General Construction Activities Sample Clauses

General Construction Activities. ‌ Including, but not limited to, the enrollment sectors identified in 6.1 through 6.5 above, general construction activities that include, but are not limited to, construction of facility sites, infrastructure, roads, and implementation of best management practices, which involves the use of heavy equipment and trucking activities in clearing vegetation, contouring, compacting, stabilizing soils, constructing and maintaining roads and linear infrastructure, and installing erosion control (including silt fencing, earthen berms, etc.). The list of construction activities are described above is not intended to be exhaustive.
AutoNDA by SimpleDocs
General Construction Activities. The contractor shall not be permitted to transport construction materials or equipment longitudinally over the pipeline. • Where it is necessary for construction equipment (i.e., tractors, backhoes, dump trucks, etc.) or equipment transporting construction materials to cross the pipeline, the crossing of the pipeline right-of-way shall be at, or as near to, a 90˚ angle as is feasible. • To gain access to the job site, the contractor shall submit a plan indicating where construction equipment will cross the pipeline, along with the depth of the pipe at the crossings, any proposed ramping over the pipeline, together with the following specifications for the equipment: type and weight of equipment; for track equipment – track width and length; for wheeled equipment – number of axles (single or tandem axles). BP will perform a stress factor calculation to determine if the equipment can safely cross the pipeline. If crossing of the pipeline is allowed, special measures may need to be taken to ensure the integrity of the pipeline. • No track type construction equipment shall be permitted to pivot or turn directly over the top of the pipeline. • A scraper or pan type tractor shall not be used for removal of soil within ten feet (10’) of the centerline of the pipeline. Rubber tire or small track type equipment is an acceptable alternative. • A sheepsfoot roller shall not be used for compaction purposes within five feet (5’) or directly above the centerline of the pipeline. • No vibratory rollers shall be used within three feet (3’) of the centerline of the pipeline until the compacted cover over the pipeline has reached a depth of three and one-half feet (3 ½’). EXHIBIT D EXHIBIT D
General Construction Activities. Construction solid waste, debris and refuse generated on-site should be collected, handled and disposed of properly to avoid entering any nearby stormwater drain. Stockpiles of cement and other construction materials should be kept covered when not being used. Oils and fuels should only be stored in designated areas which have pollution prevention facilities. To prevent spillage of fuels and solvents to any nearby stormwater drain, all fuel tanks and storage areas should be provided with locks and be sited on sealed areas, within bunds of a capacity equal to 110% of the storage capacity of the largest tank. The bund should be To minimize water quality impacts MTRC / Contractor All works areas During Construction EIA Recommendation drained of rainwater after a rain event. Objectives of the EIA Ref. EM&A Ref. Recommended Mitigation Measures Recommended Measure & Main Concerns to address Who to implement the measure? Location of the measure What When to requirements or implement the standards for measure? the measure to achieve? Water Quality Impact (Operation)

Related to General Construction Activities

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • ADDITIONAL CONSTRUCTION The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority (ies) except for as provided in the Act.

  • Liberal Construction The Covenants hereof shall be liberally construed to promote and accomplish the objectives set forth in the Recitals.

  • Legal Construction If one or more of the provisions contained in this Agreement shall for any reason be held invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions and this Agreement shall be construed as if it did not contain the invalid, illegal, or unenforceable provision.

  • Neutral Construction The parties to this Agreement agree that this Agreement was negotiated fairly between them at arm's length and that the final terms of this Agreement are the product of the parties' negotiations. Each party represents and warrants that it has sought and received legal counsel of its own choosing with regard to the contents of this Agreement and the rights and obligations affected hereby. The parties agree that this Agreement shall be deemed to have been jointly and equally drafting by them, and that the provisions of this Agreement therefore should not be construed against a party or parties on the grounds that such party or parties drafted or was more responsible for the drafting of any such provision(s).