DESCRIPTION OF POWER SYSTEMS Sample Clauses

DESCRIPTION OF POWER SYSTEMS. A. The existing normal power service to the existing building is anticipated to be of sufficient size to serve the needs of the new project. The existing electrical service to the building is 2500A, 3-phase, 4-wire at 480/277V. The existing meter on the service entrance switchboard showed the existing power draw (on 10-2-2018) to be 674A and the maximum power draw to be 1279A. Therefore the maximum power draw is slightly over 51% of the electrical systems capacity. There are no spares or spaces in the existing switchboard, however there is floor space for an additional switchboard section should it be required for the new project. 1. The main electrical room contains non-emergency panelboards with spare capacity for new building loads: a. 225A - 277/480V panelboard “JVIC-01SW-BCP03” contains 30 circuits. Only 13 circuits are being utilized. This panel could be used to subfeed a 100A - 277/480V panelboard in the new project area, or individual branch circuits could be taken from this panel to the new area. b. 225A – 120/208V panelboard “JVIC-01SW-BCP01” contains 84 circuits. Approximately 60 circuits are being utilized. There is a 100A/3P circuit breaker in the off position which could be used to serve a new panelboard in the new project area. This breaker needs to be confirmed to be spare. If it is not spare, (3) 20A/1P spare breakers could be removed and replaced with (1) 100A/3P breaker to feed a new panelboard in the new project area. c. 225A – 120/208V panelboard “JVIC-01SW-BCP02” contains 84 circuits. Approximately 54 circuits are being utilized. This panelboard could be used to subfeed a new 100A panelboard in the new project area. Replacing (3) 20A/1P circuit breakers with (1) 100A/3P circuit breaker would be required. d. 600A - 480/277V distribution panelboard “JVIC-01SW-DPN01” contains one 30A/3P space. 2. The second floor electrical room contains non-emergency panelboards with spare capacity for new building loads. The panelboards on the second floor are labeled differently than the record drawings show. The power source for each panelboard should be verified with the facilities manager: a. 225A – 277/480V branch circuit panelboard “JVIC-02SE-BCP05” has (34) 20A/1P spares which could be used for new normal powered loads. b. 225A – 120/208V branch circuit panelboard “JVIC-02SE-BCP06” has (39) 20A/1P spares which could be used for new normal powered loads. 3. The third floor electrical room was not surveyed. Power availability for non-emergency pow...
AutoNDA by SimpleDocs

Related to DESCRIPTION OF POWER SYSTEMS

  • DESCRIPTION OF PROJECT For the Company to be eligible to earn the Maximum Credit Amount, the Company will satisfy its obligations as reflected in the following representations, which the IEDC has relied upon: A. The Company will complete the Project at the Project Location. B. The Company represents that the number of permanent, Full-Time Employees (as defined in Indiana Code § 6–3.1–13–4) from whom Indiana state income tax withholdings are retained by the State of Indiana, employed as of the Commencement Date at the Project Location, is the Base Employment Number. C. The Project will result in the creation of New Employees (as defined in Indiana Code § 6- 3.1-13-6) at the Project Location of at least the Additional Jobs Commitment. D. The average of the hourly wages, before benefits, paid to New Employees at the Project Location, will at least equal the Average Wage Commitment. E. At the discretion of the IEDC, New Employees that are paid an average wage of less than the Minimum Wage Commitment may be excluded for the purpose of calculating the credit amount. F. The Project is anticipated to involve at least the Capital Investment Amount.

  • Description of Projects Services a. Project/Services to be performed by A-E shall consist of the work as specified herein and as required in Attachment A. If in the event Attachment A shall be in conflict with any provision of this Contract, the wording as set forth in Attachment A shall prevail. b. A-E shall be responsible for submitting all Projects/Services to County in a form which has been thoroughly reviewed and checked for completeness, accuracy and consistency by the registered professional named in Section 1.1.2 herein; and, any Projects/Services not meeting this requirement will be returned to A-E prior to review by County.

