FUTURE WATER SUPPLY WELL FIELD Sample Clauses

FUTURE WATER SUPPLY WELL FIELD. To provide groundwater production capacity necessary to satisfy the Town’s growing service obligations in a manner that will minimize effects on the Buffalo Pasture, the Town shall apply for appropriate State Engineer permits for four (4) deep xxxxx farther from the Buffalo Pasture than the Town’s current In-Town Well Field. While the Water Rights Owning Parties have agreed to certain waivers of protests, this Settlement Agreement does not impose any diversion or consumptive use limitations on these four new xxxxx. The four deep water supply xxxxx are identified as (1) the Rio Pueblo well; (2) the National Guard well; (3) the Camino del Medio well; and (4) the Xxxxxx well, and will be located as shown in Attachment 10. The planning, permitting, NEPA compliance, design, engineering and construction of these water supply xxxxx will include water lines, booster pumps, lift stations, appropriate housing, arsenic treatment facilities, primary electrical lines, the purchase of land, and any other equipment and appurtenances required for arsenic treatment and water distribution from these xxxxx to the Town’s municipal distribution system, except that construction of the Camino del Medio well shall not be included because that well has already been constructed. Interconnection of the Camino del Medio well to the Town’s municipal water system is included. The offset of any surface water depletion effects which result from Future Groundwater Diversions from these xxxxx shall be in accordance with Article 7. Pumping from these xxxxx shall be from model layers 6 and 7 except that up to twenty percent (20%) of the screen in the Rio Pueblo well may be in model layer 5.
AutoNDA by SimpleDocs

Related to FUTURE WATER SUPPLY WELL FIELD

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

Time is Money Join Law Insider Premium to draft better contracts faster.