East Side Road Project Sample Clauses

East Side Road Project. This Agreement shall terminate on:
AutoNDA by SimpleDocs

Related to East Side Road Project

  • Trunk Side A Central Office Switch connection that is capable of, and has been programmed to treat the circuit as, connecting to another switching entity, for example, to another carrier’s network. Trunk side connections offer those transmission and signaling features appropriate for the connection of switching entities and cannot be used for the direct connection of ordinary telephone station sets.

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • Porcupine Site Highway 11

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Wire Unbundled DS1 Digital Loop This is a designed 4-wire Loop that is provisioned according to industry standards for DS1 or Primary Rate ISDN services and will come standard with a test point, OC, and a DLR. A DS1 Loop may be provisioned over a variety of loop transmission technologies including copper, HDSL-based technology or fiber optic transport systems. It will include a 4-Wire DS1 Network Interface at the End User’s location.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Line Side An End Office connection that provides transmission, switching and optional features suitable for Customer connection to the public switched network, including loop start supervision, ground start supervision and signaling for BRI- ISDN service.

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

Time is Money Join Law Insider Premium to draft better contracts faster.