Increased Cost of Construction Sample Clauses

Increased Cost of Construction. Building codes change. If a structure was erected prior to the change, the building usually is “grandfathered” as to complying with the changes. However, if loss or damage to the building occurs the local government can mandate that the building be constructed or repaired to meet current building codes. This typically is not anticipated in developing the replacement cost of the building; therefore adequate limits will not provide protection for this situation. Coverage under this endorsement covers this gap in protection.
AutoNDA by SimpleDocs
Increased Cost of Construction. In the event of physical damage to “Covered Property” insured by a “Covered Peril,” this “Memorandum” is extended to cover the increased cost of repair or replacement occasioned by the enforcement of any local or state ordinance or law in any state regulating the construction, repair or demolition of buildings or structures, which is in force at the time such a loss occurs or which comes into force within six (6) months after such a loss occurs, which necessitates in repairing or replacing the building covered hereunder which has suffered damage or destruction by the “Covered Peril” or which has undergone demolition, limited, however, to the minimum requirements of such ordinance or law.
Increased Cost of Construction. This section covers the reasonable and necessary costs incurred, described below, to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition, construction, repair, replacement or use of buildings or structures, provided: a. Such law or ordinance is in force on the date of insured physical loss or damage; and b. Its enforcement is a direct result of such insured physical loss or damage; and c. This additional coverage does not cover any loss due to any law or ordinance with which you should have complied before the loss. d. The cost to repair or rebuild the physically damaged portion of such property with materials and in a manner to satisfy such law or ordinance; and e. The cost: (1) to demolish the physically undamaged portion of such property insured; and (2) to rebuild it with materials and in a manner to satisfy such law or ordinance to the extent that such costs result when the total demolition of the physically damaged insured property is required to satisfy such law or ordinance. f. This additional coverage excludes any costs incurred as a direct or indirect result of enforcement of any laws or ordinances regulating any form of contamination including but not limited to the presence of a pollutant or hazardous material. g. The maximum liability for this additional coverage at each covered property in any occurrence will not exceed the actual cost incurred in demolishing the physically undamaged portion of the property insured plus the lesser of: (1) The reasonable and necessary cost incurred, excluding the cost of land, in rebuilding on another site; or (2) The cost of rebuilding on the same site.
Increased Cost of Construction. 1) This Agreement covers the reasonable and necessary costs incurred, described in Item 3) below, to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition, construction, repair, replacement or use of buildings or structures at a Covered Property, provided: a. Such law or ordinance is in force on the date of covered physical loss or damage; and b. Its enforcement is a direct result of such covered physical loss or damage; and 2) This Additional Coverage does not cover any loss due to any law or ordinance with which the Named Member should have complied before the loss. 3) This Additional Coverage, as respects the property covered in Item 1) above, covers: a. The cost to repair or rebuild the physically damaged portion of such property with materials and in a manner to satisfy such law or ordinance; and b. The cost: (i) to demolish the physically undamaged portion of such property covered; and (ii) to rebuild it with materials and in a manner to satisfy such law or ordinance; to the extent that such costs result when the total demolition of the physically damaged covered property is required to satisfy such law or ordinance. SECTION I PROPERTY (continued) 4) This Additional Coverage excludes any costs incurred as a direct or indirect result of enforcement of any laws or ordinances regulating any form of contamination including but not limited to the presence of Pollution or hazardous material. 5) XXXX’s maximum liability for this Additional Coverage at each Covered Property in any occurrence will not exceed the actual cost incurred in demolishing the physically undamaged portion of the property covered in Item 1) above plus the lesser of: a. The reasonable and necessary cost incurred, excluding the cost of land, in rebuilding on another site; or b. The cost of rebuilding on the same site.

Related to Increased Cost of Construction

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the internal laws of the State of New York.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • Completion of Construction Within 60 days of the completion of construction of the Project, Project Owner shall deliver to DoD copies of the FAA form 7460-2 for each ASN, including the final coordinates for each turbine erected.

  • During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Governing Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the laws of the State of New York. The section headings in this Agreement have been inserted as a matter of convenience of reference and are not a part of this Agreement.

  • Definitions Construction (a) All initially capitalized terms used herein (including in the preamble and recitals hereof) without definition shall have the meanings ascribed thereto in the Credit Agreement (including Schedule 1.1 thereto). Any terms (whether capitalized or lower case) used in this Agreement that are defined in the Code shall be construed and defined as set forth in the Code unless otherwise defined herein or in the Credit Agreement; provided that to the extent that the Code is used to define any term used herein and if such term is defined differently in different Articles of the Code, the definition of such term contained in Article 9 of the Code shall govern. In addition to those terms defined elsewhere in this Agreement, as used in this Agreement, the following terms shall have the following meanings: