Energy Monitoring Sample Clauses

Energy Monitoring. Energy monitoring services shall be performed by the Qualified Provider as described in this Guarantee. The Guarantee is void if the Owner ceases paying the Energy Monitoring Fees identified below. The annual Energy Monitoring Fees shall be paid semi-annually in advance. The Owner has the right to request that the Qualified Provider change the scope of this Guarantee at the end of each Current Year to reduce monitoring/reporting labor and its associated costs.
AutoNDA by SimpleDocs
Energy Monitoring. Energy monitoring services shall be performed by the Provider as described in this Guarantee. The Guarantee is void if the Owner ceases paying the Energy Monitoring fees identified below. The annual Energy Monitoring fees are shown below and shall be paid annually in advance. The Owner agrees to maintain the physical plant and all existing equipment / systems affecting energy efficiency such that the condition of the existing equipment / systems during the term of Guarantee is at least equal to their condition at the completion of this Contract. The Owner also agrees to properly maintain all new and existing equipment and operate all of the new and existing systems as described in the Proposal, Installation Contract and Guarantee. If the Owner fails to operate his equipment / systems as described herein and it results in reduced energy or operational savings, then actual energy or operational savings shall be adjusted to the benefit of the Provider to offset lost energy savings caused by such failures by the Owner. A performance bond to insure the faithful performance of the Guarantee is only required for portions of the guaranteed savings that are at risk of not being achieved, non-stipulated savings, herein called Variable Savings. A Variable Savings Bond as described in the Installation Contract shall be provided for Variable Energy Savings ($124,412), but not for Stipulated Savings ($5,643). The calculations contained within this Guarantee shall be used exclusively in determining the actual savings over the term of the Guarantee. No additional monitoring or verification methods shall be used in determining the performance of this Guarantee related to energy or operational savings, unless agreed to in writing by both the Owner and Provider. By signing below, the Owner and Provider are fully accepting this Guarantee and all of its provisions, requirements, calculations, amounts and conditions.

Related to Energy Monitoring

  • Contract Monitoring The criminal background checks required by this rule shall be national in scope, and must be conducted at least once every three (3) years. Contractor shall make the criminal background checks required by Paragraph IV.G.1 available for inspection and copying by DRS personnel upon request of DRS.

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Energy Cooperation shall focus on: (a) renewable energy; (b) promoting the saving of energy; (c) applied research relating to networks of databases linking the two Parties' economic and social operators; (d) backing efforts to modernise and develop energy networks and the interconnection of such networks with Community networks.

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Program Monitoring The Contractor will make all records and documents required under this Agreement as outlined here, in OEC Policies and NHECC Policies available to the SRO or its designee, the SR Fiscal Officer or their designee and the OEC. Scheduled monitoring visits will take place twice a year. The SRO and OEC reserve the right to make unannounced visits.

  • Logistics The Client shall arrange their own transportation and accommodation, unless Client and Performer agree otherwise. If requested, the Performer shall arrange transport within Ostrava, and provide accommodation in a hotel.

  • Monitoring In each case in which the Foreign Custody Manager maintains Foreign Assets with an Eligible Foreign Custodian selected by the Foreign Custody Manager, the Foreign Custody Manager shall establish a system to monitor (i) the appropriateness of maintaining the Foreign Assets with such Eligible Foreign Custodian and (ii) the contract governing the custody arrangements established by the Foreign Custody Manager with the Eligible Foreign Custodian. In the event the Foreign Custody Manager determines that the custody arrangements with an Eligible Foreign Custodian it has selected are no longer appropriate, the Foreign Custody Manager shall notify the Board in accordance with Section 3.2.5 hereunder.

  • Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following: a. Initial Study b. Categorical Exemption (CE) c. Notice of Exemption (XXX) d. Negative Declaration (ND) e. Mitigated Negative Declaration (MND) f. Notice of Preparation (NOP) g. Environmental Impact Report (EIR) i. Initial Document (Screen Check/Administrative Draft) ii. Addendum iii. Supplemental

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Monitoring Services IDT staff shall, using methods that include face-to-face and other contacts with the member, monitor the services a member receives. This monitoring shall ensure that: a. The member receives the services and supports authorized, arranged for and coordinated by the IDT staff; b. The services and supports identified in the MCP as being provided by natural and community supports are being provided; and c. The quality of the services and supports received is adequate and still necessary to continue to meet the needs and preferences of the member and support the member’s outcomes identified in the MCP.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!