Discharge of Initial Development Water Sample Clauses

Discharge of Initial Development Water. Drilling fluids and initial development water produced during open-ended airlifting and swab- airlift operations shall be discharged to a sanitary sewer inlet located approximately 400 feet from the well site located in Wilde Court as designated in the Plan Sheets. Before fluids may be discharged to the detention basin for disposal, solids in the fluids shall be removed using settlement tanks. A minimum of two tanks (not including circulation tanks) shall be connected in series, with the outfall of each tank near the top of the tank. Each tank shall have a minimum capacity of 20,000 gallons, and a minimum surface area of 200 square feet. The Contractor shall discharge fluids via pipeline to the sanitary sewer inlet utilizing a fitted sewer manhole cover. The maximum discharge rate to the sanitary sewer is 300 gallons per minute and is subject to change at the discretion of the Engineer or Owner. The Contractor shall install a totalizing flow meter on the outflow to the sanitary sewer to monitor instantaneous flow volume and daily discharged volume. The discharge assembly shall also have a valve to regulate flow to the sanitary sewer. The Contractor shall specifically ensure that the fluids do not backup or damage the adjacent properties.

Related to Discharge of Initial Development Water

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Commercial Operation Date 6.4.1 The SPV shall ensure that the Project Commercial Operation Date is achieved on or prior to the Scheduled Commercial Operation Date. The SPV shall provide a written notice to MSEDCL at least 30 (thirty) days in advance intimating MSEDCL of the proposed date on which the Commercial Operation Date of a Unit or the Project is proposed to be achieved. 6.4.2 If the Commercial Operation Date for the Units having a capacity equivalent to at least 75% (seventy five percent) of the Contracted Capacity is achieved before the Scheduled Commercial Operation Date, then all Units in respect of which the Commercial Operation Date has been achieved prior to the Scheduled Commercial Operation Date would be eligible for incentives as follows: (a) the Unit(s) injecting energy at 11 kV /22 kV shall be given an incentive of Rs. 0.25/ kWh; and (b) the Unit(s) injecting energy at 33 kV shall be given an incentive of Rs. 0.15/ kWh, for the power sold to MSEDCL for the first 3 (three) years from the Commercial Operation Date. To receive such incentives from MSAPL, which shall be over and above the Tariff, the SPV shall follow the process agreed to by the SPV under the Implementation Agreement. 6.4.3 It is hereby clarified that the aforementioned incentive shall not be available: (i) in respect of any Unit if the Commercial Operation Date for such Unit has not been achieved prior to the Scheduled Commercial Operation Date; and (ii) if the aggregate capacity of the Units for which the Commercial Operation Date has been achieved prior to Scheduled Commercial Operation Date is less than 75% (seventy five percent) of the Contracted Capacity. 6.4.4 In the event that Commercial Operation Date for any of the Units is achieved after the Scheduled Commercial Operation Date, the SPV shall be liable to pay Liquidated Damages as per the provisions set out below. 6.4.5 Without prejudice to any other rights of MSEDCL under this PPA, in case one or more Units of the SPV are unable to achieve Commercial Operation Date within a period of 2 (two) months from the Scheduled Commercial Operation Date, the capacity of such Units shall be annulled, and the Contracted Capacity shall be reduced to that extent. For Illustration: The Project has a Contracted Capacity of 100 MW and comprises of 10 Units of 10 MW each. If at the end of the aforementioned period of 14 (fourteen) months from the Effective Date, the SPV has achieved Commissioning for only 8 out of 10 Units, then the Contracted Capacity of the Project will stand reduced for the capacity of the 2 Units which have not been Commissioned, i.e. the Contracted Capacity will be 80 (100 (original Contracted Capacity)) – 10 (capacity of each Unit)*2 (number of Units not Commissioned).

  • Staff Development As part of their induction, new staff will be made aware of this policy and will be asked to ensure compliance with its procedures at all times.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Staff Development Leave (a) An employee will be granted leave without loss of pay, at their basic rate of pay, to take courses (including related examinations) or attend conferences, conventions, seminars, workshops, symposiums or similar out-of-service programs, at the request of the Employer. The amount of pay received by an employee will not exceed the full-time daily hours of work as outlined in Clause 14.2 (Hours of Work). When such leave is granted, the Employer will bear the full cost, including tuition fees, entrance or registration fees, laboratory fees, and course-related books. The Employer will also reimburse the employee for approved travelling, subsistence, and other legitimate, applicable expenses. (b) An employee may be granted leave without pay, with pay, or leave with partial pay, to take work related courses in which the employee wishes to enrol to acquire the skills necessary to enhance opportunities. (c) Approval of requests will be given reasonable consideration and leaves pursuant to this article will be administered in a reasonable manner. (d) Should the employee noted above terminate their employment for any reason during the six month period following completion of the above-noted leave, the employee will reimburse the Employer for all expenses incurred by the Employer (i.e. tuition fees, entrance or registration fees, laboratory fees, and course-required books) on a proportionate basis.

  • Career Development The City and the Union agree that employee career growth can be beneficial to both the City and the affected employee. As such, consistent with training needs identified by the City and the financial resources appropriated therefore by the City, the City shall provide educational and training opportunities for employee career growth. Each employee shall be responsible for utilizing those training and educational opportunities made available by the City or other institutions for the self- development effort needed to achieve personal career goals.

  • Gold Open Access Articles May be shared according to the author-selected end-user license and should contain a CrossMark logo, the end user license, and a DOI link to the formal publication on ScienceDirect. Please refer to Elsevier's posting policy for further information.

  • Commercial Operation (i) On or before December 31, 2021, Interconnection Customer must demonstrate commercial operation of all generating units. Demonstrating commercial operation includes achieving Initial Operation in accordance with Section 1.4 of Appendix 2 to this ISA and making commercial sales or use of energy, as well as, if applicable, obtaining capacity qualification in accordance with the requirements of the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region.

  • OFFICE OF MANAGEMENT AND BUDGET (OMB) AUDIT REQUIREMENTS The parties shall comply with the requirements of the Single Audit Act of 1984, P.L. 98-502, ensuring that the single audit report includes the coverage stipulated in 2 CFR 200.