Detention Basins Sample Clauses

Detention Basins. Prior to construction of the detention basins for the Project, Developer shall obtain approval of plans that meet the requirements of Section 15.50.060 of the Vested Laws. As part of the approval, City may require Developer to install drain tiles or other drainage improvements, weed barrier, landscape rock, biograss, or other forms of water-wise landscaping and irrigation system within the detention basins to minimize maintenance.
AutoNDA by SimpleDocs
Detention Basins. Detention basins and drainage facilities throughout the Project shall be designed as site amenities. Wherever possible, detention basins shall be connected to and made part of the Project’s open space system and improved with trails and gathering areas.

Related to Detention Basins

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Workplace Violence Prevention A. In order to provide a safe and healthy workplace for employees, the State agrees to develop and implement "Workplace Violence Prevention" policies and programs.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

Time is Money Join Law Insider Premium to draft better contracts faster.