Grant Project Planning of Activities Sample Clauses

Grant Project Planning of Activities. When can the implementation of activities start? For the implementation of the grant project’s activities (workshops, trainings, studies), the SAIP must obtain prior approval from the MA. This implies that activities can only be implemented when they are included in the Action Plan (see annex C) for the grant project. This Action Plan needs to be updated with every Quarterly Report. Activities can only be implemented upon receipt of the approval letter from the MA for the updated Action Plan in which the respective activity is included. What to do when I want to implement activities which are not included in the Action Plan? In case the SAIP wishes to implement an activity which was not foreseen in the Action Plan for the quarter in question, it will need to submit a revised Action Plan and await approval from the MA before starting the actual implementation.
AutoNDA by SimpleDocs

Related to Grant Project Planning of Activities

  • Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35

  • Description of Activities The objectives of the activities (Activities) to be financed under this Trust Fund are to contribute to: (a) enhanced capacity for effective policy formulation in the countries of grant recipients of the African Capacity Building Foundation (variously, “ACBF” or “Recipient”); and (b) improvements in the management of ACBF’s operations. The Activities consist of the following:

  • Requirement for Project Planning No physical work will begin on the construction site until the receipt of a Proceed Order issued by the Owner. The Contract assumes that a Proceed Order will be issued in not more than sixty days from the Effective Date of the Contract. Failure of the Contractor to provide the necessary documentation for the issuance of a Proceed Order shall not entitle the Contractor to any extension of time. If a Proceed Order is not issued within sixty days from the award of the Contract and non-issuance is due to nonperformance by the Contractor, the Contractor may be in default.

  • Scope of Activities Transmission planning activities will be coordinated in accordance with the Amended and Restated Northeast ISO/RTO Planning Coordination Protocol (“Protocol”), between and among PJM Interconnection, L.L.C., the New York Independent System Operator, Inc. and ISO New England Inc., effective as of December 12, 2004 as amended on July 10, 2013.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • PROJECT ACTIVITIES Grantee must perform the project activities set forth on Exhibit A (the “Project”), attached hereto and incorporated in this Grant by this reference, for the period beginning on the Effective Date and ending June 30, 2021 (the “Performance Period”).

  • Program Activities Grantee must use the Grant Funds as set forth in Exhibit A (the “Program”).

  • Research Project 3.1 These Materials and Data will be used by Recipient's PI solely in connection with the Research Project, as named and described in the attached research application (insert Research Project name below):

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Professional Development Activities Professional development activities are activities initiated by individual faculty members or groups of faculty members and may include attendance at conferences, workshops or seminars which facilitate the following:

Time is Money Join Law Insider Premium to draft better contracts faster.