPERATION, OR USE COULD CAUSE CUSTOMER EQUIPMENT TO FAIL TO OPERATE OR COULD CAUSE DAMAGE TO CUSTOMER EQUIPMENT, YOU, YOUR PREMISES OR COMPANY EQUIPMENT. NEITHER THE COMPANY NOR ANY OF ITS AFFILIATES, SUPPLIERS OR AGENTS SHALL HAVE ANY LIABILITY WHATSOEVER FOR ANY SUCH FAILURE OR DAMAGE, INCLUDING LACK OF 911/E911 CAPABILITY OR DIALING ASSOCIATED WITH A SECURITY SYSTEM. YOUR USE OF CUSTOMER EQUIPMENT MAY PREVENT PROVISION OF SERVICE. The foregoing limitation of liability is in addition to and shall not limit any other limitation of liability set forth in this Agreement.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except:

  • CORRECTION OF WORK 13.2.1 The Contractor shall be responsible for correcting all Work which the Architect has found to be defective or which fails to conform to the Contract Documents whether observed be- fore or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including compensation for the Architect's and the State’s additional services made necessary thereby. 13.2.2 If, within one year after the Date of Substantial Completion of the Work or designated portion thereof or within one year after acceptance by the State of designated equipment or within such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the State to do so unless the State has previously given the Contractor a written acceptance of such condition. This obligation shall survive termination of the Contract. The State shall give such notice promptly after discovery of the condition. 13.2.3 The Contractor shall remove from the site all portions of the Work which are defective or non-conforming and which have not been corrected under Subparagraphs 4.5.1, 13.2.1 and 13.2.4 If the Contractor fails to correct defective or nonconforming Work as provided in Subparagraphs 4.5.1, 13.2.1 and 13.2.2, the State may correct it in accordance with Paragraph 13.2.5 If the Contractor does not proceed with the correction of such defective or non- conforming Work within a reasonable time fixed by written notice from the Architect, the State may remove it and may store the materials or equipment at the expense of the Contractor. If the Contractor does not pay the cost of such removal and storage within ten days thereafter, the State may upon ten additional days written notice sell such Work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have been borne by the Contractor, including compensation for the Architect's and the State’s additional services and expenses made necessary thereby. If such proceeds of sale do not cover all costs which the Contractor should have borne, the difference shall be charged to the Contractor and an appropriate Change Order shall be issued. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the State. 13.2.6 The Contractor shall bear the cost of making good all work of the State or separate contractors destroyed or damaged by such correction or removal. 13.2.7 Nothing contained in this Paragraph 13.2 shall be construed to establish a period of limitation with respect to any other obligation which the Contractor might have under the

  • Location of Work The Executive shall be based in the United States in West Orange, New Jersey. However, the Executive agrees to undertake whatever domestic and worldwide travel is required by the Company. The Executive shall not be required or permitted to relocate without the mutual, written consent of the Executive and the Company.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.