Detailed Assessment Stage Sample Clauses

Detailed Assessment Stage. The Detailed Assessment will include as many of the following as are necessary over and above those applicable items in sub-sections 2.1.1 (b): (i) advising SANRAL as to the need for any further surveys of any kind, tests and investigations which may be required, and arranging for these to be carried out; (ii) advising SANRAL as may be necessary, upon the appointment and co-ordination of the services of other professional engineers, architects and specialist advisers and arranging such appointments and consultations with such advisers in matters affecting the Works; (iii) identifying the cause and mechanism of any distress; (iv) analysing of the structural capacity of the existing pavement to determine the remaining life expectation thereof; (v) recommending an appropriate Rehabilitation alternative including a comparison on an economic basis; and recommendation on immediate maintenance measures; (vi) compiling and submitting a detailed assessment report; (vii) the submission to SANRAL of progress and budget/cashflow reports as required, indicating the progress made and the causes of delay and changes in the budget, if any;
AutoNDA by SimpleDocs
Detailed Assessment Stage. For this Stage the fee shall be calculated on a time and cost basis in terms of Annexure 2 or on a method as mutually agreed upon between SANRAL and the Consulting Firm and shall become due to the Consulting Firm on the submission to and approval by SANRAL of the Detail Assessment Report.

Related to Detailed Assessment Stage

  • Needs Assessment The determination of whether the Annual Income of a family or individual occupying or seeking to occupy a Qualifying Unit complies with the requirements for Extremely Low-Income Households or Low- to Moderate-Income Households shall be made by the applicable housing authority in the CDBG-DR Program area prior to admission of such family or individual to occupancy of a Qualifying Unit.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Problem Statement School bus fleets are aging, and our communities have poor air quality. Replacing school buses with zero emission school buses will address both of these issues.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Conformity Assessment Procedures 1. Each Party shall give positive consideration to accepting the results of conformity assessment procedures of other Parties, even where those procedures differ from its own, provided it is satisfied that those procedures offer an assurance of conformity with applicable technical regulations or standards equivalent to its own procedures. 2. Each Party shall seek to enhance the acceptance of the results of conformity assessment procedures conducted in the territories of other Parties with a view to increasing efficiency, avoiding duplication and ensuring cost effectiveness of the conformity assessments. In this regard, each Party may choose, depending on the situation of the Party and the specific sectors involved, a broad range of approaches. These may include but are not limited to: (a) recognition by a Party of the results of conformity assessments performed in the territory of another Party; (b) recognition of co-operative arrangements between accreditation bodies in the territories of the Parties; (c) mutual recognition of conformity assessment procedures conducted by bodies located in the territory of each Party; (d) accreditation of conformity assessment bodies in the territory of another Party; (e) use of existing regional and international multilateral recognition agreements and arrangements; (f) designating conformity assessment bodies located in the territory of another Party to perform conformity assessment; and (g) suppliers’ declaration of conformity. 3. Each Party shall exchange information with other Parties on its experience in the development and application of the approaches in Paragraph 2(a) to (g) and other appropriate approaches with a view to facilitating the acceptance of the results of conformity assessment procedures. 4. A Party shall, upon request of another Party, explain its reasons for not accepting the results of any conformity assessment procedure performed in the territory of that other Party.

  • Feasibility Study A feasibility study will identify the potential costs, service quality and other benefits which would result from contracting out the work in question. The cost analysis for the feasibility study shall not include the Employer’s indirect overhead costs for existing salaries or wages and benefits for administrative staff or for rent, equipment, utilities, and materials, except to the extent that such costs are attributable solely to performing the services to be contracted out. Upon completion of the feasibility study, the Employer agrees to furnish the Union with a copy if the feasibility study, the bid from the Apparent Successful Bidder and all pertinent information upon which the Employer based its decision to contract out the work including, but not limited to, the total cost savings the Employer anticipates. The Employer shall not go forward with contracting out the work in question if more than sixty percent (60%) of any projected savings resulting from the contracting out are attributable to lower employee wage and benefit costs.

  • Screening and Assessment Grantee shall: 1. Comply with all applicable rules in the TAC for SUD programs as stated in the SUD UM Guidelines Information, Rules, and Regulations regarding Screening and Assessment. 2. When documenting a CMBHS Substance Use Disorder screening, Grantee shall conduct the screening in a confidential, face-to-face interview unless there is documented justification for an interview by phone. 3. Document Financial Eligibility in CMBHS as required in the SUD UM Guidelines. 4. Conduct and document a CMBHS SUD Initial Assessment with the client to determine the appropriate levels of care for SUD treatment. The CMBHS assessment will identify the impact of substances on the physical, mental health, and other identified issues including Tuberculosis, Hepatitis C, sexually transmitted infection (STI), and Human Immunodeficiency Virus (HIV). i. If client indicates risk for these communicable diseases, Grantee shall refer the client to the appropriate community resources for further testing and counseling. ii. If the client is at risk for HIV, Grantee shall refer the client to pre and post- test counseling on HIV. 5. Grantee will also consider referring to the TRA Statewide HIV Intensive Residential Treatment facility to concurrently address medical needs and SUD. 6. If a client is living with HIV, Grantee will refer the client to the appropriate community resources to complete the necessary referrals and health related paperwork. 7. The assessment shall be signed by a Qualified Credential Counselor (QCC) and filed in the client record within three (3) service days of admission or a program may accept an evaluation from an outside entity if it meets the criteria for admission and was completed during the thirty (30) business days preceding admission.

  • Joint Assessment If the Premises are not separately assessed, Lessee's liability shall be an equitable proportion of the Real Property Taxes for all of the land and improvements included within the tax parcel assessed, such proportion to be conclusively determined by Lessor from the respective valuations assigned in the assessor's work sheets or such other information as may be reasonably available.

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013). 6.3.2 Teachers shall use their professional judgment to determine which assessment and/or evaluation tool(s) from the Board list of preapproved assessment tools is applicable, for which student(s), as well as the frequency and timing of the tool. In order to inform their instruction, teachers must utilize diagnostic assessment during the school year.

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!