Equipment or Material Access and Removal Sample Clauses

Equipment or Material Access and Removal. The Supplier ensures that all equipment and materials brought through the security gate is signed in at the main security gate on an OV18 form.  If the equipment or material is to be removed the same day then the OV18 form will need to be produced at the gate when leaving the site.  If the equipment or material is removed after this time then a Non-Returnable Gate Release needs to be obtained from the Employer.  The Supplier is not allowed to remove any equipment or materials from site without producing the relevant OV18 forms or the equipment lists Access for and Interface with other Contractors  The Employer provides access for, and interface with, other Suppliers to the Suppliers’ personnel and equipment  If the Employer cannot provide access and interface, then the Supplier makes his own assessment of the problems and difficulties which may be encountered  No extra payment or claim of any kind will be allowed on account of providing reasonable access to, and interfacing with others. Materials delivered to the Employer by the Supplier as part of Providing the Services.  Before access is given to the Site, the Supplier is to provide a list of all equipment as supplied by the Supplier. Restrictions on the use of materials provided by the Supplier.  Any Material provided by the Supplier is restricted to use and copying as required for of this Contract only. Form of the programme and procedure for submitting and revising it  The Supplier is to provide the Employer on completion of the Task Order a report in the form of a database or manually. Drawings  The Employer supply to the Supplier on request, any drawings that may be required to provide the Services. Site Information
AutoNDA by SimpleDocs
Equipment or Material Access and Removal. Access The Supplier ensures that all equipment and materials brought through the security gate is signed in at the main security gate on an OV18 form.
Equipment or Material Access and Removal 

Related to Equipment or Material Access and Removal

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Additional Requirements from Authorized Users An Authorized User may have distinct requirements that must be met by all individuals employed by or working for the Authorized User. The Contractor’s Staff Members will be expected to comply with these requirements as a condition of the placement.

  • INSTALLATION AND REMOVAL Show Management reserves the right to fix the time for the installation of a booth prior to the Show opening and for its removal after the conclusion of the Show. Installation of all exhibits must be fully completed by the opening time of the exposition. Any space not claimed and occupied three hours prior to opening, may be resold or reassigned without refund. No exhibitor will be allowed to dismantle or repack any part of his exhibit until after the closing of the Show. 6.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Provision and Removal of Equipment B2.1 The Contractor shall provide all the Equipment necessary for the supply of the Services.

  • Access Requirements You will be responsible for providing the System to enable you to use an Electronic Service.

  • Responsibility for Quality of Materials and Installation Contractor acknowledges that he has full, total, and complete responsibility for providing materials, labor, and all other items necessary for providing the level of quality specified in the Contract Documents. He agrees that this responsibility is indivisible, non-delegable, non- transferable, and not diminished by any inspections provided by the Design Professional or his consulting engineers, nor by any inspections provided by the Owner. In recognition of this, Contractor will prepare for submission and review by the Design Professional, a written program describing the efforts that will be taken to insure the proper quality level is achieved. The program shall be submitted prior to the issuance of a Proceed Order.

Time is Money Join Law Insider Premium to draft better contracts faster.