INCIDENT SUMMARY Sample Clauses

INCIDENT SUMMARY. On April 5, 2001, natural gas and natural gas condensate were discharged near the northern bank of Mosquito Bay, Terrebonne Parish, Louisiana (Figure 1. 1). The discharge originated from a 20-inch pipeline that transported natural gas condensate produced from several gas xxxxx, which resulted in a large volume of natural gas condensate flowing through the line. Williams, LOSCO, LDEQ, and the U.S. Coast Guard (USCG) provided estimates of discharge volume that ranged from 1,000 to 3,000 barrels. Brackish xxxxx vegetation (hereafter referred to as “xxxxx”), xxxxx sediments, coastal waters, and fauna inhabiting this area were exposed to natural gas condensate from this discharge. A controlled burn was used during the incident response on April 12 and 13, 2001, to remove natural gas condensate from the environment. The burn affected xxxxx that was not exposed to natural gas condensate because the fire moved outside of the planned burn area. Additional injury to xxxxx was caused by heavy equipment used to repair the pipeline. The Trustees and the RP’s consultant conducted several field investigations after the burn to assess xxxxx recovery. Based on these field investigations, the Trustees delineated the spatial extent of exposure from the discharged material and the severity of effect to natural resources and services. The Trustees concluded that birds, fish, and other fauna, as well as their habitat, were exposed to natural gas condensate. Thus, the Trustees initiated a natural resource damage assessment (NRDA) to determine the nature and extent of injuries to natural resources and services. The RP has been a cooperative participant throughout the NRDA process.
AutoNDA by SimpleDocs
INCIDENT SUMMARY. This reporting period Reporting period- 1 year ago Reporting period- 2 years ago

Related to INCIDENT SUMMARY

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Executive Summary Contractor shall, upon request by NASPO ValuePoint, provide NASPO ValuePoint with an executive summary that includes but is not limited to a list of states with an active Participating Addendum, states with which Contractor is in negotiations, and any Participating Addendum roll-out or implementation activities and issues. NASPO ValuePoint and Contractor will determine the format and content of the executive summary.

  • JOB SUMMARY Vouches sample transaction in audit verification assignments and submits findings to supervisor; • Records proceedings of entry and exit conferences; • Collects and analyses data and statistics; • Prepares audit working papers for review by supervisor; • Undertakes any other duties that may be assigned by the Chief Internal Audit Technician.

  • Service Description 2.1 General

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Hosting 43.6.4.1 At CLEC’s request, SBC-10STATE shall perform hosting responsibilities for the provision of billable message data and/or access usage data received from CLEC for distribution to the appropriate billing and/or processing location or for delivery to CLEC of such data via SBC-10STATE’s internal network or the nationwide CMDS network pursuant to the applicable Appendix HOST, which is/are attached hereto and incorporated herein by reference.

  • Status Report Recognizing that both parties may find it necessary to establish to third parties, such as accountants, banks, mortgagees, ground lessors, or the like, the then current status of performance hereunder, either party, on the request of the other made from time to time, will promptly furnish to Landlord, or the holder of any mortgage or ground lease encumbering the Premises, or to Tenant, as the case may be, a statement of the status of any matter pertaining to this Lease, including, without limitation, acknowledgment that (or the extent to which) each party is in compliance with its obligations under the terms of this Lease.

  • Site Description {Buyer Comment: Provide a legal description of the Site, including the Site map.}

  • Service Descriptions Credit Card processing services: Global Direct’s actions to the appropriate card associations and/or issuers (e.g., Visa, MasterCard, Diners, Discover); settlement; dispute resolution with cardholders’ banks; and transaction-related reporting, statements and products. Debit/ATM Processing Services: Global Direct has connected to the following debit card networks (“Networks”): Accel, AFFN, Interlink, MAC, Maestro, NYCE, Pulse, Star, and Tyme. Global Direct will provide Merchant with the ability to access the Networks that Global Direct has connected to for the purpose of authorizing debit card transactions at the point of sale from cards issued by the members of the respective Networks. Global Direct will provide connection to such Networks, terminal applications, settlement and reporting activities. EBT Transaction Processing Services: Global Direct offers electronic interfaces to Electronic Benefits Transfer (“EBT”) networks for the processing of cash payments or credits to or for the benefit of benefit recipients (“Recipients”). Global Direct will provide settlement and switching services for various Point of Sale transactions initiated through Merchant for the authorization of the issuance of the United States Department of Agriculture, Food and Nutrition Services (“FNS”) food stamp benefits (“FS Benefits”) and/or government delivered cash assistance benefits (“Cash Benefits, ”with FS Benefits, “Benefits”) to Recipients through the use of a state-issued card (“EBT Card”). With respect to Visa and MasterCard products, Merchant agrees to pay and Merchant's account(s) will be charged pursuant to Section 5 of this Agreement for any additional fees incurred as a result of Merchant's subsequent acceptance of transactions with any Visa or MasterCard product that it has not elected to accept.

  • TEMPLATE That certain three well drilling template acquired, inter alia, by Seller for use in connection with the drilling of the OCS-G 7049 #5 Well.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!