DRAINAGE/STORMWATER MANAGEMENT Sample Clauses

DRAINAGE/STORMWATER MANAGEMENT. A. It shall be OWNER'S sole responsibility to obtain the necessary drainage/stormwater management permits from the South Florida Water Management District (SFWMD). In no event shall COUNTY bear the responsibility for aiding OWNER in obtaining permits from the SFWMD or funding the improvements necessary to develop the PUD.
AutoNDA by SimpleDocs

Related to DRAINAGE/STORMWATER MANAGEMENT

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. SCHEDULE B: ELIGIBLE EXPENDITURES Eligible Expenditures will be limited to the following:

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

Time is Money Join Law Insider Premium to draft better contracts faster.