Electricity Delivery Point Sample Clauses

Electricity Delivery Point. The Supplier shall deliver, and the Purchaser shall accept and take, the Peak Tolling Energy and Additional Tolling Energy, as applicable, and all other electrical energy produced from the Power Plant in accordance with this MOU at the point where the conductors of the two 230kV lines owned by Hydro-Québec TransÉnergie (the “Transmission Provider”) are connected to the insulators of the dead end structure of the step-up terminal substation belonging to the Supplier (the “Electricity Delivery Point”);
AutoNDA by SimpleDocs

Related to Electricity Delivery Point

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Electricity 14.01 Tenant shall obtain electricity for the Demised Premises on a direct meter basis, Tenant shall be responsible for and pay to the applicable utility all charges for electricity as measured by such meter. Landlord shall not in any way be liable or responsible to Tenant for any loss or damage or expense which Tenant may sustain or incur if either the quantity or character of electric service is changed or is no longer available or suitable for Tenant’s requirements. Any additional riser or risers to supply Tenant’s electrical requirements, upon written request to Tenant, will be installed by Landlord, at the sole cost and expense of Tenant, unless, in Landlord’s reasonable judgment, the same will cause permanent damage or injury to the Building or the Demised Premises or cause or create a dangerous or hazardous condition or interfere with or disturb other tenants or occupants. In addition to the installation of such riser or risers, Landlord will also at the sole cost and expense of Tenant, install all other equipment proper and necessary in connection therewith subject to the aforesaid terms and conditions. Tenant covenants and agrees that at all times its use of electric current shall never exceed the capacity of the feeders to the Building or the risers or wiring installation which Landlord represents is sufficient for ordinary office use. It is further covenanted and agreed by the Tenant that all the aforesaid costs and expenses are chargeable and collectible as Additional Rent and shall be paid by the Tenant to the Landlord within ten (10) days after the rendering of any xxxx or statement to the Tenant therefor. Tenant shall make no alterations or additions to the electric equipment and/or appliances without the prior written consent of Landlord in each instance, which consent shall not be unreasonably withheld, conditioned or delayed. Notwithstanding anything to the contrary herein, should electric service be interrupted for a period of more than five (5) consecutive business days through the sole fault of Landlord so as to prevent Tenant from using at least seventy-five (75%) percent of the Demised Premises, Fixed Rent shall xxxxx until such service resumes and Tenant is able to resume the use of at least seventy-five (75%) percent of the Demised Premises. Should such service interruption prevent Tenant from using at least seventy-five (75%) of the Demised Premises for more than sixty (60) days and be due to the sole fault of Landlord, Tenant shall have the right to terminate this Lease by giving written notice to Landlord no later than the seventieth (70th) consecutive day and vacating no later than the ninetieth (90th) consecutive day. TIME BEING OF THE ESSENCE for Tenant as to both dates.

  • Receipt Points The Points of Receipt are listed in Appendix 2.

  • DELIVERY PRESSURE Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.