Heat Tape Sample Clauses

Heat Tape. Electrical Contractor shall provide junction boxes or weatherproof, ground fault interrupting type duplex receptacles for heat tapes. See electrical drawings for locations and confirm exact locations and termination requirements with the Mechanical Contractor.
AutoNDA by SimpleDocs
Heat Tape. Supply and install 5–10-watt temperature regulating Heat trace to eave area on both sides of building. Supply and install Electrical supply to roof area. Weatherproof mast heads to be utilized. Install heat trace in eave area and loop onto snow retention system. Install into eave areas and weave up to roof snow guard on each metal panel. Type of heat trace wattage to be determined by the design requirements for length. NOTE: All work must comply with Worksafe BC Safety standards. NOTE: Roof system to be engineered by manufacturer or 3rd party engineer to meet local wind uplift requirements. APPENDIX L MATERIALS LIST Xxxxxxx Steel SSR24 Panel roof system And Xxxxxx SSR24 Installation Manual or industry equals 24-gauge. Galvalume or pre-painted (to be determined) Sliding Clip system for thermal Expansion and contraction Assorted associated 24-gauge flashings to match roof colour or type. Wood STD & BTR 2x 10 fascia assorted sizes dimension lumber Fasteners as per manufactures recommendations #14 X 1-1/4” most common #14x7/8" xxxxx screw. Assorted tec screws. Nails, spikes: to CSA B111-1974 Plumbing vent flashing as per manufacturer details. Chimney flashings as per manufacturers details. Sika flex or better sealants and caulking as specified by manufacturer, not silicon or acrylic Additional lap sealant as per manufacturers recommendations. as per manufacturers Heat trace. 5-10 watt per linear Foot at 120/240 VAC (Self-regulating) INSPECTION AND GUARANTEE INSPECTION An inspection to be carried out by Xxxx Roof Inspection Ltd. Cost of inspection services to be Paid directly by owner. Upon completion, supply the owner with a standard metal roofing warrantee. Advise Xxxx Roof Inspection Ltd. of start of work, a minimum of 48 hours prior to commencement of project.

Related to Heat Tape

  • Drug-Free Workplace Certification As required by Executive Order No. 90-5 dated April 12, 1990, issued by the Governor of Indiana, the Contractor hereby covenants and agrees to make a good faith effort to provide and maintain a drug-free workplace. The Contractor will give written notice to the State within ten (10) days after receiving actual notice that the Contractor, or an employee of the Contractor in the State of Indiana, has been convicted of a criminal drug violation occurring in the workplace. False certification or violation of this certification may result in sanctions including, but not limited to, suspension of contract payments, termination of this Contract and/or debarment of contracting opportunities with the State for up to three (3) years. In addition to the provisions of the above paragraph, if the total amount set forth in this Contract is in excess of $25,000.00, the Contractor certifies and agrees that it will provide a drug-free workplace by:

  • Outputs 8. The objectives and outcomes of this Agreement will be achieved through a range of outputs. The outputs include the:

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Escrow Format Specification 3.1. Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • SAMPLE (i) Unless agreed otherwise, wheeled or track lay- ing equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails approved under B5.1 or B6.422. Purchaser may be required to backblade skid trails and other ground disturbed by Purchaser’s Opera- tions within such areas in lieu of cross ditching required under B6.6. Additional special protection measures needed to protect such known areas are identified in C6.24.

Time is Money Join Law Insider Premium to draft better contracts faster.