Fifth Year Assessment Sample Clauses

Fifth Year Assessment. Beginning in the Fall 2013, the Xxxx of each college shall designate approximately one-fifth (1/5) of the tenured faculty members of each department for assessment each year in the Spring semester, so that over a five year period, the entire tenured faculty will be reviewed. During the 2012-2013 academic year, faculty may volunteer to participate in the assessment. The final decision about participants, however, will be made by the Xxxx. Moreover, faculty who were assessed during the 2012-2013 academic year under section 12.03 of this Agreement, and faculty who were tenured in 2012-2013 will not be selected for assessment during the 2013-2014 academic year.
AutoNDA by SimpleDocs

Related to Fifth Year Assessment

  • Performance Assessment 6.1 The Performance Plan (Annexure A) to this Agreement sets out key performance indicators and competencies that needs to be evaluated in terms of –

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Impact Assessment If Service Provider desires to make any change, upgrade, replacement or addition that may have an adverse impact or require changes as described in Section 9.6(c) or increase the risk of Service Provider not being able to provide the Services in accordance with this Agreement or violate or be inconsistent with DIR Standards or Strategic Plans, then Service Provider shall prepare a written risk assessment and mitigation plan (1) describing in detail the nature and extent of such adverse impact or risk, (2) describing any benefits, savings or risks to DIR or the DIR Customers associated with such change, and (3) proposing strategies to mitigate any adverse risks or impacts associated with such change and, after consultation and agreement with DIR, implement the plan.

  • Self-Assessment (a) Subject to clause 4.4(b), for Services that are Self-Assessable:

  • Graduated Return to Work Where an Employee is not receiving benefits from another source and is working less than his/her regular working hours in the course of a graduated return-to-work as the Employee recovers from an illness or injury, the Employee may use any unused sick/short term disability allocation remaining, if any, for the portion of the day where the Employee is unable to work due to illness or injury. A partial sick/short term leave day will be deducted for an absence of a partial day in the same proportion as the duration of the absence is to an employee’s regular hours. Where an employee returns on a graduated return to work from a WSIB/LTD claim, and is working less than his/her regular hours, WSIB and LTD will be used to top up the employee’s wages, as approved and if applicable. Where an employee returns on a graduated return to work from an illness which commenced in the previous fiscal year, • and is not receiving benefits from another source; • and is working less than his/her regular hours of work; • and has sick leave days and/or short-term disability days remaining from the previous year The employee can access those remaining days to top up their wages proportional to the hours not worked. Where an employee returns on a graduated return to work from an illness which commenced in the previous fiscal year, • and is not receiving benefits from another source, • and is working less than his/her regular hours of work, • and has no sick leave days and/ or short-term disability days remaining from the previous year, the employee will receive 11 days of sick leave paid at 100% of the new reduced working hours. When the employee’s hours of work increase during the graduated return to work, the employee’s sick leave will be adjusted in accordance with the new schedule. In accordance with paragraph c), the Employee will also be allocated one hundred and twenty (120) short-term disability days payable at ninety percent (90%) of regular salary proportional to the hours scheduled to work under the graduated return to work. The new pro-rated sick/short-term leave allocation may not be used to top-up from part-time to full-time hours.

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

  • Needs Assessment 1. The Contractor shall conduct a cultural and linguistic group-needs assessment of the eligible client population in the Contractor’s service area to assess the language needs of the population and determine what reasonable steps are necessary to ensure meaningful access to services and activities to eligible individuals. [22 CCR 98310, 98314] The group-needs assessment shall take into account the following four (4) factors:

  • PROPERTY ASSESSMENT The Buyer and Seller hereby acknowledge that the Province of Ontario has implemented current value assessment and properties may be re-assessed on an annual basis. The Buyer and Seller agree that no claim will be made against the Buyer or Seller, or any Brokerage, Broker or Salesperson, for any changes in property tax as a result of a re-assessment of the property, save and except any property taxes that accrued prior to the completion of this transaction.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

Time is Money Join Law Insider Premium to draft better contracts faster.