Final Design Drawings and Specifications Sample Clauses

Final Design Drawings and Specifications. After review comments are received from MDEQ, a response will be prepared to address the comments and incorporate any design changes into the final design package. Final coordination and correspondence with MDEQ to receive approval of the project design will take place and is included in this task.
AutoNDA by SimpleDocs
Final Design Drawings and Specifications. Prior to construction approval, final design drawings and specifications shall be submitted to the City for review and approval. Refer to Section 9 and other pertinent sections for drawing submittal requirements.
Final Design Drawings and Specifications. Consultant will prepare 90% design drawings. Consultant will perform design drafting in AutoCAD for the construction plans which will include standard notes, vicinity maps, sheet indexes, north arrows, scale, topography, pipe size, type, fitting, surface repair, crossing requirements, survey control, and special details necessary for a biddable product. In preparing the final design, Consultant will rely on the accuracy of information provided by others. Drafting will be completed on 11”x17” sheets. Final design drawings to include plan and profile drawings. Plans will also include standard details and/or references to appropriate design standards such as Idaho Standards for Public Works Construction (ISPWC). Specifications will include using the EJCDC front-end contract documents, updates to the Supplemental Conditions, special provisions, and references to ISPWC. Upon completion of the 90% plans, Consultant will submit a review set of plans to the Owner and address Owner comments.

Related to Final Design Drawings and Specifications

  • Plans and Specifications After Landlord receives and approves Tenant’s Space Plan as provided above, Tenant will cause Tenant’s Architect to prepare the Plans and Specifications for the Tenant Improvements. Landlord will approve or disapprove (specifically describing any reasons for disapproval) the Plans and Specifications in writing within ten (10) Business Days after receiving them. If Landlord disapproves the Plans and Specifications, Tenant will provide appropriately revised Plans and Specifications to Landlord for approval (or disapproval) within five (5) Business Days on the same basis as set forth above. After Landlord’s approval, Tenant will submit the Plans and Specifications for permits and construction bids. No deviation from the Building Standard will be permitted in the Space Plan or the Plans and Specifications, provided reasonable deviations with respect to the ceiling, lighting, painting, flooring and wall covering may be permitted with Landlord’s approval. Landlord will not approve any deviations which Landlord believes (a) do not conform to applicable codes, ordinances and other Laws or are disapproved by any governmental agency, (b) require services beyond the level normally provided to other tenants in the Building, or (c) are of a nature or quality that are inconsistent with Landlord’s overall plan or objectives for the Building. No approval by Landlord of any deviation constitutes an acknowledgment by Landlord that such deviations are in conformance with applicable codes, ordinances and other Laws. In the event that Landlord’s approval shall be required in this Tenant Improvements Agreement, then notwithstanding anything to the contrary set forth in the Lease, Landlord’s approval shall not be unreasonably withheld, conditioned, or delayed.

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

Time is Money Join Law Insider Premium to draft better contracts faster.