Differing Subsurface of Physical Conditions Sample Clauses

Differing Subsurface of Physical Conditions. Contractor shall give prompt written notice to Engineer if any subsurface or physical condition is uncovered or revealed and either i) differs materially from that shown or indicated in the Contract Documents or the technical data or related documents or ii) is of a highly unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work performed at the location. After receipt of Contractor’s written notice, Engineer will promptly review the condition, determine the necessity of obtaining additional exploration or tests, and advise Owner in writing of Engineer’s findings and conclusions. Contractor shall not further disturb such condition or perform any Work in connection therewith until receipt of written order from Engineer to do so. Absent an emergency, any Work performed by Contractor before receiving Engineer’s response will be at the sole expense of the Contractor. The Contract Price and/or the Contract Times may be equitably adjusted to the extent that the existence of such differing subsurface or physical condition causes an increase or decrease in Contractor’s cost of, or time required for, performance of the Work. If Owner and Contractor cannot agree on entitlement to, or the amount or extent of, any adjustment in the Contract Price or Contract Times, or both, a Claim may be made. Provided, however, Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times if i) Contractor knew, or should have known, of the existence of such conditions at the time Contractor entered into the Contract; ii) the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test, or study of the Site required by the Contract Documents to be conducted prior to Contractor’s entering into the Contract; or iii) Contractor failed to give the written notice as required.
AutoNDA by SimpleDocs
Differing Subsurface of Physical Conditions 

Related to Differing Subsurface of Physical Conditions

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • Environmental Conditions A Phase I environmental site assessment (or update of a previous Phase I and or Phase II environmental site assessment) and, with respect to certain Mortgage Loans, a Phase II environmental site assessment (collectively, an “ESA”) meeting ASTM requirements conducted by a reputable environmental consultant in connection with such Mortgage Loan within 12 months prior to its origination date (or an update of a previous ESA was prepared), and such ESA (i) did not identify the existence of recognized environmental conditions (as such term is defined in ASTM E1527-13 or its successor, hereinafter “Environmental Condition”) at the related Mortgaged Property or the need for further investigation, or (ii) if the existence of an Environmental Condition or need for further investigation was indicated in any such ESA, then at least one of the following statements is true: (A) an amount reasonably estimated by a reputable environmental consultant to be sufficient to cover the estimated cost to cure any material noncompliance with applicable Environmental Laws or the Environmental Condition has been escrowed by the related Mortgagor and is held or controlled by the related Mortgagee; (B) if the only Environmental Condition relates to the presence of asbestos-containing materials, radon in indoor air, lead based paint or lead in drinking water, the only recommended action in the ESA is the institution of such a plan, an operations or maintenance plan has been required to be instituted by the related Mortgagor that can reasonably be expected to mitigate the identified risk; (C) the Environmental Condition identified in the related environmental report was remediated or abated in all material respects prior to the date hereof, and, if and as appropriate, a no further action or closure letter was obtained from the applicable governmental regulatory authority (or the environmental issue affecting the related Mortgaged Property was otherwise listed by such governmental authority as “closed” or a reputable environmental consultant has concluded that no further action is required); (D) an environmental policy or a lender’s pollution legal liability insurance policy that covers liability for the identified circumstance or condition was obtained from an insurer rated no less than “A-” (or the equivalent) by Xxxxx’x Investors Service, Inc., S&P Global Ratings, acting through Standard & Poor’s Financial Services LLC, Fitch Ratings, Inc. and/or A.M. Best Company; (E) a party not related to the Mortgagor was identified as the responsible party for such condition or circumstance and such responsible party has financial resources reasonably estimated to be adequate to address the situation; or (F) a party related to the Mortgagor having financial resources reasonably estimated to be adequate to address the situation is required to take action. To the Mortgage Loan Seller’s knowledge, except as set forth in the ESA, there is no Environmental Condition (as such term is defined in ASTM E1527-13 or its successor) at the related Mortgaged Property.

  • Physical Condition Except as disclosed in the Physical Conditions Reports delivered to Lender in connecting with this Loan, to Borrower's knowledge, the Property, including, without limitation, all buildings, improvements, parking facilities, sidewalks, storm drainage systems, roofs, plumbing systems, HVAC systems, fire protection systems, electrical systems, equipment, elevators, exterior sidings and doors, landscaping, irrigation systems and all structural components, are in good condition, order and repair in all material respects; there exists no structural or other material defects or damages in the Property, whether latent or otherwise, and Borrower has not received notice from any insurance company or bonding company of any defects or inadequacies in the Property, or any part thereof, which would adversely affect the insurability of the same or cause the imposition of extraordinary premiums or charges thereon or of any termination or threatened termination of any policy of insurance or bond.

