Fiberglass Insulation Sample Clauses

Fiberglass Insulation. New office demising wall to be insulated with 6-inch fiberglass insulation for the full height of the wall, 2,556 square feet are included · Install one (1) layer of 5/8” sheetrock to each side of new demising wall, from floor to underside of roof, fit tightly around all structural members and utility lines · Office walls – Install one (1) layer of 5/8” sheetrock to each side of new office walls to a height of 10-feet · All new sheetrock walls to be taped three (3) coats, sanded, and made ready for painting · Remove and replace 2,200 square feet of damaged or missing 2 x 2 Tegular ceiling tiles at the open office area · Install a standard grade 2 x 4 suspended acoustical ceiling with white factory finish steel grid and 2 x 4 Cortega ceiling tile at the new corridors, 1,116 square feet is included · Furnish and install 1,408 square feet of 2 x 4 vinyl stippled ceilings at the QC and Micromin rooms · Patch existing ceiling grid where existing walls have been removed · Provide and install the following items: o (9) new 3’0” x 7’0” x 1 ¾” solid core birch veneer doors set in 16-gauge hollow metal jambs o (4) salvaged 3’0” x 7’0” x 1 ¾” solid core birch veneer doors set in 16-gauge hollow metal jambs o Install ADA compliant toilet accessories at (4) toilet rooms · Breakroom / Kitchen – o Relocate and install 10 lineal feet of existing melamine laminate base cabinets and wall cabinets o Relocate (1) 10-foot plastic laminate counter with 4-inch backsplash · Provide and install the following door and restroom hardware: o (13) pairs 4 ½ x 4 plain bearing hinges o (33) lever handle locksets o (9) hydraulic closers o (13) wall mounted bumpers · All visible walls to receive one (1) coat of latex primer and one (1) finish coat of flat latex wall paint · Hollow metal jambs to receive (2) coats of latex gloss paint · New wood doors to receive one (1) coat of sealer and two (2) coats of satin finish polyurethane · Provide and install direct cement down commercial grade carpeting · New carpeting will be installed in the Open Office Area, Private Offices, and (2) Conference Rooms as shown on Exhibit C-2 · Carpeting is included on an allowance basis of $15 / square yard, for material and installation · Furnish and install 2,200 square feet of solvent based pigmented floor sealer at the Machine Shop, Filter Assembly, Finishing and Lab Areas · Floors are to be cleaned and scarified utilizing a commercial orbital floor sanding machine · Provide and install 286 square feet of 6”...
AutoNDA by SimpleDocs
Fiberglass Insulation. When joists are spaced appropriately, recommend fiberglass insulation for the rim joist area in basements that are within the thermal envelope. A recommendation to air seal the rim joist must be made in conjunction with fiberglass batt insulation to provide an aligned air barrier and thermal boundary.

Related to Fiberglass Insulation

  • Insulation In exterior walls? Yes No Unknown In ceiling/attic? Yes No Unknown In any other areas? Yes No Where? Comments:

  • GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration.

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • Explosives Explosives or other highly flammable substances shall not be stored or used on Railroad's property without the prior written approval of Railroad.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Sprinklers Subject to any terms, conditions and limitations set forth herein, Landlord shall provide an operative sprinkler system consisting of mains, laterals, and heads “AS IS” on the date of delivery of the Premises to Tenant. Tenant shall pay for piping distribution, drops and relocation of, or additional, sprinkler system heads and Building firehose or firehose valve cabinets, if Tenant’s Plans and/or any applicable Laws necessitate such.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!