Inclining Experiment Sample Clauses

Inclining Experiment. In accordance with Contract Section C, Clause C115.D, a stability test on the vessel shall be performed to determine the basic stability parameters. The inclining experiment shall accurately determine the As-Built lightship weight and the coordinates of the center of gravity for the completed vessel in three directions. Upon completion of all work, with the vessel in the lightship condition, the Contractor shall conduct an inclining test. The inclining test shall be carried out in accordance with ASTM F 1321-92. The Contractor shall provide the requirements, incline weight data, pendulum lengths, incline test procedure, etc., to the Government for review. The Contractor shall direct the incline procedure, record the data, and prepare the report. The Contractor shall be responsible for providing all inclining weights, pendulum setup, support equipment, and personnel. The Contractor shall erect a minimum of 3 pendulums for the inclining experiment.
AutoNDA by SimpleDocs
Inclining Experiment. The vessel shall be inclined (or a dead weight survey conducted for sister ships), if required under the supervision of USCG. Weights and locations for any items intended to be on board at completion but not in place at that time are to be carefully determined and estimated figures used in calculations. All weights, shoring, work parties, and crane services shall be furnished by the shipyard. The inclining experiment report and stability study shall be prepared by the Builder. A copy of the USCG stability letter shall be submitted to the Owner and posted on vessel.

Related to Inclining Experiment

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Teaching Experience Recognized Years of Experience: Uncredited Experience:

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Quality Improvement VRC shall develop programs designed to improve the quality of care provided by the Radiologists and encourage identification and adoption of best demonstrated processes. Practice and VRC acknowledge that, in connection with such quality improvement activities, it may be necessary to provide VRC with Protected Health Information and Practice and VRC agree to treat such information in accordance with Article 9;

  • Feasibility Each of the Project Budget, the Project Schedule and the Disbursement Schedule is realistic and feasible.

  • Research Primary Investigator as part of a multi-site study (25 points) • Co-Investigator as part of a multi-site study (20 points) • Primary Investigator of a facility/unit based research study (15 points) • Co-Investigator of a facility/unit based research study (10 points) • Develops a unit specific research proposal (5 points) • Conducts a literature review as part of a research study (5 points)

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Feasibility Study A feasibility study will identify the potential costs, service quality and other benefits which would result from contracting out the work in question. The cost analysis for the feasibility study shall not include the Employer’s indirect overhead costs for existing salaries or wages and benefits for administrative staff or for rent, equipment, utilities, and materials, except to the extent that such costs are attributable solely to performing the services to be contracted out. Upon completion of the feasibility study, the Employer agrees to furnish the Union with a copy if the feasibility study, the bid from the Apparent Successful Bidder and all pertinent information upon which the Employer based its decision to contract out the work including, but not limited to, the total cost savings the Employer anticipates. The Employer shall not go forward with contracting out the work in question if more than sixty percent (60%) of any projected savings resulting from the contracting out are attributable to lower employee wage and benefit costs.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!