Emergency Power System Sample Clauses

Emergency Power System. 1. Provide and install a pad mounted diesel generator set in waterproof enclosure and storage fuel tank sized for minimum 1 day, eight (8) hours, continuous operation at full load. Generator shall be rated for 277/480 volt service. Designed for harmonic non-linear loads. 2. Generator shall serve an emergency distribution panel through a mechanically held, open transition, electrically operated automatic transfer switches. 3. The emergency distribution system shall serve fire pump, fire jockey pump, smoke exhaust fans, elevators, fire alarm system, stairwell, egress, exit lighting. 4. System shall include a remote generator status panel with start-stop controls and load transfer controls tied to the BMS system.
AutoNDA by SimpleDocs
Emergency Power System. Subject to the terms and conditions of the Master Lease, Subtenant shall have the right, with Master Landlord’s consent pursuant to the Master Lease, to connect certain equipment into the Master Landlord’s emergency power generator and uninterrupted power supply systems (“Emergency Power System”). Subtenant shall pay directly to the Master Landlord all costs and expenses related to the Subtenant’s actual usage of the Emergency Power System. In the event that Subtenant is not permitted to pay such costs directly, then Tenant shall pay the costs and expenses of the Emergency Power System and the Subtenant shall promptly reimburse the Tenant for Tenant’s actual costs incurred with respect to the Subleased Premises; provided that Tenant submits reasonable supporting documentation regarding such costs.
Emergency Power System. (a) The Building is equipped with an emergency power generator and an uninterrupted power supply system (collectively, the “Emergency Power System”). At any time during the Term, Tenant shall have the right to elect to connect certain equipment at the Premises to the Emergency Power System. The foregoing notwithstanding, prior to connecting any equipment to the Emergency Power System, Tenant shall provide Landlord with all equipment plans and specifications relating to the loads that would be imposed upon the Emergency Power System, and Landlord shall have the right to deny Tenant use of the Emergency Power System to the extent that Landlord determines that Tenant’s usage might or would exceed the usage allotment that Landlord has determined for the Premises. If Landlord approves of Tenant’s use of the Emergency Power System, at Landlord’s election, either Landlord’s contractor will connect Tenant’s approved equipment to the Emergency Power System or Tenant’s contractor will connect Tenant’s approved equipment to the Emergency Power System. (b) Landlord will operate, maintain, repair and make any capital repairs or replacements to the Emergency Power System. (c) (i) If Tenant elects to connect any equipment to the Emergency Power System, Tenant shall pay to Landlord Tenant’s EPS Share of all costs and expenses incurred by Landlord on or after the date on which such equipment is connected to the Emergency Power System in connection with the operation, maintenance, repair and replacement of the Emergency Power System (“EPS Costs”). “Tenant’s EPS Share” means a fraction, the numerator of which shall be the potential load (as reasonably determined by Landlord) of Tenant’s equipment that is connected to the Emergency Power System and the denominator of which shall be the potential load (as reasonably determined by Landlord) of all equipment that tenants of the Building from time to time elect to have connected to the Emergency Power System.
Emergency Power System. Emergency power systems are provided and maintained by Tenant. At Landlord’s discretion it is Tenant’s sole responsibility to remove all items related to this system upon vacating the premises. Tenant generators shall meet the following requirements: · Generator tanks are sub-base mounted and provided as a complete package without grade or in-grade fuel tank · Generator is provided in a weather rated Nema 3R enclosure and be UL2200 compliant · Generators to be standard sound attenuated enclosures rated to reduce noise to 75 db at 23’ from enclosure
Emergency Power System. (a) The Building is equipped with an emergency power generator and an uninterrupted power supply system (collectively, the “Emergency Power System”). At any time during the Term, Tenant shall have the right to elect to connect certain equipment at the Premises to the Emergency Power System. Prior to connecting any equipment to the Emergency Power System, Tenant shall provide Landlord with all equipment plans and specifications relating to the loads that would be imposed upon the Emergency Power System (the “EPS Plans”). Landlord shall have the right to deny Tenant use of the Emergency Power System to the extent that Landlord determines that Tenant’s usage might or would exceed Tenant’s EPS Share (hereinafter
Emergency Power System. An emergency power system will be provided in accordance with the requirements of the Ontario Building Code and any applicable Provincial and Municipal Codes and Regulations. Installation of the emergency system will be in accordance with CSA C282-00, Emergency Electrical Power Supply for Buildings. A base building life safety generator will be installed in the penthouse for all base building life safety needs. A separate 500 kW Tenant generator will be installed in the penthouse complete with automatic transfer switch and Tenant emergency distribution panel. Distribution from the tenant generator located in the penthouse to the Tenant floor is the responsibility of the Tenant. A separate Automatic Transfer Switch connected to the base building generator will be provided for Tenant’s standby power system. The tenant emergency power distribution will be capable of providing up to 50 kVA of UPS loads plus cooling equipment associated with the IT loads with a 25% growth factor. 6th Floor 1.00 Standard base building finishes to be completed N N/A Shopify confirmed work is to be completed per Base Building specification

Related to Emergency Power System

  • Emergency Access Landlord shall have the right to enter the Premises at any time without notice in the event of an emergency.

  • Emergency/Declared Disaster Requirements In the event of an emergency or if Orange County is declared a disaster area by the County, state or federal government, this Contract may be subjected to unusual usage. The Contractor shall service the County during such an emergency or declared disaster under the same terms and conditions that apply during non-emergency/disaster conditions. The pricing quoted by the Contractor shall apply to serving the County’s needs regardless of the circumstances. If the Contractor is unable to supply the goods/services under the terms of the Contract, then the Contractor shall provide proof of such disruption and a copy of the invoice for the goods/services from the Contractor’s supplier(s). Additional profit margin as a result of supplying goods/services during an emergency or a declared disaster shall not be permitted. In the event of an emergency or declared disaster, emergency purchase order numbers will be assigned. All applicable invoices from the Contractor shall show both the emergency purchase order number and the Contract number.