  • General Description of Services The A-E will be contacted by County Project Management staff on an “as-needed” basis as projects arise to provide A-E for professional services. Requirements will be discussed by both Parties and A-E shall prepare a written Scope Statement that will include the specific work to be performed, including the costs and time required to complete the project/task. Orange County Project Management staff will then review the A-E’s Scope Statement, proceed with negotiation of task costs and when satisfied, issue a Contract Task Order (“CTO”) against this Contract. The A-E shall serve as lead of a design team that may include other construction design professionals working together to ensure that the original design is carried through to the finished product, with no alterations in materials or design that would lead to safety issues or compromise the quality of the building or building component. Other team members who may be retained by the lead to support a project as a consultant may include but are not limited to landscape architects, lighting designers, data consultants, security consultants, controls engineers, commissioning consultants, traffic engineers, surveyors, estimators, special inspection, etc. The A-E shall be responsible for the preparation of comprehensive building assessments, designs, drawings, specifications, cost estimates, and reports within the scope of the CTO. In the preparation of construction drawings and specification, the A-E shall also responsible for: A. Obtaining data by reviewing record drawings, visiting the site of the construction and by conferences with the User/Client and facility maintenance staff or by other actions as necessary to develop the design; B. Checking of shop drawings, submittals, materials and other data submitted by the Construction Contractor for approval; C. Furnishing consultation and advice to County to clarify the intent of the drawings and specifications and on questions that may arise during the construction of the project; D. Space planning, programming and code compliance review and upgrades; E. The meeting of submittal dates included in the Scope Statement of the Contract Task Order, including the work of consultants; F. Coordination with various agencies having authority of jurisdiction for planning services, entitlement, fire life safety, CEQA, ADA, etc.; G. Construction administration services, testing and commissioning; H. Close out services, as-built plans, material lists, project acceptance, etc. I. The coordination of the various elements of the design to assure compatibility of architectural, structural, electrical, mechanical/plumbing, and other design features; J. Other services as specifically included in the Contract Task Order related to project Initiation, Planning/Design, Bid/Award, Construction and Closeout. The A-E shall restrict themselves to the Scope Statement of the Contract Task Order. Any changes in the Scope Statement shall require prior written authorization by County.

  • General Description of Facilities Subject to and upon the terms and conditions herein set forth, (i) the Lenders hereby establish in favor of the Borrower a revolving credit facility pursuant to which each Lender severally agrees (to the extent of such Lender’s Revolving Commitment) to make Revolving Loans to the Borrower in accordance with Section 2.2, (ii) the Issuing Bank may issue Letters of Credit in accordance with Section 2.22, (iii) the Swingline Lender may make Swingline Loans in accordance with Section 2.4, (iv) each Lender agrees to purchase a participation interest in the Letters of Credit and the Swingline Loans pursuant to the terms and conditions hereof; provided, that in no event shall the aggregate principal amount of all outstanding Revolving Loans, Swingline Loans and outstanding LC Exposure exceed the Aggregate Revolving Commitments in effect from time to time; and (v) each Lender severally agrees to make a Term Loan to the Borrower on the Closing Date in a principal amount not exceeding such Lender’s Term Loan Commitment.

  • Description of the Services 1.1 The scope of the service to be rendered is described more fully in the Annexures and Schedules referred to below: ❑ Annexure A – Scope / Specification ❑ Annexure C – Pricing Schedule The Deliverables, due for completion by and governed by this Schedule 1. In the event that the Service Provider fails to meet the delivery dates as agreed, the following penalties will be imposed:

  • Description of Services A description of Google Workspace for Education Service provided by Google is set forth in the Services Summary located at xxxxx://xxxxxxxxx.xxxxxx.xxx/terms/user_features.html.

