Eye Tracking Sample Clauses

Eye Tracking. If eye tracking services or user testing services are utilised the Company will always ensure electronic equipment is in reasonable working order. The Company cannot accept liability for any issues with the eye tracking equipment or software as these are produced by a third party.
AutoNDA by SimpleDocs
Eye Tracking. Of significant relevance to the subject of video data is the subject of eye tracking. This field is not solely devoted to the science of eye tracking (it is often simplified to this) as it also includes subject areas such as face recognition, glance analysis and sleep measures amongst others. On the whole, the use of eye-tracker equipment is relatively specialised and the analy- ses of the generated data can be somewhat complex and time-consuming. Neverthe- less, if the study objectives specifically involve in-depth determination of visual behav- iour during the driving task, then such equipment should be considered since robust results can be produced. An alternative and simple method of analysing visual behaviour within the vehicle is to carefully monitor and code high quality video footage of the driver’s face. Analysis of the footage by trained analysts allows coding of a wide range of behaviours. This can include gesture, mood, glance, sleepiness metrics and additional tasks such as eating or mobile phone use. This technique relies on the availability ofman hours’ and good training. However, the footage will need to be viewed by trained analysts in order to ex- tract the best quality data. Analysis of video data is somewhat limited for in-depth de- termination of visual behaviour.

Related to Eye Tracking

  • Program Monitoring The Contractor will make all records and documents required under this Agreement as outlined here, in OEC Policies and NHECC Policies available to the SRO or its designee, the SR Fiscal Officer or their designee and the OEC. Scheduled monitoring visits will take place twice a year. The SRO and OEC reserve the right to make unannounced visits.

  • Purchase Order Flip via Ariba Network (AN) The online process allows suppliers to submit invoices via the AN for catalog and non- catalog goods and services. Contractors have the ability to create an invoice directly from their Inbox in their AN account by simply “flipping” the purchase order into an invoice. This option does not require any special software or technical capabilities. For the purposes of this section, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider of MFMP the right and license to use, reproduce, transmit, distribute, and publicly display within the system the information outlined above. In addition, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider the right and license to reproduce and display within the system the Contractor’s trademarks, system marks, logos, trade dress, or other branding designation that identifies the products made available by the Contractor under the Contract.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Service Monitoring Customer gives express consent for Vodafone to monitor Customer’s use of the Service (and disclose and otherwise use the information obtained) only to: (a) the extent allowed by Applicable Law; (b) comply with Applicable Law; (c) protect the Network from misuse; (d) protect the integrity of the public internet and/or Vodafone’s systems and Networks; (e) the extent necessary to determine if Customer has breached any conditions or restrictions on use of the Service; (f) provide the Service; and/or (g) take other actions agreed or requested by Customer.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • System Monitoring to ensure safe and continuous operation, the Customer must monitor key services and resource use as recommended by Deswik, and provide Deswik with details of monitoring and any relevant alerts as needed. Services to be monitors include, without limitation, disk space, CPU usage, memory usage, database connectivity, and network utilization.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

Time is Money Join Law Insider Premium to draft better contracts faster.