  • Emergency Work Authorizations The State, at its sole discretion, may accept the Engineer's signature on a faxed copy of the work authorization as satisfying the requirements for executing the work authorization, provided that the signed original is received by the State within five business days from the date on the faxed copy.

  • Emergency Generator 1) During the Term as it applies to the 9449 Expansion Space, as extended from time to time, Tenant shall have the right to install a supplemental emergency generator (the “Generator”) to provide emergency additional electrical capacity to the 9449 Building. The Generator shall be placed at a location at the 9449 Building designated by Tenant and reasonably approved by Landlord. Notwithstanding the foregoing, Tenant’s right to install the Generator shall be subject to: (i) Landlord’s reasonable approval of the manner in which the Generator is installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator; and (ii) the covenants, conditions and restrictions of record applicable to the Project, architectural review and any necessary approval by the local municipality and county governments or agencies having authority and jurisdiction over such matters. Landlord shall have the right to require Tenant to provide a reasonably acceptable enclosure (e.g. wood fencing and landscaping) to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the 9449 Building and Project. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory permits and approvals and for the cost of installing, operating, maintaining, repairing and removing the Generator. Tenant shall also be responsible for the cost of all utilities consumed and utility connections required in the operation of the Generator. 2) Tenant shall be responsible for assuring that the installation, maintenance, repair, operation and removal of the Generator does not damage the 9449 Building or Project and Tenant shall be responsible for any damages caused thereby. For avoidance of doubt, the installation, maintenance, operation, repair or removal of the Generator shall be subject to the indemnity provisions set forth in Section 10.3 of the Lease. 3) Tenant shall be responsible for the installation, operation, repair, cleanliness, maintenance and removal of the Generator and appurtenances, all of which shall remain the personal property of Tenant and shall be removed by Tenant at its own expense as of the 9449 Extended Expiration Date or any earlier expiration or termination of Tenant’s right to possession of the 9449 Expansion Space in accordance with the Lease and this Amendment. Tenant shall repair any damage caused by such removal, including the patching of any holes to match, as closely as possible, the color surrounding the area where the Generator and appurtenances were attached. Such maintenance and operation shall be performed in a manner to avoid any unreasonable interference with any other tenants or Landlord. Tenant agrees to maintain the Generator, including without limitation, any enclosure installed around the Generator, in good condition and repair. Tenant shall be responsible for performing any maintenance and improvements to any enclosure surrounding the Generator so as to keep such enclosure in good condition. 4) Tenant, subject to the reasonable rules and regulations enacted by Landlord, shall have unlimited access to the Generator and its surrounding area for the purpose of installing, operating, repairing, maintaining, using and removing the Generator. 5) Tenant shall only test the Generator before or after normal business hours. 6) Notwithstanding anything in this Amendment or the Lease to the contrary, Tenant may use the Generator for its intended purpose as and when needed (as reasonably determined by Tenant), without any restriction or hindrance from Landlord or any other tenant, subject only to applicable Laws and unreasonable disturbances to other tenants in the Project.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Emergency Procedures All residents and guests are required to exit the building during emergencies that require evacuation and follow instructions given by authorized University emergency personnel (e.g., Security Services, Emergency Response Wardens and Building Emergency Captains). Residents and guests FIRE PROCEDURES AND FIRE ALARMS: All residents and guest(s) are required to exit the residences at the sound of a fire alarm. In the event of fire, residents and guest(s) are required to follow instruction given by Fire Services personnel.

  • Emergency Precautions Forest Service may require the necessary shutting down of equipment on portions of Purchaser’s Operations, as specified by the emergency fire precautions schedule of C7.22. Under such conditions, after Purchaser ceases active opera- tions, Purchaser shall release for hire by Forest Service, if needed, Purchaser’s shutdown equipment for fire standby on Sale Area or other areas of Purchaser’s Operations and personnel for fire standby or fire patrol, when such personnel and equipment are not needed by Purchaser for other fire fighting or protection from fire. Equipment shall be paid for at fire fighting equipment rates common

  • Xxxxx Disaster Protection In accordance with the requirements of the Flood Disaster Protection Act of 1973 (42 U.S.C. 4001), the Subrecipient shall assure that for activities located in an area identified by the Federal Emergency Management Agency (FEMA) as having special flood hazards, flood insurance under the National Flood Insurance Program is obtained and maintained as a condition of financial assistance for acquisition or construction purposes (including rehabilitation).

  • Contingency Planning The Official Agency in conjunction with the Authority shall ensure that there are contingency plans in place at appropriate levels for dealing with food related crises and incidents. The contingency plan shall be in line with Article 115 of Regulation (EU) 2017/625 and include arrangements for activation of the plan, establishment of a crisis team, communication and information, out of hours contacts and on call services. As part of these plans, the Official Agency will provide the Authority with contact points for both office hours and out of office hours contact for emergency and crisis situations. The Official Agency shall facilitate training of personnel in the operation and exercise of the contingency plans. Periodic review of the plans shall take place in consultation with the Authority. The Official Agency shall implement the agreed Inter-Agency Protocol for the Management of a Food Crisis and guidance on Management of Outbreaks of Foodborne Illness as per Section 1.19.

  • Emergency Work Employees who are required to report for emergency work on non- workdays, or outside of their regular hours of work on a scheduled workday or on holidays which they are entitled to have off, shall be paid overtime compensation for the actual work time and for travel time in connection therewith, but such travel time shall not exceed one-half (1/2) hour.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!