Electrical Design Capacity Sample Clauses

Electrical Design Capacity. The following parameters constitute Building Standard electrical design capacity: (i) all general purpose lighting shall be 120 volts and all emergency lighting and night lighting shall be 277 volts; (ii) the connected electrical load of all electrical equipment serving the Premises shall not exceed an average of 4.0 wattx xxx RSF; (iii) no single item or component of electrical equipment shall have a rated electrical load greater than 0.5 kilowatt or require voltage other than 120 volts, single phase (or 110 volts, depending on available service in the Building); and (iv) no electrical equipment shall exceed the safe and lawful capacity of the existing electrical circuit(s) and facilities serving the Premises. Any requirements, services or equipment in excess or contravention of any of the foregoing parameters (or any combination thereof) shall constitute ABS electrical services subject to Landlord's approval and Tenant's compliance with the other applicable provisions of the Lease, specifically including PARAGRAPH 8(d) thereof. However, the cost of purchasing and installing any ABS electrical equipment approved by Landlord (including submeters) shall be paid at Tenant's expense, but may be paid from the Construction Allowance (if any) as part of the Work.
AutoNDA by SimpleDocs
Electrical Design Capacity. The following parameters constitute building standard electrical design capacity: (i) the total connected electrical load of all electrical equipment serving the Premises shall not exceed an average of 4.0 xxxxx multiplied by the Rentable Square Footage of the Premises delivered through the electrical riser to the electrical room on the floor where the Premises are located; (ii) the connected electrical load for lighting shall not exceed an average of 1.5 xxxxx multiplied by the Rentable Square Footage of the Premises; (iii) emergency power shall be limited to egress lighting only and at Landlord’s option shall be provided by Tenant’s battery backup fixtures or Landlord’s emergency power system; and (iv) no electrical equipment shall exceed the safe and lawful capacity of the existing electrical circuit(s) and facilities serving the Premises. Any requirements, services or equipment in excess or contravention of the foregoing parameters (or any combination thereof) shall constitute above building standard electrical services subject to Landlord’s approval and Tenant’s compliance with the other applicable provisions of the Lease. However, the cost of purchasing and installing any above building standard electrical equipment approved by Landlord (including submeters) shall be paid at Tenant’s expense.
Electrical Design Capacity. The following parameters constitute building standard electrical design capacity: (i) the total connected electrical load of all electrical equipment serving the Premises (excluding Building mechanical systems and other Building equipment) shall not exceed an average of approximately 7.0 xxxxx multiplied by the usable square footage of the Premises, which is hereby deemed to be 34,380 usable square feet, delivered through the electrical riser to the electrical room(s) on the floor where the Premises are located; (ii) in addition to the approximate 7.0 xxxxx stated above, the connected electrical load for lighting shall not exceed an average of approximately 3.0 xxxxx multiplied by the usable square footage of the Premises; (iii) emergency power shall be limited to egress lighting only and at Landlord’s option shall be provided by Tenant’s battery backup fixtures or Landlord’s emergency power system; and (iv) no electrical equipment shall exceed the safe and lawful capacity of the existing electrical circuit(s) and facilities serving the Premises which capacity is hereby deemed to be no less than 7.0 xxxxx multiplied by the usable square footage of the Premises. Any requirements, services or equipment in excess or contravention of the foregoing parameters (or any combination thereof) shall constitute above building standard electrical services subject to Landlord’s approval and Tenant’s compliance with the other applicable provisions of the Lease. However, the cost of purchasing and installing any above building standard electrical equipment approved by Landlord (including submeters) shall be paid at Tenant’s expense from the Reimbursement Allowance or out-of-pocket if said allowance has been fully utilized by Tenant.
Electrical Design Capacity. The cost of purchasing and installing all electrical equipment (including meters or submeters), if not already installed, shall be paid at Tenant’s expense, but may be paid from the Construction Allowance as part of the Work.
Electrical Design Capacity. The following parameters constitute building standard electrical design capacity: (i) the total connected electrical load of all electrical equipment serving the Premises (excluding Building mechanical systems and other Building equipment) shall not exceed an average of approximately 7.0 xxxxx multiplied by the usable square footage of the Premises, which is hereby deemed to be 34,380 usable square feet, delivered through the electrical riser to the electrical room(s) on the floor where the Premises are located; (ii) in addition to the approximate 7.0 xxxxx stated above, the connected electrical load for lighting shall not exceed an average of approximately 3.0 xxxxx multiplied by the usable square footage of the Premises; (iii) emergency power shall be limited to egress lighting only and at Landlord’s option shall be provided by Tenant’s battery backup fixtures or Landlord’s emergency power system; and (iv) no electrical equipment shall exceed the safe and lawful capacity of the existing B-iii

