Integrated Solid Waste Management System Fundamentals Sample Clauses

Integrated Solid Waste Management System Fundamentals. Prior to the discussion of options related to waste recycling, energy recovery, and disposal, several fundamental concepts concerning solid waste management must first be discussed. One step essential to developing an ISWM system (and associated goals with respect to waste reduction and landfill diversion) is understanding the waste stream in terms of waste composition and generation rate (waste characterization). An element of ISWM planning neglected in many cases is the promotion of waste reduction. Another critical feature of solid waste management infrastructure is the system for collecting discarded materials from their point of origin and transporting them to the appropriate facility. These three aspects are described further in this section. The ISWM system may contain provisions for solid waste infrastructure funding by an assessment of impact fees on development (e.g., hotels, military installations) expected to cause or actively causing increased burdens on such infrastructure. In CNMI planned development includes hotels and casinos on Saipan (after the legislature passed a casino bill in early 2015) and potential military training facilities to be constructed on Tinian (Xxxxx 2015, NAVFAC 2015). Waste generated on Saipan and Tinian is expected to be taken to the Marpi landfill on Saipan (NAVFAC 2015). Waste quantities deposited in the Marpi landfill increased by 29.7% from 2012 to 2014, increasing the burden on the landfill’s operation. Xxxxxx-Xxxxx et al. (2011) estimated that the tipping fee for the Marpi landfill would need to be increased to cover the real costs of landfill operation, as current tip fees charged are insufficient to do so.
AutoNDA by SimpleDocs

Related to Integrated Solid Waste Management System Fundamentals

  • Solid Waste Management General. The Airport is required by city ordinance to achieve a solid waste recycling rate of 75% by 2012 and 100% by 2020. Tenants are required to cooperate with the Airport to maximize the rate of solid waste recycling and source separation. Airport’s Work. The Airport will supply specially designed solid waste containers for depositing paper, bottles and cans, and general trash in the public areas of the terminal including Tenant public areas. The Airport will provide waste containers for public disposal of food waste and compostable serviceware in the vicinity of Food and Beverage leaseholds. Tenant’s Work. Tenants are required to collect the solid waste generated in back offices in containers designated for paper, bottles& cans, and general trash and deposit the content of each container in the designated bins at collection areas. All Food and Beverage Concessions are required to collect food waste and compostable serviceware in separate containers and deposit the contents in designated compostable materials bins at collection areas.

  • Solid Waste The Licensee shall have to make arrangements for disposal of solid waste, which shall be got removed from the premises on a daily basis to ensure perfect cleanliness as per Corporation of Chennai Norms. The Licensee shall have to make arrangements for the solid waste to be separated into glass, plastic and food waste and for the food waste to be treated in a shredder to be converted into a paste. The waste shall need to be expelled into a common dump or waste area provided/ indicated by CMRL. If solid waste is found disposed of on CMRL land or premises a penalty/fine of Rs.2000/- shall be imposed by CMRL for each occasion.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Waste Management 4.1 Has your company been issued an EPA Hazardous Waste Generator I.D. Number? Existing Tenants should describe any additional identification numbers issued since the previous certificate. Yes [ ] No [ ]

  • Air Transportation In accordance with the standard provision entitled International Air Transportation, any international travel requires prior written approval from the FHI360 contracts administrator.

  • Fraud, Waste, and Abuse Contractor understands that HHS does not tolerate any type of fraud, waste, or abuse. Violations of law, agency policies, or standards of ethical conduct will be investigated, and appropriate actions will be taken. Pursuant to Texas Government Code, Section 321.022, if the administrative head of a department or entity that is subject to audit by the state auditor has reasonable cause to believe that money received from the state by the department or entity or by a client or contractor of the department or entity may have been lost, misappropriated, or misused, or that other fraudulent or unlawful conduct has occurred in relation to the operation of the department or entity, the administrative head shall report the reason and basis for the belief to the Texas State Auditor’s Office (SAO). All employees or contractors who have reasonable cause to believe that fraud, waste, or abuse has occurred (including misconduct by any HHS employee, Grantee officer, agent, employee, or subcontractor that would constitute fraud, waste, or abuse) are required to immediately report the questioned activity to the Health and Human Services Commission's Office of Inspector General. Contractor agrees to comply with all applicable laws, rules, regulations, and System Agency policies regarding fraud, waste, and abuse including, but not limited to, HHS Circular C-027. A report to the SAO must be made through one of the following avenues: ● SAO Toll Free Hotline: 1-800-TX-AUDIT ● SAO website: xxxx://xxx.xxxxx.xxxxx.xx.xx/ All reports made to the OIG must be made through one of the following avenues: ● OIG Toll Free Hotline 0-000-000-0000 ● OIG Website: XxxxxxXxxxxXxxxx.xxx ● Internal Affairs Email: XxxxxxxxXxxxxxxXxxxxxxx@xxxx.xxxxx.xx.xx ● OIG Hotline Email: XXXXxxxxXxxxxxx@xxxx.xxxxx.xx.xx. ● OIG Mailing Address: Office of Inspector General Attn: Fraud Hotline MC 1300 P.O. Box 85200 Austin, Texas 78708-5200

  • AIR TRANSPORT 1. Profits derived by an enterprise of a Contracting State from the operation of aircraft in international traffic shall be taxable only in that State.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Musculoskeletal Injury Prevention and Control (a) The Hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

Time is Money Join Law Insider Premium to draft better contracts faster.