Impact Loads Sample Clauses

Impact Loads. Impact loads will be added to other loads for components supporting reciprocating or rotating machines, elevators, hoists, cranes, or other equipment creating dynamic forces. The following impact loads will be used, unless analysis indicates higher or lower values. o Elevators - 100 percent of lifted load. o Hoists and cranes. - Vertical - 25 percent of the maximum static wheel load. - Horizontal - lateral - 20 percent of the sum of the lifted load plus the weight of the hoisting component. - Horizontal - longitudinal - 10 percent of the total moving load. o Rigid pavement design for roadways - 20 percent of the wheel or crawler loads. o Rotating and reciprocating equipment - 50 percent of the machine weight. o Hangers supporting floors and platforms - 33 percent of the sum of the dead load and reduced live load. Pipe Hanger Loads Pipe hanger loads for the major piping systems, such as the main steam and boiler feedwater, will be specifically determined and located. Piping expansion and dynamic loads will be considered -------------------------------------------------------------------------------- Proprietary Information Page 5 AES IRONWOOD CONTRACT FINAL ISSUE - OCTOBER 30, 1998 -------------------------------------------------------------------------------- 2x1 501G REFERENCE PLANT APPLICATION HANDBOOK -------------------------------------------------------------------------------- STRUCTURAL ENGINEERING DESIGN CRITERIA -------------------------------------------------------------------------------- on an individual basis for their effect on the structural systems. Loads imposed on perimeter beams around pipe chase areas will also be considered on an individual basis. Pipe loads for other areas will be treated as uniform loads per unit floor area, and will be carried to the columns and foundations as dead loads. Pipe loads will not be considered as reliable dead load for uplift. Equipment Loads Equipment loads will be specifically determined and located. For major equipment, structural members and bases will be specifically located and designed to carry the equipment load into the structural system. For equipment weighing less than the live load, the structural system will be designed for the live load. Equipment loads will be noted in the design calculations to permit separation in calculation of uplift and stability. Wind Loads Wind loads for all structures will be computed using ASCE 7-95. A step function of pressure with height under Exposure C will...
AutoNDA by SimpleDocs
Impact Loads. Impact loads shall be added to other loads for components supporting reciprocating or rotating machines, elevators, hoists, cranes, or other equipment creating dynamic forces. The following impact loads shall be used, unless manufacturers recommend higher values or analysis indicates higher or lower values. - Hoists and cranes Vertical--25 percent of the maximum static wheel load. Horizontal-lateral--20 percent of the sum of the lifted load plus the weights of the hoisting component. Horizontal-longitudinal--10 percent of the total moving load. - Railroads and roadways--25 percent of the wheel or crawler loads. - Rotating and reciprocating equipment--50 percent of the machine weight. - Hangers supporting floors and platforms--33 percent of the sum of the dead load and reduced live load.
Impact Loads. For structures carrying live loads / imposed loads which induce impact, the design loads shall be increased to reflect the assessed effect of such impact in accordance with the relevant design code or standard. When a structure, structural member or connection is subjected to moving or vibrating loads which, in the opinion of the Contractor do not warrant a dynamic analysis, the live loads which induce impact shall be multiplied by the following impact factors: Elevator supports 2.00 Cab-operated travelling crane supports 1.25 Pendant-operated travelling crane supports 1.25 Floor and balcony hangers 1.33 The live loads on crane supports and machinery supports shall be taken as the maximum crane wheel loads and machinery loads respectively. These design loads shall be treated as permanent loading in a case of “working-stress design method”.

Related to Impact Loads

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

  • Sprinkler System If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Emergency Generator Although Landlord is the owner of emergency generator and related automatic transfer switches serving the Building and the 901 Building (collectively, the “Emergency Generator”), prior to the date of this First Amendment, Tenant, as the sole tenant of the Building and the 901 Building, has been operating and maintaining the Emergency Generator. Tenant shall, on the date that is 1 day after the mutual execution and delivery of this First Amendment by the parties (“EG Transfer Date”), (x) deliver the Emergency Generator to Landlord in good working order with a full tank of diesel (y) assign to, transfer and deliver to Landlord all governmental permits and licenses (to the extent such permits and licenses are assignable), if any, warranties (to the extent assignable), operating and maintenance manuals, records and other documents concerning the Emergency Generator, and (y) terminate any service, maintenance or other contracts maintained by Tenant with respect to the Emergency Generator. Tenant has not been obligated to maintain a wastewater permit in connection with the Emergency Generator. With respect to any permit required for the Emergency Generator, Landlord acknowledges and agrees that Tenant has been in the process of obtaining a generator permit in connection with a Tenant permitting process underway with the Bay Area Air Quality Management District (“BAAQMD”) for the 901 Building, that Tenant will remove the generator from its permit application with BAAQMD, and that Landlord will need to obtain a generator permit from BAAQMD in its own name. To the best of Tenant’s knowledge, Tenant does not have any other permits in connection with the Emergency Generator. To the extent Tenant has current contracts with any vendors for the Emergency Generator, Tenant and Landlord shall reasonably cooperate to assign or terminate such contracts in the manner set forth in Section 14 above regarding utilities. To the extent it is not possible for Tenant to remove the request for a generator permit from its BAAQMD application or to assign or terminate any service maintenance or other contracts within 1 day after the mutual execution and delivery of this First Amendment, Tenant shall not be in default hereunder if Tenant promptly commences efforts to do so and diligently performs until such actions have been completed within a reasonable period after such date. Landlord shall, within 5 days of the EG Transfer Date, as part of Expenses, conduct such testing of the Emergency Generator required, in Landlord’s sole and absolute discretion, to determine whether the Emergency Generator is, in fact, in good working order. If such testing discloses that the Emergency Generator is not in good working order, Landlord shall have the right, at Tenant’s sole cost and expense, to perform any maintenance and/or repairs required to put the Emergency Generator in good working order. Following the EG Transfer Date, Landlord’s sole obligation for either providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the current capacity of the Emergency Generator and Tenant shall be entitled to Tenant’s share of the capacity thereof available for use by all tenants of the Building and the 901 Building, collectively, in accordance with the rentable area of the Premises and the 901 Building and the collective rentable areas of the Building and the 901 Building occupied by such other tenants, (ii) to contract with a third party to maintain the emergency generators (“Emergency Generator Servicer”) as per the manufacturer’s standard maintenance guidelines, and (iii) to obtain and maintain licenses for the emergency generators as required by applicable law. Landlord shall have no obligation to provide Tenant with operational emergency generators or back-up power or to supervise, oversee or confirm that the Emergency Generator Servicer or any other third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. Landlord shall provide to Tenant copies of any reports received by Landlord from the Emergency Generator Servicer regarding its maintenance and repairs of the emergency generators; provided, however, that in no event shall Landlord’s failure to deliver such reports constitute a default by Landlord under the Lease. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed. Landlord shall provide Tenant with not less than five (5) business days’ notice of the scheduled disruption in the operation of the emergency generators. In the case of an emergency, Landlord shall provide Tenant with notice of any emergency disruption as soon as reasonably possible after Landlord becomes aware of the need for such emergency disruption.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!