Final Design Drawings. Tenant and the Architect shall prepare the final design drawings and specifications for Tenant Improvements in the Premises (collectively, the "Final Design Drawings") and shall deliver the same to Landlord for Landlord's approval. The Final Design Drawings shall include a layout and designation of all offices, rooms and other partitioning. Landlord may request clarification or more specific drawings for special use items not included in the Final Design Drawings. Landlord shall advise Tenant within five (5) business days after Landlord's receipt of the Final Design Drawings for the Premises if the same are unsatisfactory or incomplete in any commercially reasonable respect. If Tenant is so advised, Tenant shall promptly cause the Final Design Drawings to be revised to correct any deficiencies or other matters Landlord may reasonably require.
Final Design Drawings. On or before the date set forth in construction schedule attached hereto as Schedule 2 (the "CONSTRUCTION SCHEDULE"), Tenant and the Architect shall prepare the final design drawings and specifications for Tenant Improvements in the Premises (collectively, the "FINAL DESIGN DRAWINGS"), which Final Design Drawings shall include a layout and designation of all offices, rooms and other partitioning, their intended use, and equipment to be contained therein to the extent that such equipment affects the mechanical or electrical design of the Premises, and shall deliver the Final Design Drawings to Landlord for Landlord's approval. Landlord's approval of such drawings shall not be unreasonably withheld or delayed. The Final Design Drawings submitted to Landlord: (i) shall provide for interior improvements only, the design of which shall be reasonably consistent with the space plan attached hereto as Schedule 3; (ii) shall provide for the use of readily available commercial building materials; (iii) shall include mechanical and electrical performance specifications for use as design criteria, and (iv) shall be reasonably sufficient for bidding by design/build subcontractors with a reasonable level of experience in the industry. If the Final Design Drawings delivered to Landlord by Tenant do not meet all of the foregoing criteria, Landlord may proceed to establish a Tenant Delay (as defined in Section 4.1).
Final Design Drawings. Prior to issuance of the site construction plan approval, final design and construction documents shall be submitted to the City for review and approval. Approval will not be granted until the City has been satisfied that the requested design modifications have been made. The design submittal shall include all drawings, specifications and supporting calculations needed to verify that the proposed grading and erosion control align with the concepts approved in the land-use findings and decision and meets the City’s design standards as specified herein. The City will not accept any new infrastructure constructed prior to issuance of the site construction plan approval, or infrastructure not inspected at the site and certified by the City as meeting the required standards.
Final Design Drawings. (1) Full Size Plan Set • (1) Electronic media in MicroStation Format in accordance with CADD guidelines
Final Design Drawings. The Final Design Drawings will incorporate the comments from the City, and provide additional detail required to finalize the design. The Final Design Drawings will be stamped by a Professional Engineer. Electronic stamping is acceptable. Traffic control drawings assume typical single lane closure approach for pipeline installation, and a 2 stage construction approach with pipeline work in roundabout lanes. No complete roundabout closures are assumed, and therefore no detour plans are included in this scope.
Final Design Drawings. Prior to issuance of the site construction plan approval, final design and construction documents shall be submitted to the City for review and approval. Approval will not be granted until the City has been satisfied that the requested design modifications have been made. The design submittal shall include all drawings, specifications and supporting calculations needed to verify that the proposed grading and erosion control align with the concepts approved in the land-use findings and decision and meets the City’s design standards as specified herein. The City will not accept any new infrastructure constructed prior to issuance of the site construction plan approval, or infrastructure not inspected at the site and certified by the City as meeting the required standards. Final design drawings shall be prepared with a mylar cover sheet for signatures and standard 20lb bright-white paper for the remaining plan sheets with the appropriate professional stamp. Final drawings shall be submitted on ANSI D- 22” X 34”, and electronic PDF half-scale 11” X 17”. Graphical representations of dedicated infrastructure on final design drawings must meet City Drafting Standards (Refer to Section 9). Capital improvement projects will use the standard City title block and drawing format available from the Public Works Department. Land development projects with dedicated infrastructure shall use the City supplied signature block on every drawing submitted. Signature blocks to include, at a minimum, the Public Works Director and any impacted utilities (i.e. Quest, PP&L, DVWD).
Final Design Drawings. Prior to construction approval, final design and construction documents shall be submitted to the City for review and approval. The design submittal shall include all drawings, specifications and supporting calculations needed to verify that the proposed stormwater system aligns with the land use decision concepts and meets the City’s design standards as specified herein. The City will not allow construction of new infrastructure prior to construction plan approval. Also, the City will not take over or accept responsibility for any new infrastructure that has not been inspected, tested, and certified to meet the required standards. Final design drawings shall be prepared with a mylar cover sheet for signatures and standard 20lb bright-white paper for the remaining plan sheets with the appropriate professional stamp. Final drawings shall be submitted on ANSI D- 22”x34”, and electronic PDF half-scale 11”x17”. Graphical representations of dedicated infrastructure on final design drawings must meet City Drafting Standards (Refer to Section 9). Capital improvement projects will use the standard City title block and drawing format available from the Public Works Department. Land development projects with dedicated infrastructure shall use the City supplied signature block on every drawing submitted. Signature blocks to include, at a minimum, the Public Works Director and any impacted utilities (i.e. Quest, PP&L, DVWD).
Final Design Drawings. Final design drawings are complete in details, notes, and all aspects considered at final design. The final design will have fulfilled all design requirements and standards as specified by PUD and Engineering and Capital Projects Department and any other agencies involved in the Project review. Design Professional will incorporate agreed upon City comments from the 100% Submittal. The City will make any final comments of the final design submittal to be incorporated in a revised FINAL design that will be resubmitted by Design Professional as soon as the edits are completed.
Final Design Drawings. The base contract planned for 15 contract drawings. Subsequent, to the development we have identified that the Construction Documents will contain at least 24 contract drawings, an additional 9 sheets. It will take an additional level of effort to generate and edit the additional drawings for the 60%, 90% and 100%/Bid Ready documents. • Additional noteworthy item:
Final Design Drawings. Complete final design submittal to address 100% City comments.