Developer Resources Sample Clauses

Developer Resources. The software includes compilers, languages, runtimes, environments, and other resources. These components may be governed by separate agreements and have their own product support policies. A list of these other components is located at xxxxx://xxxxxxx.xxxxxxxxx.xxx.
AutoNDA by SimpleDocs
Developer Resources iCIMS shall provide Partner with access to a sandbox or test environment for the purpose of building an Integration.
Developer Resources. All employees of the Developer shall have adequate knowledge and experience to enable them to perform the duties assigned to them. The Developer certifies that it currently has adequate qualified personnel in its employment to perform the work required under this contract or will be able to obtain adequate qualified personnel from sources other than the Department. On receipt of written notice from the Department detailing supporting factors and evidence, the Developer shall remove from the Project any employee of the Developer who is incompetent or whose conduct becomes detrimental to the work. Unless otherwise specified, the Developer shall furnish all equipment, materials, supplies, and other resources required to perform the work.

Related to Developer Resources

  • Additional Resources The WLSC may establish workgroups that include other department representatives and/or subject matter experts. These subcommittees will conform with rules established by the WLSC.

  • Other Resources Participant shall be responsible for providing such other resources as may be reasonably necessary for connection with the implementation of the HIE, including but not limited to making available such Participant staff members as may be necessary for such purposes.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $289,416 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $0 - OWDA $0 - CDBG $0 - Other $0 SUBTOTAL $289,416 v) OPWC Funds: - Grant $275,000 - Loan $137,500 SUBTOTAL $412,500 TOTAL FINANCIAL RESOURCES $701,916

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Resource Interconnection Service (ER Interconnection Service).

Time is Money Join Law Insider Premium to draft better contracts faster.