  • LOCATION AND DESCRIPTION OF THE PROPERTY The subject property is a single-storey terraced house bearing the postal address of Xx. 00, Xxxxxx 00/XX0, Xxxxxx Xxxxx Xxxxxxx, 00000 Xxxxxxx Xxxxx, Xxxxxx. The subject property will be sold on an “as is where is basis” and subject to a reserve price of RM310,000.00 (RINGGIT MALAYSIA THREE HUNDRED TEN THOUSAND ONLY) and subject to the Conditions of Sale and by way of an Assignment from the above Assignee/Bank subject to the consent being obtained by the Purchaser from the Developer and other relevant authorities if any, including all terms, conditions, stipulations and covenants which were and may be imposed by the Developer and the relevant authorities. Any arrears of quit rent, assessments and service or maintenance charges which may be lawfully due to any relevant authority or the Developer up to the date of auction sale of the property shall be paid out of the purchase money upon receipt of full purchase price. All other fees, costs and charges relating to the transfer and assignment of the property shall be borne by the successful Purchaser. Online bidders are further subject to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx. All intending bidders are required to deposit 10% of the fixed reserve price for the said property by Bank Draft or Cashier’s Order in favour of UOBM for KRISHNAMAL A/P MURLIGIAH & XXXXXXXXXXX A/L XXXXXXX or remit the same through online banking transfer, one (1) working day before auction date. The balance of the purchase money shall be paid by the Purchaser within one hundred and twenty (120) days from the date of auction sale to UNITED OVERSEAS BANK (MALAYSIA) BHD via Real Time Electronics Transfer of Funds and Securities (XXXXXX). For online bidders please refer to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx on the manner of payment of the deposit. FOR FURTHER PARTICULARS, please contact M/S HOE & MOIRA, of Xxxxx 000X (Xxxxx), 0xx Xxxxx, Xxxxx Xxxxxx Xxxxxx, Xxxxxxxxxx Xxxx, 00000 Xxxxxx, Xxxxxxxx. (Ref:H&M/MT/Z4P/CB23/16) Tel.: 00-000 0000, Fax: 00-000 0000) the Assignee herein or the undermentioned Auctioneer. Suite C-20-3A, Level 20, Block C, Megan Avenue II, / XXXXX XXXXX BIN XXXXXX 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur (Licensed Auctioneers) Tel No.: 00-0000 0000 Fax No.: 00-0000 0000 Our Ref: LIAN/UOB1035HM Website: xxx.xxxxxxxxxxxxxxxx.xxx E-mail: xxxx@xxxxxxxxxxxxxxxx.xxx [berkuatkuasa dari 1.11.2022, perniagaan perbankan pengguna (consumer banking business) CITIBANK BERHAD (No. Syarikat: 199401011410 (297089-M) telah dipindahmilik kepada xxx diletakhakkan kepada UOB di bawah Perintah Letakhak bertarikh 12.10.2022 melalui Mahkamah Tinggi Kuala Lumpur Saman Pemula No. WA-24NCC-903-09/2022] Dalam menjalankan xxx xxx kuasa xxxx telah diberikan kepada Pihak Pemegang Serahhak/Bank dibawah Perjanjian Kemudahan, Penyerahanhak xxx Surat Kuasa Wakil kesemuanya Bertarikh 09hb Julai, 2001 diantara Pihak Penyerahhak, Pihak Pelanggan xxx Pihak Pemegang Serahhak/Bank yang diperbuat dalam perkara diatas, adalah dengan ini diisytiharkan bahawa Pihak Pemegang Serahhak/Bank tersebut dengan bantuan Pelelong yang tersebut dibawah.

  • Description of Facility Provide the following information for all units at the Facility, regardless of their RMR designation status. Information regarding units not designated as Reliability Must-Run Units is required only if and to the extent that the information is used to allocate Facility costs between Reliability Must-Run Units and other units. Unit RMR (Y/N) Maximum Net Dependable Capacity (includes CAISO-paid Upgrade capacity)* Fuel Type For this Facility, the Owner will use [insert either MW, MWhs, or service hours] in Schedule B to allocate Annual Fixed Revenue Requirements to and among Units. This election shall be applicable to all Facilities containing Reliability Must Run Units subject to any “RMR contract” as defined in the CAISO Tariff executed by Owner or any of its affiliates as defined in 18 CFR § 161.2. * Maximum Net Dependable Capacity shall reflect any transformer or line loss to the Delivery Point.

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!