Existing Utilities; Removal, Relocation and Protection Sample Clauses

Existing Utilities; Removal, Relocation and Protection. In accordance with California Government Code §4215, the District shall assume the responsibility for the timely removal, relocation, or protection of existing main or trunkline utility facilities located on the Site which are not identified in the Drawings, Specifications or other Contract Documents. Contractor shall be compensated for the costs of locating, repairing damage not due to the Contractor's failure to exercise reasonable care, and removing or relocating such utility facilities not indicated in the Drawings, Specifications and other Contract Documents with reasonable accuracy, and for equipment on the Site necessarily idled during such work. Contractor shall not be assessed Liquidated Damages for delay in completion of the Work when such delay is caused by the failure of the District or the owner of the utility to provide for removal or relocation of such utility facilities. Nothing in this Article 4.3.5 shall be deemed to require the District to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the Site can be inferred from the presence of other visible facilities, such as buildings, meters and junction boxes, on or adjacent to the Site. If the Contractor encounters utility facilities not identified by the District in the Drawings, Specifications, or other Contract Documents, the Contractor shall immediately notify, in writing, the District, the Architect, the Owner’s Project Manager and the utility owner. In the event that such utility facilities are owned by a public utility, the public utility shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price. The Contractor shall verify the location and depth (elevation) of all existing utilities and services before performing any excavation work by engaging a qualified locating service and performing all necessary potholing. Contractor shall coordinate with the District for all underground utilities and repair any damage resulting from the work.
AutoNDA by SimpleDocs
Existing Utilities; Removal, Relocation and Protection. In accordance with California Government Code § 4215, City shall assume the responsibility for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the Project Site which are not identified in the Contract Documents provided by City. Design-Builder shall be compensated for the costs of locating, repairing damage not due to Design-Builder's failure to exercise reasonable care, and removing or relocating such utility facilities not indicated in the Contract Documents with reasonable accuracy, and for equipment on the Project Site necessarily idled during such work. Design-Builder shall not be assessed Liquidated Damages for delay in completion of the Work when such delay is caused by the failure of City or the utility provider to provide for removal or relocation of such utility facilities. Nothing in this Paragraph shall be deemed to require City to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the Project Site can be inferred from the presence of other visible facilities, such as buildings, meters and junction boxes, on or adjacent to the Project Site. If Design-Builder encounters utility facilities not identified by City in the Contract Documents, Design-Builder shall immediately notify, in writing, City and the utility. In the event that such utility facilities are owned by a public utility, the public utility shall have the sole discretion to perform repairs or relocation work or permit Design-Builder to do such repairs or relocation work at a price determined in accordance with Article 8 herein.

Related to Existing Utilities; Removal, Relocation and Protection

  • Existing Utilities Any relocation or modification of existing utilities or public improvements necessary to construct the Improvements shall be done at no expense to the public. The Subdivider’s performance of this requirement shall be considered in determining whether to release assurances under paragraphs 10 and 12.

  • Existing utilities and roads Notwithstanding anything to the contrary contained herein, the Concessionaire shall ensure that the respective entities owning the existing roads, right of way or utilities on, under or above the Site are enabled by it to keep such utilities in continuous satisfactory use, if necessary, by providing suitable temporary or permanent diversions with the authority of the controlling body of that road, right of way or utility, and the Authority shall, upon written request from the Concessionaire, initiate and undertake at the Concessionaire’s cost, legal proceedings for acquisition of any right of way necessary for such diversion.

  • Shifting of obstructing utilities The Concessionaire shall, subject to Applicable Laws and with assistance of the Authority, undertake shifting of any utility including electric lines, water pipes and telephone cables, to an appropriate location or alignment within or outside the Site if and only if such utility causes or shall cause a material adverse effect on the construction, operation or maintenance of the Project. The cost of such shifting shall be borne by the Authority or by the entity owning such utility, if the Authority so directs, and in the event of any delay in shifting thereof, the Concessionaire shall be excused for failure to perform any of its obligations hereunder if such failure is a direct consequence of delay on the part of the entity owning such electric lines, water pipes or telephone cables, as the case may be.

  • REPLACEMENT OF PERSONAL PROPERTY (A) An employee, while on duty and acting within the scope of employment, who suffers damage or destruction of the employee’s watch or prescription glasses, or other items of personal property as have been given prior approval by the agency as required to adequately perform the duties of the position, will be reimbursed as provided herein.