Related to Electrical Design Capacity

  • Electrical Provide drawings for the following systems:

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Building Systems The term “Building Systems” shall mean collectively the mechanical, electrical, plumbing, sanitary, sprinkler, heating, ventilation and air conditioning, security, life safety, elevator and other service systems or facilities of the Building and the finished ceiling and Building standard lighting fixtures in the Leased Premises, that are excluding any Premises Fixtures.

  • HVAC A. Heating, ventilating and air conditioning equipment will be provided with sufficient capacity to accommodate a maximum population density of one (1) person per one hundred fifty (150) square feet of useable floor area served, and a combined lighting and standard electrical load of 3.0 xxxxx per square foot of useable floor area. In the event Tenant introduces into the Premises personnel or equipment which overloads the system’s ability to adequately perform its proper functions, Landlord shall so notify Tenant in writing and supplementary system(s) may be required and installed by Landlord at Tenant’s expense, if within fifteen (15) days Tenant has not modified its use so as not to cause such overload. Operating criteria of the basic system shall not be less than the following:

  • Rooftop Equipment Provided that Tenant complies with the terms of ----------------- this Section, Tenant may, at its risk and expense, install a satellite dish and related communications equipment and wiring (collectively, the "Rooftop ------- Equipment") on the roof of the Building at a location approved by Landlord, --------- which equipment may be used solely by Tenant and its Permitted Transferees or Permitted Sublessees. Before installing the Rooftop Equipment, Tenant shall submit to Landlord for its approval (which approval shall be in Landlord's sole discretion) plans and specifications which (a) specify in detail the design, location, size, and, in the case of a satellite dish, frequency of the Rooftop Equipment and (b) are sufficiently detailed to allow for the installation of the Rooftop Equipment in a good and workmanlike manner and in accordance with all Laws (the "Legal Requirements"). If Landlord approves of such plans, Tenant ------------------ shall install (in a good and workmanlike manner), maintain and use the Rooftop Equipment in accordance with all Legal Requirements and shall obtain all consents and permits required for the installation and operation thereof; copies of all such permits and evidence of such consents must be submitted to Landlord before Tenant begins to install the Rooftop Equipment. Tenant shall thereafter maintain all permits necessary for the maintenance and operation of the Rooftop Equipment while it is on the Building and operate and maintain the Rooftop Equipment in such a manner so as not to unreasonably interfere with any other satellite, antennae, or other transmission facility on the Building's roof or in the Building. Landlord may require that Tenant screen the Rooftop Equipment with a parapet or other screening device acceptable to Landlord. Tenant shall maintain the Rooftop Equipment and screening device in good repair and condition. Tenant shall, at its risk and expense, remove the Rooftop Equipment (including all wiring related thereto), within five days after the occurrence of any of the following events: (1) the termination of Tenant's right to possess the Premises; (2) the termination of the Lease; (3) the expiration of the Term; or (4)

  • Base Building “Base Building” means the Building Structure and Mechanical Systems, collectively, defined as follows:

  • Power and Capacity Each Shareholder has the power, authority and capacity to enter into this Agreement and to consummate the transactions contemplated hereby. This Agreement constitutes each Shareholders’s valid, legal and binding obligation and is enforceable against such Shareholder in accordance with its terms, subject, however, as to enforcement, to bankruptcy, insolvency, fraudulent transfer, moratorium and similar laws of general applicability relating to or affecting creditors’ rights; SUNO — Corporate Status and Capacity

  • Interconnection 2.1.10 Startup Testing and Commissioning

Time is Money Join Law Insider Premium to draft better contracts faster.