Drainage Memorandum Sample Clauses

Drainage Memorandum. The Consultant shall: • Perform field review of the Project area. • Review previous drainage studies and improvement plans in the area. • Review the impact of proposed improvements on existing drainage conditions. If needed, identify drainage facilities or grading (dikes or xxxxxx) needed to mitigate those impacts. This will not include hydrological modeling to quantify flows. • Make recommendations to the City for any additional studies that may be needed to address existing or potential flood damage. Additional studies, if warranted and approved by the City, will be provided under Supplemental Services. • Prepare and submit a brief Drainage Memorandum for review. Address any comments in an Addendum and incorporate the memorandum and subsequent addenda into the Preliminary Design Report.
AutoNDA by SimpleDocs

Related to Drainage Memorandum

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • No Reverse Engineering You may not, and you agree not to or enable others to, copy (except as expressly permitted by this License or by the Usage Rules if they are applicable to you), decompile, reverse engineer, disassemble, attempt to derive the source code of, decrypt, modify, or create derivative works of the Apple Software or any services provided by the Apple Software, or any part thereof (except as and only to the extent any foregoing restriction is prohibited by applicable law or to the extent as may be permitted by the licensing terms governing use of open-sourced components included with the Apple Software).

  • Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.

  • Adverse Weather Shall be only weather that satisfies all of the following conditions: (1) unusually severe precipitation, sleet, snow, hail, or extreme temperature or air conditions in excess of the norm for the location and time of year it occurred based on the closest weather station data averaged over the past five years, (2) that is unanticipated and would cause unsafe work conditions and/or is unsuitable for scheduled work that should not be performed during inclement weather (i.e., exterior finishes), and (3) at the Project.

  • More Information For more specific information about the terms and conditions of the ICA or DCA program, please see the ICA Disclosure Booklet or DCA Disclosure Booklet (as applicable) available from IAR or on xxx.xxxxxxxxxxxx.xxx.xxx/xxxxxxxxxxx.

  • Utility Easements There is hereby reserved for the use and benefit of the Association and all Owners, non-exclusive easements within the Common Areas for the location, installation and maintenance of utilities and drainage facilities of convenience or necessity as may be requested or required by the Association or any Owner provided that the grant thereof does not unreasonably interfere with the normal operation, improvement, and use of the Common Area and the buildings constructed within the Center, and no affirmative monetary obligation is imposed upon the Owners (other than the Owner benefiting from such easement). The Declarant (and the Board where there no longer is a Declarant) shall have the authority to grant easements or rights-of-way for utilities over the Common Areas as necessary to serve the Common Areas and/or the Parcels. The Owner of any Parcel and any of his Occupants or licensees shall have the right at all reasonable times to enter upon the land subject to said easements and to install, maintain, operate, repair and service utilities and drainage facilities thereon for the use and benefit of his Parcel; provided, however, any such Person shall restore said land, at his own expense, as nearly as practicable, to the same condition as existed prior to such entry and shall comply with the provisions of Section 11.6. The Owner of any Parcel shall have the right to assign the benefit and use of any such easement to any public or private utility company, agency or district for the purpose of installing, operating, repairing, servicing and maintaining utilities or drainage facilities and enforcing the easement rights. For purposes hereof, "utilities" shall include electricity, gas mains and lines, water distribution lines, storm water sewers, sanitary sewers, telephone, fiberoptic, cable TV, and telegraph cables and lines, and other similar or related facilities commonly regarded as utilities. All storm drains, utility lines, transformers and meters shall be maintained under the terms of this Declaration in a safe and good working condition by the party responsible therefor. No grantee of a utility easement shall in the use, construction, reconstruction, operation, maintenance or repair of any storm drains, utility lines, transformers and meters in any way interfere, obstruct or delay the business of the grantor of said easement or any other Owner or Occupant, or the public access to and from said business or interfere, obstruct or delay in any way the receiving of merchandise by said grantor or any Owner or Occupant. EXHIBIT F -35- PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!