Earthwork in Filling Sample Clauses

Earthwork in Filling. Material All fill material, whether out of surplus material from excavations or brought from any other source outside shall be subject to prior approval of the Engineer-In-Charge. The source of outside material shall also be approved by the Engineer-In-Charge. All fill material shall be free from vegetable refuse and other organic matter, marine clay, black cotton soil, injurious salt and other material considered unsuitable by the Engineer- In-Charge. All large clods shall be broken. Where the material is mostly rock, boulders shall be broken into pieces not larger than 15 cm. size, mixed with properly graded fine material like murum etc. Filling over areas (site gradation) / roads /pathways Any filling work shall be started by the Contractor only after recording existing ground levels jointly with the Engineer-In-Charge. Formation width and side slopes shall be as per drawings or as directed by the Engineer- In-Charge. All banks shall be thrown up in layers of not more than 200 mm. in depth over the whole width between the surfaces of side slopes slightly concave in section, so as to retain water for subsidence. When on side long ground, the whole area of the bank of the slope shall be benched out or stepped so as to prevent material from slipping. Each layer of filling shall be watered, rammed and thoroughly consolidated to the satisfaction of the Engineer-In-Charge and to obtain the density stipulated in the item. Compaction shall be done by mechanical compaction machines unless otherwise allowed by the Engineer-In-Charge. The normal allowance for subsidence or settlement shall be 5 cm. per 30 cm. depth of bank. This may be increased or decreased by the Engineer-In- Charge depending on the nature of the filling material used. Necessary field and laboratory tests shall be carried out by the Contractor to demonstrate that the specified density at moisture content is obtained in the fill at different stages of filling and after the fill to the entire height is completed, if so specifically called for. The Contractor shall protect the fill from being washed away by rain or damaged in any other way. Should any slip occur, the Contractor shall remove the affected material and make good the same at his own cost. If rock obtained from excavation (which may be used for filling and levelling to indicated grades without further breaking) is permitted for filling by the Engineer-In-Charge, filling shall be done in layers not exceeding 50cm approximately. After roc...
AutoNDA by SimpleDocs

Related to Earthwork in Filling

  • STOP WORK (a) SELLER shall stop Work for up to ninety (90) days in accordance with any written notice received from LOCKHEED XXXXXX, or for such longer period of time as the parties may agree and shall take all reasonable steps to minimize the incurrence of costs allocable to the Work during the period of Work stoppage.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • FABRICATION Making up data or results and recording or reporting them.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitation, either by competitive bidding or negotiation, made by the Contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential Subcontractor or supplier shall be notified by the Contractor of the Contractor’s obligations under this Agreement and the Regulations relative to non-discrimination on the grounds of race, color, or national origin.

  • Contract Work The provision of goods and services identified in the Contract constitute the contract work (Contract Work). Contractor shall perform the Contract Work pursuant to the terms of the Contract. Contractor shall furnish all labor, materials, equipment, tools, transportation, services, appliances, and appurtenances for the Contract Work in strict conformity with this Contract, within the time-period prescribed by the City.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Stop Work Orders A. The JBE may, at any time, by Notice to Contractor, require Contractor to stop all or any part of the Services for a period up to ninety (90) days after the Notice is delivered to Contractor, and for any further period to which the parties may agree (“Stop Work Order”). The Stop Work Order shall be specifically identified as such and shall indicate it is issued under this provision. Upon receipt of the Stop Work Order, Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the Services covered by the Stop Work Order during the period of stoppage. Within ninety (90) days after a Stop Work Order is delivered to Contractor, or within any extension of that period to which the parties shall have agreed, the JBE shall either (i) cancel the Stop Work Order; or (ii) terminate the Services covered by the Stop Work Order as provided for in this Agreement.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.