GAS FURNACE Sample Clauses

GAS FURNACE. All internal functioning parts supplied by the manufacturer;
AutoNDA by SimpleDocs
GAS FURNACE. If the property you are renting is heated by a gas heater or furnace, it is your responsibility to order and pay for the gas delivery. You must occasionally monitor the level of gas in the tank by looking at the gauge on the tank. (Often, the gas company will insert a smell into the gas to alert you that it is low. The smell is not dangerous; the gas itself does not have an odor.) Allowing the tank to become low or completely empty will cause the pilot light to go out. If you allow this to occur, it will be your responsibility to safely re-light the pilot or pay for the service call to do so.
GAS FURNACE. 8. The Residents are specifically responsible for costs of repairs and service charges resulting from their carelessness in using the refrigerator, gas/electric range, heating or any of the mechanical equipment, and for drain blockages, such as clogged toilets, sinks and bathtub drains caused by hair, sanitary napkins, paper towels, Kleenex tissues, foreign objects or disposable flush-away diapers.
GAS FURNACE. Condition: Satisfactory Comments: The gas furnace was inspected and operated. At the time of inspection the furnace was operating as intended and their were no issues or concerns noted. Heat Distribution Condition: Satisfactory Type:Ductwork Location:Each room Combustion Air Condition: Satisfactory Comments: Combustion air is drawn from a dedicated vent outside and vented through a separate dedicated vent through the roof. These vents were not readily accessible and mostly covered up by the wall coverings, thus a full inspection was not possible. Heat Exchanger Condition: Satisfactory Status:Tested Visibility:Not visible Comments: The heat exchanger was not visible as it was enclosed in the unit. The system fired up and began heating quickly and appeared to be operating as intended at the time of this inspection. Unit Venting Condition: Satisfactory
GAS FURNACE. FALL START-UP
GAS FURNACE. (Checked in Winter) Check fan off/on control & set differential Check flues Monitor flue draft Check transformers output Clean heat exchanger or elements Additional benefits for Ferran Plan customers include: Priority Service. We offer guaranteed service within 24-hours for all Air Conditioning, Electrical and Plumbing service calls. Should you require additional service calls during the year, you receive a 15% discount off the repair portion of any Air Conditioning, Electrical or Plumbing service invoice.
GAS FURNACE. Refer to the lighting instructions affixed to each furnace. Each furnace has “ safety” pilot features. Keep the furnace free from dust and dirt. Always leave a window open when sleeping with the furnace in operation. Refer to the Manufacturer’ s Operating & Maintenance Manual for further instructions.
AutoNDA by SimpleDocs

Related to GAS FURNACE

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

Time is Money Join Law Insider Premium to draft better contracts faster.