  • Environmental Condition Except as set forth on Schedule 5.12 to the Information Certificate, (a) to each Loan Party’s knowledge, no properties or assets of any Loan Party or any of its Subsidiaries have ever been used by a Loan Party, its Subsidiaries, or by previous owners or operators in the disposal of, or to produce, store, handle, treat, release, or transport, any Hazardous Materials, where such disposal, production, storage, handling, treatment, release or transport was in violation, in any material respect, of any applicable Environmental Law, (b) to each Loan Party’s knowledge, after due inquiry, no Loan Party’s nor any of its Subsidiaries’ properties or assets have ever been designated or identified in any manner pursuant to any environmental protection statute as a Hazardous Materials disposal site, (c) no Loan Party nor any of its Subsidiaries has received notice that a Lien arising under any Environmental Law has attached to any revenues or to any Real Property owned or operated by a Loan Party or its Subsidiaries, and (d) no Loan Party nor any of its Subsidiaries nor any of their respective facilities or operations is subject to any outstanding written order, consent decree, or settlement agreement with any Person relating to any Environmental Law or Environmental Liability that, individually or in the aggregate, could reasonably be expected to result in a Material Adverse Change.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Emergency Medical Condition a medical condition manifesting itself by acute symptoms of sufficient severity (including severe pain) that a prudent layperson, who possesses an average knowledge of health and medicine, could reasonably expect the absence of immediate medical attention to result in the following: a) Placing the health of the individual (or, with respect to a pregnant woman, the health of the woman or her unborn child) in serious jeopardy; b) Serious impairment to bodily functions; or c) Serious dysfunction of any bodily organ or part.

  • Use of Hazardous Materials Tenant shall not cause or permit any Hazardous Materials to be used, stored, discharged, released or disposed of in the Premises or cause any Hazardous Materials to be used, stored, discharged, released or disposed of in, from, under or about, the Property, or any other land or improvements in the vicinity of the Property, excepting only the types and minor quantities of Hazardous Materials which are normally used in connection with Tenant’s permitted use, operation and maintenance of the Premises and then only in strict accordance with all Legal Requirements, including all Environmental Laws (“Permitted Substances”). Tenant shall, at its own expense, procure, maintain in effect and comply with all conditions of any and all permits, licenses, and other governmental and regulatory approvals required for Tenant’s use of Hazardous Materials at the Premises, including, without limitation, discharge of appropriately treated materials or wastes into or through any sanitary sewer serving the Building. Tenant shall in all respects handle, treat, deal with and manage any and all Tenant’s Hazardous Materials in total conformity with all Environmental Laws and prudent industry practices regarding management of such Hazardous Materials. Without limiting the foregoing, if any Tenant’s Hazardous Materials result in contamination of the Building, or any soil or groundwater in, under or about the Property in each case to the extent the presence of same amounts to a violation of any Legal Requirement or poses a threat to human health or safety, Tenant, at its expense, shall promptly take all actions necessary to return the Building and/or the Property, to the condition existing prior to the appearance of the Tenant’s Hazardous Material, subject to Landlord’s right to approve Tenant’s proposed remediation method. On or prior to the Termination Date, Tenant shall cause all Tenant’s Hazardous Materials in, on, under or about the Building to be removed in accordance with and in compliance with all Legal Requirements. Tenant shall promptly notify Landlord and obtain Landlord’s written approval before taking any remedial action in response to the presence of any Tenant’s Hazardous Materials or entering into any settlement agreement, consent decree or other compromise with respect to any claims relating to Tenant’s Hazardous Materials.

  • Environmental Hazards Each Party will be solely responsible at its own expense for the proper handling, storage, transport, treatment, disposal and use of all Hazardous Substances by such Party and its contractors and agents. “Hazardous Substances” includes those substances (i) included within the definition of hazardous substance, hazardous waste, hazardous material, toxic substance, solid waste or pollutant or contaminant under any Applicable Law and (ii) listed by any governmental agency as a hazardous substance.

  • SPECIAL CONDITIONS A submitted appeal must;

  • Hazardous Conditions Whenever the Contractor’s operations create a condition hazardous to traffic or to the public, the Contractor shall provide flagmen and furnish, erect and maintain control devices as are necessary to prevent accidents or damage or injury to the public at Contractor’s expense and without cost to the County. The Contractor shall comply with County directives regarding potential hazards. Emergency lights and traffic cones must also be readily available at all times and must be used in any hazardous condition. Emergency traffic cones must be placed in front of and behind vehicles to warn oncoming traffic. Signs, lights, flags, and other warning and safety devices shall conform to the requirements set forth in Chapter 5 of the current traffic manual, Traffic Control for Construction and Maintenance Work Zones, published by the state of California Department of Transportation. The Contractor shall take proper safety and health precautions to protect the Work, the workers, the public, and the property of others. The Contractor shall also be responsible for all materials delivered and Work performed until completion and acceptance of the entire construction Work, except for any completed unit of construction thereof which theretofore may have been accepted.