Materials List Sample Clauses

A Materials List clause defines and enumerates all materials required for a specific project or contract. It typically details the type, quantity, and specifications of each material to be supplied or used, ensuring both parties have a clear understanding of what is needed. This clause helps prevent disputes over material quality or sufficiency by providing a definitive reference, thereby ensuring the project proceeds smoothly and according to agreed standards.
POPULAR SAMPLE Copied 2 times
Materials List. Recipient shall, prior to construction, submit a materials list and proposed construction schedule to ODOT’s ConnectOregon Program Manager. Project costs will only be reimbursed through the design phase of Project until the materials list and proposed construction schedule have been submitted to ODOT’s ConnectOregon Program Manager. Recipient must submit a Request for Change Order and a revised materials list if there are substantial changes to the scope of work. MANDATORY FOR RAIL – Include the following three paragraphs on all rail projects. If not a rail project, delete section B.
Materials List. As quickly as possible, and in any event by a sufficiently early date to avoid any delays on the Project, a list of materials the Subcontractor proposes using on the Project (the “Materials List”) is to be submitted to the Contractor for the Architect's approval. Contractor shall have the right to determine, in its sole discretion, whether such proposed materials are suitable for Subcontractor’s Work on the Project, and Subcontractor agrees to make any and all revisions to the Materials List required by Contractor and to make such revisions within the time period required by Contractor.
Materials List. 3 pumps, (one as a backup) The clean water pump (dam at culvert catch basin) shall have a minimum capacity of 1200 gallons per minute. The dirty water pump (settling pond) and the backup pump shall each have a minimum capacity of 600 gpm. Culvert removal should not start during rain or threat of rain; • plastic sheet; • silt fence and stakes; • ▇▇▇▇▇ of weed free straw . DRAFT − Remove fill in layers not to exceed 3 feet. DRAFT DRAFT DRAFT ROAD ABANDONMENT CROSS SECTIONS Woody debris & vegetation DRAFT MEDIUM DRAFT ROCK ACCOUNTABILITY DETAIL SALE NAME: Purchaser: Agreement #: Contractor: DRAFT Rock Quarry/Pit: Truck No: DAILY ROCK LOAD RECORD DATE LOAD TIME ROAD NO. TYPE OF ROCK QUANTITY COMMENTS Truck Driver Signature SIGNATURE DATE
Materials List. This will include a list of recommended materials with specifications for material or corrosion allowances necessary for anti-corrosion or anti-corrosion protection;
Materials List. The materials and equipment contained in the following list are authorized for purchase once the Contractor has complied with approval requirements as stated in Sections C.5.2.3 and C.5.2.4 below: Software Maintenance Support – Licenses ABC2 Terminals and Peripherals OpenPort Terminals and Peripherals GBC and Location Server Hardware User Equipment Terminals and Peripherals Test and Troubleshooting Equipment Materials not fitting the description listed in this Section may not be purchased and reimbursed as an Other Direct cost to this Contract unless mutually agreed to by both the Government and the Contractor and subsequently added to the Contract by Contract Modification.
Materials List. A description of the materials and other physical elements that make up the proposed mural. This includes the artwork itself, support structure, and any other special requirements for installation. Specific information regarding the following should be included: • The durability and suitability of all materials to an outdoor, heavily used public environment • A general outline of ongoing maintenance considerations (i.e., what regular maintenance is required, how often, etc.) • A general statement regarding the appropriateness of the materials with regards to public safety and vandalism deterrence
Materials List. 3 pumps, (one as a backup) The clean water pump (dam at culvert catch basin) shall have a minimum capacity of 1200 gallons per minute. The dirty water pump (settling pond) and the backup pump shall each have a minimum capacity of 600 gpm. Culvert removal should not start during rain or threat of rain; • plastic sheet; • silt fence and stakes; • ▇▇▇▇▇ of straw .

Related to Materials List

  • Materials Transfer In order to facilitate the Development activities contemplated by this Agreement, either Party may provide to the other Party certain biological materials or chemical compounds Controlled by the supplying Party (collectively, “Materials”) for use by the other Party in furtherance of such Development activities. Except as otherwise provided for under this Agreement, all such Materials delivered to the other Party will remain the sole property of the supplying Party, will be used only in furtherance of the Development activities conducted in accordance with this Agreement, will not be used or delivered to or for the benefit of any Third Party, except for subcontractors, without the prior written consent of the supplying Party, and will be used in compliance with all Applicable Laws. The Materials supplied under this Agreement must be used with prudence and appropriate caution in any experimental work because not all of their characteristics may be known. Except as expressly set forth in this Agreement, THE MATERIALS ARE PROVIDED “AS IS” AND WITHOUT ANY REPRESENTATION OR WARRANTY, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION ANY IMPLIED WARRANTY OF MERCHANTABILITY OR OF FITNESS FOR ANY PARTICULAR PURPOSE OR ANY WARRANTY THAT THE USE OF THE MATERIALS WILL NOT INFRINGE OR VIOLATE ANY PATENT OR OTHER PROPRIETARY RIGHTS OF ANY THIRD PARTY.

  • Material Safety Data Sheet The contractor shall provide Material Safety Data Sheets (MSDS) with the information required by the Act and the regulations for each hazardous substance or hazardous mixture. The Commonwealth must be provided an appropriate MSDS with the initial shipment and with the first shipment after an MSDS is updated or product changed. For any other chemical, the contractor shall provide an appropriate MSDS, if the manufacturer, importer, or supplier produces or possesses the MSDS. The contractor shall also notify the Commonwealth when a substance or mixture is subject to the provisions of the Act. Material Safety Data Sheets may be attached to the carton, container, or package mailed to the Commonwealth at the time of shipment.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • MATERIAL SAFETY DATA SHEETS As applicable, Contractor shall provide Purchaser with all appropriate current Material Safety Data Sheets (“MSDS”) at the time of delivery of each shipment of Goods which requires such compliance and/or and for materials used by Contractor while performing Services pursuant to this Contract.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.